Rejobs
NextEra Energy

Cable Splicer

Bliv kabelsplicer hos NextEra Energy i Florida. Udfør vedligeholdelse af underjordiske anlæg og sikr sikkerhed under operationer. Få en fuldtidsstilling med mulighed for relocation og omfattende fordele.
NextEra Energy
NextEra Energy
  På stedet   Fuldtid  UTC-05:00

NextEra Energy

Virksomhedsoversigt

NextEra Energy

Juno Beach, Florida, USA

1925

Forretningsmodel

Energi

Produktion af vedvarende energi, eldistribution og energiløsninger

El-salg, energiløsninger, vedvarende energiprojekter

Lokationer & Geografi

USA, Canada, Brasilien, Mexico, Spanien

Virksomhedskultur

Deres mission er at levere ren, pålidelig og overkommelig energi til kunderne.

De fremmer et inkluderende og sikkert arbejdsmiljø, der understøtter innovation og samarbejde.

De tilbyder omfattende trænings- og udviklingsprogrammer for medarbejdere.

Aktiviteter & Projekter

Udvikling af sol- og vindenergiprojekter i hele USA.

Implementering af avancerede energilagringsløsninger og smart grid-teknologier.

Fokus på at reducere CO2-udledningen og fremme vedvarende energikilder.

Karrieremuligheder

Ingeniører, projektledere, energikonsulenter, tekniske specialister.

Fleksible arbejdstider, sundhedsforsikring, pensionsordninger, medarbejderaktier.

Kontaktinformation

LinkedIn

Karrierer hos NextEra Energy


Sidst opdateret den 2025-09-06 | Rapporter et problem

Job Description

Cable Splicer will be expected to perform all associated tasks with the construction and maintenance of all underground facilities. Must be able to trouble shoot and repair all underground distribution circuits and equipment. Cable Splicer may work alone or be assigned to work with other Splicers or lower classifications without the direct supervision of a higher level classification. Will be expected to safely perform all distribution underground switching and overhead switching as needed. May be required to work in inclement weather for extended hours, may be required to travel throughout the system in cases of emergencies and storms to restore the system. Will be responsible for all assigned work being done in accordance with all company design standards and work methods. Will be required to prepare all job associated paperwork.

Required Qualifications

  • Post-Offer Functional Capacity Eval
  • Commercial Driver's License, Class A
  • Must have satisfactorily completed the FPL apprentice cable splicer or another equivalent recognized program.
  • Must be physically able to do all assigned tasks.
  • Must be able to work in direct sunlight or at night.

Preferred Qualifications

  • Minimum of two (2) years verifiable work experience as a Certified Cable Splicer

NextEra Energy offers a wide range of benefits to support our employees and their eligible family members. Click here to learn more.

Employee Group: Bargaining Unit
Employee Type: Full Time
Job Category: Power Systems Bargaining Unit
Organization: Florida Power & Light Company
Relocation Provided: Yes, if applicable

NextEra Energy is an Equal Opportunity Employer. Qualified applicants are considered for employment without regard to race, color, age, national origin, religion, marital status, sex, sexual orientation, gender identity, gender expression, genetics, disability, protected veteran status or any other basis prohibited by law.

NextEra Energy provides reasonable accommodation in its application and selection process for qualified individuals, including accommodations related to compliance with conditional job offer requirements, consistent with federal, state, and local laws. Supporting medical or religious documentation will be required where applicable and permitted by applicable law. To request a reasonable accommodation, please send an e-mail to [email protected], providing your name, telephone number and the best time for us to reach you. Alternatively, you may call 1-844-694-4748. Please do not use this line to inquire about your application status.

NextEra Energy will not discharge or in any other manner discriminate against employees or applicants because they have inquired about, discussed, or disclosed their own pay or the pay of another employee or applicant. However, employees who have access to the compensation information of other employees or applicants as a part of their essential job functions cannot disclose the pay of other employees or applicants to individuals who do not otherwise have access to compensation information, unless the disclosure is (a) in response to a formal complaint or charge, (b) in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or (c) consistent with the contractor's legal duty to furnish information.

NextEra Energy does not accept any unsolicited resumes or referrals from any third-party recruiting firms or agencies. Please see our policy for more information.

Få jobvarsler

Få jobalarmer for muligheder i Miami, Florida, USA

Om rollen

2. november 2025

Fuldtid

Virksomhed

2. november 2025

På stedet

NextEra Energy

  •  Miami, Florida, USA
  •  Naples, Florida, USA
  •  Hialeah, Florida, USA
  •  Hollywood, Florida, USA

Minimum of two years as a Certified Cable Splicer

UTC-05:00

Ansøg nu

Job udløbet?

Lad venligst NextEra Energy vide, at du fandt dette job på Rejobs. Dette vil hjælpe os med at vokse og få flere mennesker til at arbejde med vedvarende energi!

Hvordan du er forbundet via LinkedIn

Se forbindelser

Se dine kontakter hos NextEra EnergyLinkedIn for at udnytte dit netværk, når du søger denne stilling.

Del med venner

Indsatserne er høje, og tiden til snak er forbi. Nu er det tid til handling. Hjælp en ven med at fremskynde overgangen til en bæredygtig fremtid.

Del dette job - Cable Splicer - med dine venner, og hjælp dem med at finde en karriere, de kan være stolte af.