Quality Manager
Goldwind
Virksomhedsoversigt
Goldwind Technology Co., Ltd.
Kina, Beijing
1998
Over 10.000 ansatte globalt (source: linkedin.com). Indtægter på 6,7 milliarder USD i 2024 (source: goldwindamericas.com).
Deres Forretning
Goldwind Technology fokuserer på vindenergi-teknologi, især store vindmøller (WTGs), der anvender permanent magnet direkte drev (PMDD) teknologi. Af de over 26.000 producerede vindmøller har mere end 23.000 denne design for at forbedre effektiviteten og reducere vedligeholdelsesomkostningerne (source: wikipedia.org). Goldwinds produkter og tjenester dækker fire hovedområder: vindmøllefremstilling (forskning, udvikling, produktion og salg af vindmøller og deres reservedele), vindenergitjenester (byggeri, vedligeholdelse efter garantien, aktivforvaltning), udvikling af vindparker (udvikling, drift og salg af vindparker), samt andre tjenester, herunder solenergi-projekter og finansiel leasing. Goldwind tilbyder også integrerede løsninger fra planlægning, vurdering af vindressourcer, gennemførlighedsstudier, design, udbud, byggeri til drift og vedligeholdelse, og hævder at kunne opnå 10-20% stigninger i energiproduktion og 5-10% omkostningsreduktion (source: goldwindamericas.com).
Projekter og Præstationer
Goldwinds bemærkelsesværdige projekter inkluderer Daban City vindpark i Kina (det første vindkraftværk fra 1989, der bruger 150kW vindmøller), installationen af 500MW PMDD vindmøller af Goldwind Americas i USA, to projekter i Texas erhvervet i 2016-2017, i alt 300MW, samt Penonome I og II vindparker i Panama (i alt 270MW i forvaltning/drift). Ifølge de seneste opgørelser har Goldwind en samlet installeret kapacitet på over 40GW globalt og har installeret 26.000 vindmøller (source: wikipedia.org). Virksomheden udvikler og driver vind- og solenergi-projekter globalt, og Goldwinds datterselskab i Australien ejer og driver lokale aktiver, og modtog i 2010 et lavrentelån på 6 milliarder USD fra den kinesiske udviklingsbank til udvidelse (source: goldwindamericas.com).
Seneste Udviklinger
I september 2021 annoncerede Goldwind Technology, at deres GW 5S intelligente vindmølle (landtest-enhed over 5 megawatt) var blevet tilsluttet nettet, hvilket markerer en teknologisk milepæl (source: zoominfo.com). Goldwind har opretholdt en markedsandel på 20-25% i det kinesiske vindmøllemarked frem til 2024, uden registrerede større opkøb, fusioner eller finansieringsrunder, bortset fra lånet på 6 milliarder USD i 2010; virksomheden har modtaget investeringsgrad kreditvurderinger fra Standard & Poor's Global og Moody's, og er det første kinesiske selskab, der udsteder grønne obligationer (source: wikipedia.org).
Arbejdsmiljø
Goldwind Technology tilbyder stillinger inden for vindmøllefremstilling (forskning og udvikling, ingeniørarbejde, produktion), vindenergitjenester (byggeri, vedligeholdelse, aktivforvaltning), udvikling af vindparker (projektudvikling, drift) og mere, med over 1.000 forsknings- og udviklingsingeniører blandt de ansatte, som samlet set er over 10.000 (source: zoominfo.com). Rekruttering foregår primært på hovedkontoret i Beijing, Urumqi, Chicago i USA og andre byer, selvom der er blevet sporet en stigning i ansættelsesindikatorer for nylig, er der ingen specifik rekrutteringsinformation (source: goldwindamericas.com). Virksomhedskulturen lægger vægt på interessenters interesser (medarbejdere, kunder, leverandører, samfund), og har implementeret talentmarkedsføring fra 2006-2010 og professionel ledelsesomstrukturering fra 2011-2015 (source: wikipedia.org).
Kontaktinformation
Sidst opdateret den 2025-12-26 | Rapporter et problem
Job Description
The Quality Manager will oversee, inspect, and document the quality of all activities related to the delivery of components, pre-assembly, mechanical, electrical installation and Commissioning on De Aar site
Work Location
DeAar town at Northern Cape
Position Responsibilities
- Perform thorough inspections of all delivered wind turbine components upon arrival at the site. Verify that all component documentation, including quality certificates, material
- Inspect the interface between the foundation/transition piece and the first tower section, ensuring correct alignment, leveling, and grouting quality.
- Document and report findings, ensuring accurate and timely communication with project management and relevant stakeholders.
- Collaborate with the construction and engineering teams to address and rectify any identified issues or defects.
- Adhere to and enforce safety standards and regulations during all inspections.
- Align and implement the Quality Management Plan in accordance with the Project Requirements
- Develop, Implement and execute the ITP for all construction phases, holding points, and sign-offs.
- Identify, record, and document all quality deviations, defects, or non-conformances. Track the implementation and effectiveness of Corrective Action Reports (CARs) until final resolution.
- Maintain a comprehensive and traceable record of all inspection reports, test results, calibration certificates for tools (e.g., torque wrenches), and final handover documentation (As-Built files).
- Participate in internal and external Quality Audits as required by the client or regulatory bodies.
- Develop Quality related procedures
Qualification
Diploma or Senior Certificate in Mechanical / Electrical / Industrial Engineering / NDT /Certified Welding Inspector (CWI)
Skills
- 5 years' experience in the Renewable Energy industry or Construction
- Excellent written and verbal communication skills for clear reporting and effective coordination with technicians, supervisors, and client representatives
- Proficiency in using inspection tools and equipment
- Experience in managing Non-Conformances relate Quality.
- Strong understanding of mechanical, structural, and high-voltage electrical systems, particularly as they relate to wind turbine technology.
- Meticulous approach to reviewing blueprints, specifications, and data logs.
- Ability to conduct or support Root Cause Analysis (RCA) for recurring quality issues.
- Ability to work in challenging outdoor environments, including confined spaces and at significant heights (after necessary training).
Få jobvarsler
Få påmindelser om jobs inden for Vindenergi i De Aar, Northern Cape, Sydafrika
Om rollen
8. december 2025
Fuldtid
Virksomhed
30. december 2025
På stedet
- De Aar, Northern Cape, Sydafrika
5 years in Renewable Energy or Construction
UTC+02:00
Ansøg nu
Job udløbet?Lad venligst Goldwind vide, at du fandt dette job på Rejobs. Dette vil hjælpe os med at vokse og få flere mennesker til at arbejde med vedvarende energi!
Hvordan du er forbundet via LinkedIn
Se forbindelserSe dine kontakter hos Goldwind på LinkedIn for at udnytte dit netværk, når du søger denne stilling.
Lignende job i nærheden af De Aar, Northern Cape, Sydafrika
Del med venner
Indsatserne er høje, og tiden til snak er forbi. Nu er det tid til handling. Hjælp en ven med at fremskynde overgangen til en bæredygtig fremtid.
Del dette job - Quality Manager - med dine venner, og hjælp dem med at finde en karriere, de kan være stolte af.