职位描述
Fuse Energy is a forward-thinking renewable energy startup on a mission to deliver a terawatt of renewable energy - fast. We're combining first-principles thinking with cutting-edge technology to build a radically better energy system. We raised $210M from top-tier investors including Multicoin, Balderton, Lakestar, Accel, Creandum, Lowercarbon, Ribbit, Box Group and strategic angels like Nico Rosberg, the Co-Founder of Solana and GPs behind Meta, Revolut, Spotify, Uber and more.
We're creating a fully integrated energy company: from developing renewable generation and grid infrastructure to powering the next generation of AI and compute-intensive industries. But we're not stopping there. We're also building the Energy Network: a decentralised platform of smart devices to electrify our homes, shifting usage to off-peak hours and helping balance the grid. This network strengthens grid stability - a critical foundation for scaling AI data centers and other energy-intensive industries.
As AI drives unprecedented demand for power and data center capacity, the bottleneck is no longer chips - it is energy, grid infrastructure, and the ability to deliver new capacity at speed.
We are looking for a Data Center Development Lead to help solve that problem. You will be responsible for taking data center projects from concept through to Ready-to-Build and energisation. You will own the technical and development workstreams required to transform a site from an opportunity into a deliverable project. You will work across site selection, power strategy, grid connections, planning, engineering, design development, permitting, utility engagement, and delivery readiness.
This is a highly technical role for someone who understands both infrastructure development and engineering. You will help build the infrastructure that enables the next generation of AI.
Responsibilities
- Lead data center developments from early-stage opportunity through Ready-to-Build and energisation
- Assess sites from technical, planning, power, and infrastructure perspectives
- Develop grid connection and power strategies with National Grid, DNOs, and utility providers
- Support planning, permitting, and stakeholder engagement processes
- Identify and mitigate technical and development risks
- Ensure projects are deliverable, scalable, and aligned with construction requirements
Requirements
- Experience developing data centers or large-scale infrastructure projects
- Strong technical understanding of data center infrastructure, including power, cooling, and utility systems, with the ability to evaluate engineering decisions and challenge technical assumptions
- Strong understanding of ERCOT planning and grid connection processes
- Experience taking projects from early-stage development through design, permitting, and delivery readiness
- Highly analytical, self-directed, and comfortable with significant ownership
Benefits
- Competitive salary
- Biannual bonus scheme
- Fully expensed tech to match your needs
- Breakfast and dinner allowance for office based employees
同类岗位的典型薪资
估算过去 24 个月内 Rejobs 上该群组广告薪资的中间一半。该雇主未标明薪资。
职位详情
关于 Fuse Energy
公司概况
Fuse Energy,前身为Tesseract;持牌供电公司为Fuse Energy Supply Limited
英国伦敦
2022年
业务范围
Fuse Energy是一家受英国能源监管机构Ofgem监管的能源供应商,服务45万户英国家庭,并于2025年在电力之外开始供应天然气。公司由Revolut前高管Alan Chang和Charles Orr创立,采用垂直一体化模式:自建可再生能源电站,发电并开展电力交易,向客户供电,并负责安装和硬件。公司借助为每处客户房产建立的数字孪生来预测用电需求。
公司的既定计划是在住宅、企业和公用事业规模项目中部署1 TW低成本太阳能和电池储能,并建设燃气轮机,填补可再生能源发电的缺口。面向家庭,公司销售智能电池Jules,现已开放预订,公司称每年最多可节省330英镑。其算力业务在英国的Fuse数据中心提供单租户NVIDIA GPU,近期开发项目储备达142 MW。
项目与业绩
Fuse已投运22 MW,在建及开发中的项目达376.1 MW,目标为1,000 MW。已投运的站点包括英格兰Netley的Netley Central(3.7 MW)和Netley North(5.1 MW)、英格兰Okehampton的Bullous Park(12.1 MW),以及苏格兰Moray的Balnamoon(0.8 MW)。2026年5月,公司表示一个近期完工的太阳能项目每兆瓦峰值成本比行业平均水平低30%。
近期动态
2025年12月,Fuse融资7,000万美元,估值达50亿美元,本轮由Balderton Capital和Lowercarbon Capital领投,资金用于加快国际扩张;当时公司计划在爱尔兰、西班牙和美国拓展业务。2026年6月,20VC和Collaborative Fund追加投资3,000万美元,作为B轮融资的延伸。Fuse当时表示,自2025年12月以来每月EBITDA均为正,年度经常性收入已超过5.5亿美元。
2026年5月,Fuse从Caerphilly County Borough Council购得Cwm Ifor太阳能电站项目,预计该电站可为最多6,000户家庭供电,并于2026年12月并网。公司还在爱尔兰组建业务部门,以都柏林为基地;其首批算力容量0.7 MW、192块NVIDIA B300 GPU计划于2026年12月上线。
工作环境
Fuse正在伦敦金丝雀码头开设占地32,000平方英尺的新总部,并于2026年6月计划在随后一年内招聘380多名员工。公司在英国的自有EPC团队负责公用事业规模电池储能和光伏项目的设计;在西班牙,公司正在招聘施工负责人,负责光伏、电池储能、风电、燃气调峰电站和数据中心项目。其招聘广告列出的福利包括有竞争力的薪酬和股权资格、每半年一次的奖金、私人医疗保险,以及为办公室员工提供的早餐和晚餐补贴;福利因工作地点而异。