职位描述
Enfinity Global is looking for a Senior Interconnection Leader with 10-15 years of experience who will be responsible for managing the transmission-level interconnection process for utility-scale solar, battery energy storage projects and large load interconnection across the United States.
The candidate should possess deep technical expertise in FERC regulations, interconnection studies, and grid integration, while demonstrating strong project management and stakeholder coordination skills. This position requires extensive collaboration with US-based teams, utilities, Independent System Operators (ISOs), Regional Transmission Organizations (RTOs), and engineering consultants.
The role demands an individual who is highly organized, strategic, and capable of managing complex interconnection processes from initial feasibility through Commercial Operation Date (COD). The successful candidate will serve as the primary point of contact with transmission providers and ISO/RTO interconnection departments, managing a portfolio of projects totaling multiple gigawatts.
This opportunity provides significant exposure to the US energy market and interconnection reform landscape including FERC Order 2023 implementation. Candidates will work closely with key stakeholders based in the US and will require flexibility to overlap 3-4 hours daily with US business hours.
Key Responsibilities
Interconnection Process Management
- Lead and manage the complete interconnection queue process for transmission-level renewable energy projects (solar, wind, and battery storage) from initial site selection and feasibility through Commercial Operation Date (COD), ensuring compliance with all regulatory and technical requirements.
- Coordinate and submit interconnection applications, deposits, study agreements, and all required technical documentation to utilities, ISOs/RTOs including CAISO, ERCOT, PJM, MISO, SPP, NYISO, and ISO-NE within prescribed deadlines.
- Manage queue positions and track interconnection study milestones including Cluster Studies, System Impact Studies (SIS), Facilities Studies (FS), and Affected System Studies across multiple ISO/RTO markets simultaneously.
- Review, analyze, and challenge interconnection study results including load flow analysis, short circuit studies, stability analysis, and network upgrade requirements to optimize project economics and timelines.
- Negotiate and execute Interconnection Agreements (IAs), Generator Interconnection Agreements (GIAs), and Large Generator Interconnection Agreements (LGIAs), including cost allocation, construction schedules, and milestone payment terms.
- Manage interconnection financial commitments including study deposits, security postings, milestone payments, and network upgrade funding in accordance with FERC-approved tariff requirements.
Technical Coordination & Analysis
- Collaborate with internal engineering teams and external consultants to develop technical specifications, electrical one-line diagrams, and three-line diagrams for interconnection applications, ensuring accuracy and compliance with utility standards.
- Conduct comprehensive due diligence reviews and technical feasibility assessments for potential project sites, evaluating transmission capacity, congestion patterns, and available interconnection options.
- Evaluate and forecast network upgrade costs including reliability upgrades, delivery network upgrades, stand-alone network upgrades, and cost allocation methodologies under shared funding scenarios.
- Assess and recommend alternative Point of Interconnection (POI) options, voltage levels, and interconnection configurations to optimize project economics, construction schedules, and commercial viability.
- Support transmission planning activities including transmission service requests (TSRs), Network Resource Interconnection Service (NRIS) applications, and participation in regional transmission planning processes.
- Monitor, interpret, and implement changes to utilities, ISO/RTO interconnection procedures, FERC Order compliance (Order 2023, 2023-A), queue reform initiatives, and cluster study process modifications across all relevant markets.
Stakeholder Management & Communication
- Serve as primary point of contact with transmission owners, transmission providers, utility interconnection departments, and ISO/RTO interconnection staff, building and maintaining productive long-term working relationships.
- Coordinate closely with US-based development, origination, engineering, legal, and finance teams requiring regular availability during overlapping business hours.
- Participate in ISO/RTO stakeholder meetings, interconnection working groups, and industry forums to stay current on policy developments and advocate for company positions on interconnection reform matters.
- Prepare and deliver regular status updates, risk assessments, and executive summaries to senior management on portfolio-level interconnection progress, upcoming milestones, and potential risks.
- Lead resolution of interconnection disputes, study delays, and billing discrepancies through direct engagement with utility staff, escalation procedures, and formal complaint processes when necessary.
- Manage and provide technical oversight to external consultants and engineering firms supporting interconnection studies, deliverable preparation, and utility coordination activities.
Portfolio Management, Data Analytics & Process Improvement
- Maintain comprehensive interconnection tracking systems, databases, and project management tools for a portfolio of projects totaling multiple gigawatts across various development stages.
- Monitor queue positions, withdrawal risks, restudy impacts, and queue reform implementation effects across multiple utilities and ISO/RTO markets, proactively identifying opportunities and risks.
- Develop and maintain interconnection cost forecasts, timeline projections, and risk registers for financial modeling, budgeting, and project valuation purposes.
- Analyze interconnection study data from customer engagement meetings, scoping meetings, and draft study reports to support informed strategic decision-making and site optimization.
- Track regional transmission planning processes, proposed transmission projects, and policy changes that may impact interconnection feasibility or project economics.
- Develop and implement best practices, standard operating procedures, templates, and lessons learned documentation to improve efficiency and reduce execution risk across the interconnection portfolio.
- Create and maintain interconnection playbooks, process workflows, and training materials for internal teams to ensure consistent execution and knowledge transfer.
Requirements
The candidate will require exceptional written and verbal communication skills, strong technical analysis capabilities, and experience navigating multiple utilities and ISO/RTO markets. The ideal candidate thrives in a dynamic, fast-paced environment with ambitious growth strategies.
Qualifications & experience
Education
- Bachelor's degree in Electrical Engineering, Power Systems Engineering, or related technical field (Master's degree preferred).
Experience
- 10-15 years of hands-on experience managing transmission-level interconnection processes for utility-scale renewable energy projects.
- Proven track record of successfully navigating interconnection queues with at least 5+ projects through to executed Interconnection Agreements.
- Direct experience working with multiple U.S. Utilities & ISO/RTO markets.
- Experience with solar, battery energy storage system (BESS), and large load interconnection projects.
- Background working with IPPs, renewable energy developers, or utilities in project development roles.
Technical Expertise
- Deep understanding of FERC regulations, NERC standards, and transmission planning principles.
- Comprehensive knowledge of Large Generator Interconnection Procedures (LGIP), Large Load Interconnection and interconnection study methodologies.
- Proficiency in interpreting power system studies including load flow, short circuit, stability, and EMT studies.
- Working knowledge of power systems modeling software and tools such as PSS/E, PSLF, PSCAD, PowerWorld, or TARA for reviewing and validating study results.
- Familiarity with electrical single-line diagrams, substation design concepts, protection and control systems, and transmission system configurations.
- Knowledge of reactive power requirements, voltage regulation, and grid code compliance for renewable generation.
Skills & Competencies
- Exceptional written and verbal communication skills.
- Strong project management capabilities with ability to manage multiple complex projects simultaneously.
- Excellent stakeholder management and negotiation skills with utilities, transmission owners, and system operators.
- Proficiency with Microsoft Office Suite, project management, and CRM.
- Strong analytical and problem-solving abilities with attention to detail.
- Self-motivated with ability to work independently in a remote environment.
- Creative thinker, trying to find new ways of optimizing interconnection strategies.
- Hands-on mentality and focus on getting things done.
- Taking ownership and wanting to get things right.
Preferred Qualifications
- Experience with co-located or hybrid projects (solar + storage, wind + storage).
- Familiarity with offshore wind interconnection processes.
- Knowledge of transmission congestion, LMP pricing, and merchant transmission development.
- Experience participating in ISO/RTO stakeholder meetings and working groups.
- Background in power systems modeling software (PSS/E, PSCAD, PowerWorld, etc.).
- Previous experience working for a US-based company from an India office.
In Enfinity Global you will find a very dynamic and multinational environment in one of the most exciting and impactful industries. Here we will foster your professional and personal growth, and you will have the opportunity to actively contribute and make a real impact on climate change.
Let's build our future together.
同类岗位的典型薪资
估算过去 24 个月内 Rejobs 上该群组广告薪资的中间一半。该雇主未标明薪资。
职位详情
关于 Enfinity Global
公司概况
业务介绍
Enfinity Global专注于开发、融资、建设、拥有及运营太阳能光伏(PV)系统、电池储能系统(BESS)及相关电力基础设施,主要面向需要大规模、持续供电的商业、工业和机构客户(来源:enfinity.global)。公司重点布局公用事业规模的太阳能项目和长期能源合同,而非零售消费者电力,强调通过多元化的全球市场组合实现可靠的全天候电力供应(来源:enfinity.global)。Enfinity业务遍及美国、意大利、印度、日本及欧洲其他地区,管理着庞大的可再生能源和储能项目管线,为企业和工业客户提供可持续电力解决方案(来源:enfinity.global)。公司的商业模式融合项目开发、资产所有权及长期电力购买协议,确立其作为全球企业客户清洁能源基础设施领先供应商的地位(来源:linkedin.com)。
项目与业绩
到2025-2026年,Enfinity Global已建立了超过39吉瓦的可再生能源及储能项目组合,其中包括1.2吉瓦的运营容量和1.6吉瓦的在建项目(来源:enfinity.global)。仅在意大利,公司截至2026年7月报告运营太阳能容量超过535兆瓦,另有460兆瓦在建,以及约8.5吉瓦的太阳能和储能项目管线(来源:enfinity.global)。公司还通过意大利能源释放2.0机制签订了1.8太瓦时的双边协议,关联约120兆瓦的新太阳能光伏容量,满足工业需求(来源:enfinity.global)。在美国,Enfinity运营400兆瓦,450兆瓦在建,并管理着22吉瓦的项目管线,截至2026年初,包括在德州扩建425兆瓦电池储能项目及收购425兆瓦BESS组合(来源:enfinity.global)。在日本,公司于2024年并网99兆瓦,并于2025年完成首个储能项目,战略合作伙伴为三菱HC资本能源,推动BESS市场发展(来源:enfinity.global)。在印度,Enfinity到2025年获得2吉瓦太阳能和风能项目的接入许可,2022年新增近205兆瓦太阳能容量(来源:enfinity.global)。客户组合包括与微软在意大利签订的366兆瓦电力购买协议(PPA),首个33.8兆瓦交流项目于2026年1月商业运营,及其他数百兆瓦的重要PPA合同(来源:prnewswire.com)。
最新动态
过去两年,Enfinity Global经历了强劲的资本募集和扩张阶段,在意大利获得4.81亿欧元项目融资,并与野村证券扩大美国结构性信贷额度至2.45亿美元,同时与埃菲尔投资集团达成1.83亿美元债券融资支持太阳能光伏及储能部署(来源:enfinity.global)。公司完成了美国425兆瓦电池储能资产收购,并将意大利402兆瓦少数股权出售给SOFAZ,进一步多元化资本结构(来源:enfinity.global)。此外,Enfinity宣布与Strioga家族基金会战略共投意大利150兆瓦储能项目,强化其对长时储能解决方案的承诺(来源:enfinity.global)。公司荣获2025年两项Inspiratia能源转型奖,并根据2025年Pexapark报告,位列欧洲第五大PPA卖方(来源:enfinity.global)。
工作环境
Enfinity Global在项目开发、工程、财务、运营、法律、商务及企业职能等多个领域提供职业机会,体现其集成资产开发及独立电力生产商模式(来源:indeed.com)。公司在迈阿密、意大利、西班牙、荷兰、印度和日本设有办公室,职位发布显示美国境内支持远程工作,促进地域流动性和国际协作(来源:linkedin.com)。职位福利包括医疗、牙科和视力保险,401(k)或退休计划支持,有薪休假及残疾保险,体现全面的员工支持体系(来源:indeed.com)。公司文化以快速增长、国际视野及资本密集型环境为特征,专注于大规模基础设施建设、项目融资及长期资产管理,吸引对动态执行和可再生能源创新感兴趣的候选人(来源:enfinity.global)。
您的 LinkedIn 人脉
在 LinkedIn 上查看您在 Enfinity Global 的联系人,申请时善用您的人脉。
查看人脉