职位描述
The purpose of the Hydro Plant Technician is to support the overall operation of the hydro-electric power plant and the associated water intakes to maximize the reliability and efficiency of the electrical generating system. Safety being front of mind is paramount to our success, as is a strong commitment to environmental and regulatory compliance.
This position requires a standard 40 hour work week (8hrs Monday-Thursday, 4hrs on Fridays, 2hrs Saturday-Sunday) with the ability to respond to alarms at any time.
Why Eagle Creek?
- A comprehensive benefits plan: Medical, Dental, Vision, HSA, FSA, Commuter benefits, Voluntary Life, 401(k) match.
- Eleven paid holidays per year, plus a competitive PTO schedule and time off to volunteer or give back to your community.
- Access to a company-funded Employee Assistance Program.
- Employee discounts through ADP LifeMart.
- Tuition Reimbursement as well as access to trainings & mentors for Career Progression and Personal Development.
What you'll do
- Conduct daily plant and intake inspections.
- Start and stop the generating units and auxiliary equipment per established procedures.
- Conduct safety inspections and monitor security systems, keeping accurate logs and reports.
- Operate heavy equipment as well as an assortment of hand and power tools including chain saws.
- Perform routine and preventive maintenance in support of the reliability of the plant.
- Work on a rotating schedule to cover weekend duty and holidays.
- Assist in developing plant safety procedures and JSA procedures.
- Respond to calls at all hours of the day to react to emergent plant issues.
- Coordinate and supervise contractors in the performance of their activities.
- Participate in any safety programs developed by the company.
What you'll need
- At least two years of related experience in a power plant or industrial setting highly preferred.
- An unwavering commitment to safety, both for ECRE employees and contractors and the public in general.
- Instrumentation and control system experience, including troubleshooting of PLC based control systems and general calibration of instrumentation devices preferred.
- Ability to communicate and report all downtime related events in a timely manner to the regional manager.
- Experience with basic industrial maintenance techniques preferred.
- The ability to maintain a valid driver's license.
- High school diploma or equivalent required.
- Vocational certificate or degree in Engineering or Physical Sciences preferred.
- Experience with Microsoft Office Suite (Teams, Word, Outlook, etc.) for use in business communication.
Physical Requirements
-
Ability to perform manual tasks including but not limited to:
- The operation of hand and power tools and the ability to lift at least 50 lbs.
- Being able to bend and maneuver in tight, cramped quarters.
- Ability to work in hot, noisy, and dark environments, often alone and isolated.
- Comfortability working at heights and around water.
- Ability to work with and wear respiratory protection.
- Reach with hands and arms above shoulder level and at shoulder level.
- Walk, stand, stoop, kneel, and bend for prolonged periods of time.
- Grip and manually manipulate, often in repetitive motion, items such as but not limited to hand tools and machine parts.
- Read and identify labels, gauges, dials, and indicators typically encountered in performing job duties.
-
Possess clear and effective verbal communication in all circumstances, including emergency situations and giving/receiving instructions over a radio.
Eagle Creek Hydro Operations, LLC is an equal opportunity employer
薪资与福利
同类岗位的典型薪资
估算过去 24 个月内 Rejobs 上该群组广告薪资的中间一半。该雇主未标明薪资。
职位详情
关于 Eagle Creek Renewable Energy
公司概况
业务范围
Eagle Creek Renewable Energy成立的宗旨是收购、改进和运营水电设施,如今在美国18个州拥有85座水电站,总装机容量690兆瓦。这些电站每年发电近27亿千瓦时,足以满足超过26万户家庭的用电需求。在85座设施中,有84座受美国联邦能源监管委员会(FERC)管辖,公司目前有22项许可证续期程序正在进行。
2024年,Eagle Creek收购了Lightstar Renewables,使发电结构更加多元,该公司拥有1.3吉瓦的开发中项目储备。在伊利诺伊州,Lightstar的业务涵盖社区太阳能、农光互补和电池储能三条业务线。
项目与业绩
Eagle Creek最初运营的是纽约州Mongaup River的三座电站系统,2012年收购了North American Hydro的中西部资产组合。自2013年以来,公司通过收购运行中、部分运行和停运的电站不断扩张,并已修复和改进了超过25台此前停运的水轮机。
Ontario Power Generation于2018年11月收购Eagle Creek,近一年后又收购了Cube Hydro,并将两家公司合并,统一使用Eagle Creek Renewable Energy这一名称。Cube Hydro曾于2017年收购北卡罗来纳州Yadkin River的四座电站系统,Yadkin项目总装机容量为215兆瓦。在佛蒙特州,Eagle Creek于2016年在Ball Mountain大坝建成一座2,200千瓦的电站,并在Townshend大坝建成一座900千瓦的电站。
近期动态
Apollo Global Management管理的基金于2026年1月收购了Eagle Creek。2026年10月,Eagle Creek与Relevate Power建立战略合作伙伴关系,负责管理Relevate旗下的径流式水电项目组合,Relevate此前为管理该组合而雇用的当地运营人员将加入Eagle Creek。
2025年1月,Eagle Creek最终敲定了美国能源部280万美元的拨款,用于弗吉尼亚州、西弗吉尼亚州、宾夕法尼亚州和缅因州八座水电站的能效升级,这些升级将使电站发电量提高3%至24%。
Lightstar于2025年9月庆祝Plains Road项目启动,这是纽约州首个公用事业规模的农光互补项目。2026年8月,Lightstar是新泽西州首轮Dual-Use Solar Energy Pilot Program中仅有的三家获得有条件授标的开发商之一,共获得八项授标,总容量约27.3兆瓦。2026年11月,Paxton市议会批准了Lightstar的Baltimore Drive Solar Project土地并入协议,该项目是位于伊利诺伊州Ford County的一座4.95兆瓦(交流)社区太阳能电站。
工作环境
除马里兰州Bethesda的总部外,Eagle Creek还在Florham Park(新泽西州)、Badin(北卡罗来纳州)和Neshkoro(威斯康星州)设有办公室。2026年11月,其招聘平台列出了密歇根州、纽约州和新罕布什尔州水电站的运行员和技术员职位,以及Badin的IT职位。公司还在招聘Bethesda的企业法律顾问、业务开发总监、中西部和东北部地区的环境、健康与安全协调员,以及能源经理兼交易员。
根据其招聘广告,福利可能包括医疗、牙科和视力保险以及401(k)退休计划雇主配款,此外还有HSA和FSA账户、通勤福利、自愿人寿保险,以及包含社区志愿服务假期在内的节假日和带薪休假安排。