At Northland, we're enablers of change, united by our journey to transform the energy sector into the foundation for a sustainable future.
Since our inception, we've been early movers in the energy industry, adopting new initiatives that pave the way for communities across the globe and helping forge their path towards a carbon-neutral landscape.
We're a different kind of independent power producer. As developers, owners and operators who are at the forefront of the energy transition, we're uniquely positioned to leave a lasting impact in the regions where we operate. We've expanded our business across Canada, the United States, Latin America, Europe and Asia to become a global leader, all by bringing together industry experts to find solutions with an entrepreneurial mindset.
While our work powers communities across the globe, Northland is powered by our people.
Our current presence in Poland: Our Baltic Power offshore wind farm is the most advanced offshore wind project in Poland and the first to have achieved first power. The Baltic Power offshore wind farm will be able to cover 3% of Poland's national electricity demand, which stands for the energy needs of over 1,5 million households in Poland.
Northland Power is the sole owner of two Battery Energy Storage System (BESS) projects currently under construction, the Kamionka 100MW four-hour BESS near Turek, and the Mieczysławów 200MW four-hour system. The COD for Kamionka is expected in Q4 2027, and the COD Mieczysławów is expected in Q1 2028. The projects will operate in the capacity, balancing, and energy markets for revenue.
The Role
The Asset Manager is responsible for leading and coordinating all Asset Management activities for the Kamionka & Mieczysławów BESS projects during the operational phase. This role acts as a central interface across internal and external stakeholders, ensuring that revenue streams, contractual obligations, and regulatory requirements are met while maintaining operational efficiency and reliability.
The role is required to work in the Warsaw office 4 days per week with one flexible day available to work from home.
What You'll Do
- Support the construction team through the construction and commissioning phases of the projects, while preparing the projects for the operations phase.
- Take overall ownership of Asset Management activities for the Kamionka & Mieczysławów operations, ensuring consistency, transparency, and alignment with business objectives.
- Act as the central coordination point across technical, commercial, and strategic functions, monitoring key operational metrics and supporting risk and opportunity management.
- Provide clear insights and recommendations to support informed decision-making by Senior Management.
- Lead and support a team responsible for Performance Management, Contract and Claims Management, and Risk Management, fostering effective collaboration and delivery.
- Maintain and continuously improve Asset Management processes, systems, training materials, and reporting requirements for the operational phase.
Key Tasks & Responsibilities
- Manage all Asset Management-related reporting to shareholder(s), lenders, authorities, and other key stakeholders, ensuring timely, accurate, and transparent communication on operational performance, risks, obligations, and key developments.
- Lead, develop, and support the Asset Management team, providing clear direction, guidance, and day-to-day support to ensure effective delivery across all Asset Management activities.
- Ensure alignment between internal stakeholders and O&M contractors on Asset Management priorities, operational requirements, and emerging issues, acting as a bridge between senior management and operational teams to translate strategic objectives into practical delivery.
- Work closely with internal stakeholders to ensure Asset Management requirements are embedded in operational processes, procedures, governance routines, and continuous improvement initiatives throughout the operational phase.
- Oversee contractor and stakeholder activities to ensure compliance with relevant contractual and regulatory frameworks, including PPA, Optimiser agent, BESS LTSA, BoP SMA, authority requirements, claims management, and warranty obligations.
- Monitor, analyse, and report on the technical and commercial performance of the BESS sites, identifying trends, deviations, risks, and improvement opportunities to support reliable and efficient operations.
- Support business planning, budgeting, and strategic project development by providing Asset Management insights, performance data, operational assumptions, and recommendations for short-, medium-, and long-term planning.
- Lead Risk and Opportunity Management processes, including the identification, assessment, mitigation, monitoring, and reporting of risks and opportunities, while providing relevant input to OPEX planning and budgeting.
- Prepare, compile, and align daily, weekly, monthly, and annual Asset Management reports for internal and external audiences, including lenders, authorities, board members, and other governance bodies, ensuring consistency, quality, and accuracy across all reporting deliverables.
- Be based in the Northland Power Warsaw office and perform site visits as required.
Who You Are
- Independent: You are an independent thinker and able to set your own goals to drive the success of your function
- Strong Communicator: You can clearly convey points to different audiences. You are culturally sensitive and understand how to adapt your style accordingly
- Flexible: You are agile in your approach and are able to respond to changing priorities
- Credible: You are seen as a credible leader and able to influence decisions using your knowledge and experience
Experience & Education
- Bachelors or masters degree in Engineering
- Significant experience in a similar role managing power generation assets
- HV substation experience
- Experience interfacing with PSE
- Project management experience
- Team Leadership experience
- Fluency in Polish and English.
What's In It for You
Our employees are the driving force behind our achievements. We are unwavering in our commitment to not only recognise your contributions but also to empower you to excel in every aspect of your life. Here's a glimpse of why Northland is the place where you'll truly thrive:
- Thoughtful benefits -A pension plan and health insurance are just a couple of the benefits you'll have access to.
- Wellbeing first - Staying true to our taking care of ourselves and each other value, you will have access to our global Wellness Program.
- Birthdays off - You will get your birthday off work so you can celebrate however you choose. This is a paid day off to do what is important to you!
We hire talented and passionate people from different backgrounds. If you're excited about a role but your past experience doesn't align perfectly with this job description, we still encourage you to apply. Learn more about our diversity, inclusion and belonging commitments.
This document is a guide. The duties, responsibilities, and requirements of the jobs as described herein are not inclusive and are subject to change.
Northland Power is an equal opportunity employer and we are committed to creating a fair, inclusive and accessible environment. As part of our commitment we work to ensure our application process is accessible to all candidates. If you require special assistance or accommodation during the hiring process, please notify a member of the HR Department.
We use AI‑enabled tools to help identify applications that meet job‑related criteria. All applications are reviewed and decisions are made by people.
薪资与福利
职位详情
关于 Northland Power
公司概况
业务范围
Northland Power 由 Jim Temerty 及合伙人于1987年创立,是加拿大最早的独立发电商之一。公司开发、持有并运营涵盖海上与陆上风电、太阳能、天然气发电和电网级电池储能的资产组合。公司在七个国家设有办事处,全资或部分持有3.6 GW总运营装机容量,另有2.4 GW在建。其 Energize 2030 战略目标是到2030年将总运营装机容量翻番至7 GW。
在海上,Northland 运营位于德国和荷兰的三座风电场,发电容量1.2 GW。其陆上风电资产包括19座电站,装机容量1 GW,自2009年首座风电场起陆续建于魁北克、安大略、纽约州和西班牙。在加拿大,公司持有并运营13座地面光伏电站,年发电量约200 GWh;在西班牙,其光伏和光热电站总装机超过100 MW。
Northland 自1990年起建设和运营天然气电厂,目前在加拿大运营四座。自2020年起,公司拥有 Empresa de Energía de Boyacá (EBSA),这是一家受监管的配电公司,为哥伦比亚 Boyacá 地区逾130万居民供电。
项目与业绩
Gemini 是距荷兰海岸85公里的600 MW风电场,Northland 持股60%。这是公司首个大型海上风电投资,于2017年提前并低于预算建成。2016年,Northland 投资332 MW的 Nordsee One 并收购252 MW的 Deutsche Bucht 海上风电场,两者均位于德国北海;2022年,公司获得苏格兰 Isle of Lewis 外海两处海上风电场址,潜在总容量2.3 GW。
在陆上,安大略省休伦湖附近的100 MW Grand Bend 风电场于2016年与两家当地原住民(First Nation)合作伙伴共同投运;纽约州 Broome County 的112 MW Bluestone 风电站自2023年10月起运行。
在储能领域,位于安大略省 Haldimand County 的250 MW / 1,000 MWh Oneida Energy Storage Project 于2025年提前并低于预算投入商业运营,是加拿大在运的最大电池储能设施。Northland 持股约70%,该项目依托与安大略省 Independent Electricity System Operator 签订的20年容量合同。
近期动态
2026年10月,Hai Long 全部73台风机已安装完毕并发电。这一1,022 MW项目位于台湾海峡彰化县外海45至70公里处,由 Northland(30.6%)与 Mitsui & Co.(40%)和 Gentari(29.4%)共同建设。2026年4月,Northland 与 TSMC 签署长期企业购电协议,Hai Long 2A 转入该协议后,TSMC 将承购项目100%的容量;2026年8月,该项目获得约550亿新台币的新债务融资。项目预计于2027年投入商业运营。
Baltic Power 是波兰首个海上风电项目,于2026年7月向波兰电网输送了首批海上风电;到2026年10月,这座1.1 GW风电场的全部76台风机均已安装。Northland 持股49%,ORLEN 持股51%。项目投运后预计每年发电约4 TWh,足以供应逾150万户波兰家庭。
2026年9月,80 MW / 160 MWh 的 Jurassic 电池储能系统提前并低于预算投入商业运营,是艾伯塔省最大的电池储能设施。在波兰,Northland 于2025年11月从 Greenvolt Power Group 收购两个电池储能项目,即 Mieczysławów(200 MW / 800 MWh)和 Kamionka(100 MW / 400 MWh),并于2026年9月为其完成约5亿波兰兹罗提的项目融资。Kamionka 预计于2028年初、Mieczysławów 预计于2028年年中投入商业运营。
2025年11月,Northland 与 Shell Energy Europe 签署为期五年的购电协议,出售332 MW Nordsee One 海上风电场约三分之一的发电量,Northland 持有该风电场85%的股份。供电将于2027年6月开始。
工作环境
除多伦多总部外,Northland 还在马德里、阿姆斯特丹、汉堡和台北设有办事处。公司招聘领域包括企业事务、运营、工程、财务、项目开发、健康安全安保与环境、人力资源、IT/OT、项目管理以及市场与大宗商品。公开的福利包括与当地制度接轨的退休储蓄计划、生日假和弹性假期、年度健康报销以及管理培训。