Internship Overview
You won't be running coffee orders or shuffling paperwork this summer. At Fervo, interns are handed something real: a project of your own, scoped with your manager on day one and yours to drive for the full 12 weeks. You'll work side-by-side with the teams building the next generation of geothermal energy, tackling problems that genuinely move the business forward. At the end of the summer, you'll present your work to our executive leadership team, department leads, and fellow interns, sharing real results with a real audience. This is a real seat at the table - and a real shot at what comes next.
Position Description
As our GIS Intern, you'll join the GIS team out of our Salt Lake City office and support the spatial data backbone behind Fervo's geothermal resource development. Geothermal projects live and die on geospatial context - where the heat is, where the land rights are, where the wells and infrastructure can go - and you'll help our geoscientists, land team, and engineers see and use that context clearly.
You'll build and maintain the maps, layers, and spatial datasets that inform site selection, permitting, and field development decisions, and you'll have the chance to bring automation and scripting into workflows that are still done by hand. Your work will directly shape how the team visualizes and reasons about the subsurface resources that power Fervo's next projects.
Responsibilities
- Build, maintain, and QC GIS layers covering lease and land boundaries, well pads, transmission corridors, and subsurface resource targets
- Support resource characterization by integrating geologic, geophysical, and land datasets into spatial models used across the Geoscience and Land teams
- Produce maps, figures, and spatial visualizations for internal technical reviews, permitting submissions, and field development planning
- Help automate recurring spatial data workflows (e.g., using Python/ArcPy) to reduce manual data handling and improve data quality
- Partner with geoscience, land, and engineering colleagues to support site selection, due diligence, and project siting decisions
Qualifications
Required
- Rising Junior, Senior, Master's candidate wrapping up within the next year, or PhD candidate - we're building a pipeline toward full-time offers
- Strong written and verbal communication skills, including comfort presenting to stakeholders and leadership
- Eagerness to learn, take initiative, and adapt quickly to new challenges
- Pursuing a degree in GIS, Geography, Geology, Environmental Science, or a related field, with hands-on experience in ArcGIS Pro and/or QGIS and core spatial analysis concepts [Hiring manager: confirm/adjust role-specific requirements]
Preferred
- Knowledge in PLSS System
- Knowledge in Esri Products, Enterprise is a plus
Location
Fervo Energy has offices in Houston, TX, Golden, CO, Reno, NV, Oakland, CA, and Salt Lake City, UT. This position will be eligible for some hybrid work flexibility, but regular in-office presence in Salt Lake City, Utah will be required.
Benefits & Perks
- Fervo offers a comprehensive benefits package designed to support your health, financial well-being, and life outside of work. Benefits for eligible employees include:
- Medical, dental, and vision plan options
- Employer-paid basic life insurance and short-term and long-term disability coverage
- A 401(k) plan with up to 6% match
- Flexible paid time off and paid parental leave
- Family-building, fertility, hormonal health, pregnancy, postpartum, and parenting support through Carrot
- A dependent care FSA for eligible child and elder care expenses
- An annual Lifestyle Spending Account for eligible wellness expenses, including fitness, financial planning, pet insurance, and pet care
- Employee ownership opportunities through Fervo's Employee Stock Purchase Program, as well as LTI and bonus opportunities for eligible roles
Benefits and programs are subject to eligibility requirements and may change.
Our Workplace
Fervo Energy highly values having employees work in the office to foster collaboration and strengthen our company culture. This role follows a hybrid schedule, with team members expected to work in the office three days per week. Fervo considers this in-office schedule an essential function of the role. Your recruiter can share more information about the schedule.
Equal Opportunity Employer
Fervo Energy is an Equal Opportunity Employer and does not discriminate on the basis of race, color, creed, gender, religion, marital status, registered domestic partner status, age, national origin, ancestry, physical or mental disability, medical condition, sex, genetic information, sexual orientation, military or veteran status, or any other consideration made unlawful by federal, state, or local law. Fervo also prohibits discrimination based on the perception that an individual has any of these characteristics or is associated with a person who has or is perceived as having any of these characteristics.
薪资与福利
职位详情
关于 Fervo Energy
公司概况
业务范围
Fervo Energy 开发、拥有并运营新一代地热发电厂,致力于把地热能打造成清洁、可靠且具成本竞争力的电力来源,以满足人工智能超大规模云服务商、电力公司以及日益电气化的经济不断增长的用电需求。联合创始人Tim Latimer担任首席执行官。
其技术借鉴了油气行业十多年来在钻井和开采方面的创新。精准定向钻井使其能够从同一地点钻出多口水平井,井下安装的光纤电缆可实时提供流量、温度和性能数据。公司以可复制的GeoBlock(标准化地热发电单元)建设电厂。
项目与业绩
其试点项目Project Red位于内华达州Humboldt County的Winnemucca附近,自2023年起向内华达州电网输送3兆瓦总功率。旗舰项目Cape Station位于犹他州Beaver County,于2026年9月30日比合同约定提前一天实现商业运营,成为全球首个实现合同商业运营的新建增强型地热系统(EGS)项目。Fervo仅用23个月就建成并投运了首个GeoBlock的电厂。
Cape Station一期由三个33兆瓦的GeoBlock组成,总装机约100兆瓦:其余两个预计于2027年1月1日前投入商业运营,另有400兆瓦正在建设,计划于2028年投运。其约900兆瓦容量已全部签约,买方包括Southern California Edison、Shell Energy和社区选择聚合商;Shell Energy于2025年4月签署了为期15年、31兆瓦的购电协议(PPA)。在内华达州,位于Churchill County的Corsac项目依据首个清洁转型电价(Clean Transition Tariff)与Google和NV Energy签有115兆瓦的购电协议,规划装机150兆瓦,目标于2030年投入商业运营。
近期动态
2026年9月,Fervo与Google签署了396兆瓦的购电协议,用于预计2028年投运的Cape Station地热集群(GeoCluster),公司称这是迄今全球最大的增强型地热购电协议。Fervo还将向Google提供在2030年6月前追加约600兆瓦的选择权,届时总量接近1吉瓦。Fervo目前已签署超过1吉瓦具约束力的购电协议。
2026年5月,Fervo为其扩大规模的首次公开募股定价:7,000万股A类股票,每股27美元。此前,公司于2025年12月完成由B Capital领投的4.62亿美元E轮融资,并于2026年3月获得用于Cape Station一期的4.21亿美元无追索权债务融资。
2026年4月,Turboden签署三年期框架协议,为最多35个GeoBlock供应有机朗肯循环(ORC)机组,总计1,750兆瓦。同月,Vallourec在一份五年期协议中成为Fervo美国制造管材产品的独家供应商,该协议可为Vallourec带来最高8亿美元的潜在收入。
2026年2月,Fervo宣布Project Blanford的一口评价井(位于犹他州Millard County)用时不到11天钻成,在约11,200英尺深处确认了超过555°F的地层温度,是公司史上温度最高的井。2026年9月,美国能源部向Fervo授予两笔合计约2,000万美元的资助,用于爱达荷州和内华达州的增强型地热项目。
工作环境
Fervo总部位于休斯敦,并在Golden(科罗拉多州)、奥克兰(加利福尼亚州)、里诺(内华达州)和盐湖城(犹他州)设有不断扩大的办公室。2026年11月,其招聘岗位包括油藏工程师、电力方向的电气工程师以及软件工程总监等。
员工享有弹性休假制度及12天带薪假日;对员工401(k)退休计划缴款的前6%,Fervo按100%配缴,且立即归属。Bedrock Program让分析师在不同团队完成四轮、每轮6个月的轮岗,之后安排其全职加入某一团队。