Project Design Engineer
Canadian Solar
Virksomhedsoversigt
Canadian Solar Inc.
Kitchener, Ontario, Canada
2001
Ca. 20.000 ansatte globalt (kilde: prnewswire.com). Oplysninger om indtægter for 2023 er ikke specificeret.
Hvad de laver
Canadian Solar fokuserer udelukkende på solcelle-teknologi, batterilagring og relaterede systemer, uden involvering i vind, brint eller netinfrastruktur udover solintegration (kilde: wikipedia.org). Virksomheden fremstiller højeffektive PV-moduler ved hjælp af avancerede 210mm og 182mm N-type TOPCon solceller, der opnår bifacialitet på op til 85%. Deres flagskibsprodukter inkluderer TOPBiHiKu7-serien, som har sendt næsten 170 GW globalt pr. slutningen af 2025 (kilde: csisolar.com). Derudover tilbyder Canadian Solar gennem sit datterselskab e-STORAGE løsninger til batterilagring i stor skala og til boliger, og har sendt over 16 GWh pr. 30. september 2025, med en betydelig kontraheret backlog på $3,1 milliarder pr. 31. oktober 2025 (kilde: prnewswire.com). Deres målmarkeder spænder over bolig-, kommercielle og industrielle (C&I) samt kunder i stor skala i over 160 lande, med stærk fokus på USA, Canada, Europa, Kina, Storbritannien, Sydafrika og Brasilien (kilde: canadiansolar.com).
Projekter & Resultater
Siden de begyndte med projektudvikling i 2010, har Canadian Solar udviklet, bygget og tilsluttet ca. 12 GWp solenergiprojekter og 6 GWh batterilagringsprojekter verden over, med en pipeline på 25 GWp sol og 81 GWh lagring i forskellige faser (kilde: prnewswire.com). Bemærkelsesværdige afsluttede projekter inkluderer det 32 MWp (23 MWac) Suffield solanlæg i det sydøstlige Alberta, Canada, som forsyner 7.400 husstande årligt (kilde: wikipedia.org). I Sydafrika leverede Canadian Solar 256 MW moduler til to projekter i stor skala af SOLA Group, der genererer 580 GWh årligt til at forsyne 40.000 husstande og betydeligt reducerer CO2-udledningen (kilde: wikipedia.org). I øjeblikket driver virksomheden 1,6 GWp solprojekter med 6,5 GWp under opførelse eller backlog og 20,9 GWp i pipeline, plus 1 GWh lagring i drift, 8,5 GWh backlog og 54,3 GWh pipeline (kilde: prnewswire.com).
Seneste Udviklinger
I de sidste to år har Canadian Solar gjort betydelige fremskridt, herunder åbningen af sit nye globale hovedkontor i Kitchener, Ontario, den 15. januar 2025, som konsoliderer forskellige forretningsenheder og styrker sine nordamerikanske rødder (kilde: prnewswire.com). Den 1. december 2025 annoncerede virksomheden, at den ville genoptage direkte tilsyn med amerikansk produktion gennem CS PowerTech joint ventures, med det mål at skabe tusindvis af amerikanske jobs og genoprette forsyningskæder (kilde: prnewswire.com). I juni 2023 planlagde Canadian Solar en investering på $250 millioner i en 5 GW fabrik i Mesquite, Texas, som forventes at beskæftige op til 1.500 personer og producere 20.000 paneler dagligt (kilde: wikipedia.org). Derudover har virksomheden indgået partnerskab med SOLARCYCLE for modulgenbrug i hele USA, hvilket forbedrer dens bæredygtighedsindsats (kilde: solarcycle.us).
At Arbejde Der
Canadian Solar tilbyder et bredt udvalg af roller på tværs af forskellige afdelinger, herunder produktion, projektudvikling, energilagring, salg, ingeniørarbejde, forsyningskæde og virksomhedsfunktioner på sit hovedkontor i Kitchener (kilde: prnewswire.com). Virksomheden ansætter aktivt i Kitchener, Ontario, og Mesquite, Texas, hvor en ny fabrik forventes at skabe op til 1.500 produktionsjobs (kilde: prnewswire.com). Kulturen hos Canadian Solar lægger vægt på innovation og samarbejde, som fremhævet af CEO Dr. Shawn Qu under åbningen af Kitchener HQ, som er designet til at tilpasse virksomhedens vision med dens canadiske rødder midt i global vækst (kilde: prnewswire.com). Selvom specifikke fordele ikke er detaljeret i offentlige oplysninger, er virksomheden forpligtet til bæredygtighed og offentliggør årlige rapporter i overensstemmelse med forskellige standarder, med mål om 100% vedvarende energi til driften inden 2030 (kilde: canadiansolar.com).
Sidst opdateret den feb. 23, 2026 | Rapporter et problem
Position Summary
The Project Design Engineer will support early-stage development and engineering for Commercial & Industrial (C&I) energy storage and solar PV projects. Responsibilities include preliminary system design, site assessment, grid and interconnection review, and technical documentation to support proposals and permitting.
Duties & Responsibilities
- Perform technical feasibility assessments, load and utility data analysis, and conceptual system design for C&I battery energy storage (BESS) and solar PV systems.
- Develop preliminary system layouts, one-line diagrams, electrical calculations, and capacity modeling.
- Conduct solar irradiance studies, shading analysis, and energy performance modeling.
- Analyze interval utility data (15-min / hourly) to evaluate load profiles, peak shaving potential, and system sizing.
- Review interconnection requirements, tariff structures, and utility programs (CPUC, IOUs, NEM, SGIP).
- Prepare preliminary bill of materials (BOM), equipment selection support, and cost assumptions for proposals.
- Perform occasional site assessments and prepare technical site reports.
- Coordinate with project development, sales, and construction teams to ensure technical alignment.
- Maintain organized project documentation and support permitting & utility submissions as needed.
- Assist in identifying BESS opportunities and portfolio design optimization.
Qualifications & Requirements
- Bachelor's degree in Electrical Engineering, Renewable Energy Engineering, Power Systems, or related field (or equivalent industry experience).
- Minimum 1-3 years of experience in distributed energy, solar, or energy storage design is preferred.
- Experience with California C&I energy systems is strongly preferred.
- Understanding of electrical design principles (480V/277V, 208V/120V systems, transformers, DER interconnection).
- Knowledge of battery energy storage system design, safety, and project workflows.
- Familiarity with California incentive & interconnection programs (SGIP, Rule 21, NEM/NBT/A).
- Experience with microgrid or hybrid BESS-PV systems is preferred.
- Knowledge of NFPA 855, UL 9540, UL 1741, NEC Article 690 & 706 is preferred.
- Experience with ESS enclosure vendors and inverter/EPC requirements is preferred.
- PV & Energy Modeling: PVsyst, Helioscope (or Aurora Solar), SAM preferred.
- CAD Tools: AutoCAD (2D), SketchUp or similar for layout.
- Electrical Calculations: ETAP or equivalent preferred; NEC knowledge.
- Data Analysis: Excel (advanced), VBA or Python a plus.
- Utility Data & Tariff Tools: Utility API, Energy Toolbase or equivalent preferred.
- Strong analytical and problem-solving abilities.
- Excellent documentation and communication skills.
- Ability to multitask and work cross-functionally in a fast-moving environment.
- Willing to travel occasionally for site visits.
Compensation & Benefits
Canadian Solar Inc. is an Equal Opportunity Employer (EOE). Qualified applicants are considered for employment without regard to age, race, color, religion, sex, national origin, sexual orientation, disability, or veteran status.
The pay range for this position is $105,000.00 - $125,000.00 USD. This range represents annual base salary only, without regard to location, and does not include bonus or other incentives or benefits that may apply. The pay range for this role is subject to change.
Ansøg nu
Job udløbet?Lad venligst Canadian Solar vide, at du fandt dette job på Rejobs. Dette vil hjælpe os med at vokse og få flere mennesker til at arbejde med vedvarende energi!
Ansøg nu
Job udløbet?Lad venligst Canadian Solar vide, at du fandt dette job på Rejobs. Dette vil hjælpe os med at vokse og få flere mennesker til at arbejde med vedvarende energi!
Hvordan du er forbundet via LinkedIn
Se forbindelserSe dine kontakter hos Canadian Solar på LinkedIn for at udnytte dit netværk, når du søger denne stilling.
Få jobvarsler
Få påmindelser om jobs inden for Batteriteknologi i Walnut Creek, Californien, USA
Tilmeld talentpoolen
Bliv fundet af førende arbejdsgivere inden for ren energi
Om rollen
3. februar 2026
Fuldtid
Virksomhed
21. marts 2026
Hybrid
USD 105k–125k yearly
- Walnut Creek, Californien, USA
1-3 years
UTC-08:00