Inch Cape Offshore Limited

Offshore Installationsleder (OIM)

Bliv Offshore Installation Manager hos Inch Cape Offshore Limited i Edinburgh. Led transport og installation af eksportkabler til en stor havvindmøllepark med fokus på sikkerhed og projektlevering. Fleksible arbejdstider og mulighed for at gøre en forskel i vedvarende energi.

Inch Cape Offshore Limited

Virksomhedsoversigt

Inch Cape Offshore Limited

Edinburgh, Storbritannien

2010

Ansætter færre end 10 personer og rapporterer en omsætning under £1 million, med nettoaktiver på £18,02 millioner pr. den seneste indberetning (kilde: endole.co.uk).

Hvad de laver

Inch Cape Offshore Limited (ICOL) er dedikeret til udviklingen af offshore vindkraftproduktion, med fokus udelukkende på Inch Cape Offshore Wind Farm projektet. Dette ambitiøse initiativ sigter mod at udnytte vedvarende energi gennem en vindmøllepark med en kapacitet på 1,1 GW, der omfatter 72 vindmøllegeneratorer, hver i stand til at nå højder på op til 274 meter. Projektet er strategisk placeret i moderate vanddybder, der anvender faste bundturbiner, og støttes af en Ofgem elektricitetsgenerationslicens (kilde: businessenergyuk.com). ICOL's tjenester omfatter projektudvikling, konstruktion samt planlagte drifts- og vedligeholdelsesopgaver, med fokus på det britiske elmarked for at levere grøn energi til hjem og virksomheder som en del af Skotlands ambitiøse offshore vindmål på 11 GW inden 2030 (kilde: inchcapewind.com).

Projekter & Resultater

ICOL's primære fokus forbliver Inch Cape Offshore Wind Farm, som endnu ikke har afsluttet nogen projekter, men er i byggefasen. Projektet blev tildelt eksklusivitet af The Crown Estate i juni 2011, efter en placeringsevalueringsproces, der begyndte i 2008. Nøglemilepæle inkluderer sikring af offshore tilladelser i 2014 for en initial kapacitet på 784 MW, som er sat til at blive udvidet til 1.080-1.100 MW (kilde: wikipedia.org). Løbende byggeaktiviteter inkluderer arbejdet med den onshore transformatorstation, der blev påbegyndt i januar 2024, installation af undervands eksportkabel planlagt til 2025, og monopile installation af Jan De Nul, med fuld drift målrettet mod 2027 (kilde: inchcapewind.com).

Seneste udviklinger

I de seneste to år har ICOL opnået betydelige milepæle, herunder påbegyndelsen af konstruktionen af den onshore transformatorstation i januar 2024 og flere registreringer af gebyrer i januar 2025. Virksomheden har også set ændringer i sin ledelse, med nye direktørudnævnelser og indsendelse af en bekræftelseserklæring i februar 2025 (kilde: wikipedia.org). Derudover flyttede virksomheden sit kontor i april 2025, hvilket afspejler dens løbende operationelle justeringer, mens den forbereder sig på de kommende faser af Inch Cape projektet (kilde: endole.co.uk).

At arbejde der

Som en mikrovirksomhed med færre end 10 ansatte tilbyder ICOL sandsynligvis specialiserede roller inden for projektudvikling, ingeniørarbejde, finans og juridisk støtte. Virksomheden opererer fra sit hovedkontor i Edinburgh, hvor de seneste ansættelsesaktiviteter har været koncentreret, herunder udnævnelsen af nye direktører (kilde: endole.co.uk). Selvom specifikke jobopslag ikke er offentligt detaljeret, kan rollerne være i overensstemmelse med de operationelle behov hos deres moderselskaber, Red Rock Renewables og ESB, som har bredere teams og ekspertise inden for vedvarende energiprojekter (kilde: inchcapewind.com).


Sidst opdateret den feb. 23, 2026 | Rapporter et problem

Job Description

Inch Cape is a 1080MW offshore wind farm situated 15km from the Angus coast in the North Sea. The power it generates will be transmitted 85 kilometres to a new substation at Cockenzie, in East Lothian from where it will enter the national transmission system. Inch Cape is a more than £3 billion infrastructure project that will make a significant contribution to the UK's carbon emissions reduction targets. Once complete its 72 turbines will generate enough electricity to power almost half the homes in Scotland.

We are looking for an experienced Offshore Installation Manager (OIM) to lead the Transport and Installation (T&I) of export cables on Inch Cape offshore wind farm. The OIM will take full ownership of the offshore execution of cable activities, overseeing the logistics, marine operations, and installation works to ensure a safe and successful project delivery in alignment with contractual and regulatory requirements.

Travels required: Mainly WFH with some travels to the Edinburgh office for meetings as and when required (around 2 -3 days a month)

Main office: Ground Floor New Clarendon 114-116 George Street EH2 4LH, Edinburgh

Working hours: Flexible times - Monday to Friday - 7.5h a day (normally between 8am and 6pm)

Responsibilities

  • Lead the execution delivery for Transport & Installation (T&I) campaign of export cables, including load-out, transport, cable laying, burial, pull-ins, and termination/testing.
  • Lead and coordinate offshore installation teams and contractor personnel on cable lay vessels, trenching vessels, and support craft.
  • Oversee the safe marine transport of cables and equipment from storage/load-out ports to the offshore site, ensuring compliance with handling procedures and marine warranty requirements.
  • Ensure the T&I contractor executes the works in line with the Installation Procedure, method statements, risk assessments, and project schedule.
  • Proactively secure interfaces to related work packages to de-risk package scope.
  • Monitor marine coordination, DP operations, and vessel performance throughout all offshore operations.
  • Manage interface and sequencing with other offshore scopes (e.g., foundations, offshore substations, array cables).
  • Uphold and enforce HSE standards, including Permit to Work (PTW), toolbox talks, emergency drills, and incident reporting.
  • Drive progress tracking and reporting (daily progress reports, KPI monitoring, HSE reporting) to the onshore execution team.
  • Support offshore readiness reviews, walk-to-work (W2W) planning, weather windows assessments, and marine operations planning.
  • Be accountable for offshore execution risk management and mitigation measures in line with the project risk register.

Skills

  • Strong leadership, problem-solving, and decision-making skills.
  • Excellent communication and stakeholder management abilities.
  • Ability to work in offshore environments for extended periods.
  • Certification in GWO (Global Wind Organization) training, BOSIET, or equivalent offshore safety training is preferred / desirable.
  • Proficiency in project management tools and software.

Experience

  • Significant experience in offshore wind farm installation, particularly in export cable transport and installation (T&I).
  • Proven track record as an Offshore Installation Manager, Cable Package Rep, or similar offshore leadership role.
  • Certified for offshore work: BOSIET / GWO, OGUK / ENG1 medical, and relevant STCW or marine safety certifications (desirable).
  • Strong technical knowledge of subsea cable handling, vessel operations (DP2/DP3), and marine logistics.
  • Familiar with marine warranty surveyor (MWS) requirements, load-out operations, and offshore project documentation.
  • Solid understanding of HSE regulations, CDM, LOLER, PUWER, and environmental controls.
  • Effective communicator and leader with excellent organizational and coordination skills.

Qualifications

  • Degree in Mechanical, Geotechnical, Civil or Structural Engineering.

If you wish to make a big impact in renewables and being involved in this innovative project do not hesitate to apply.

More roles will be advertised soon, so feel free to reach out and share!

Ansøg nu

Job udløbet?

Lad venligst Inch Cape Offshore Limited vide, at du fandt dette job på Rejobs. Dette vil hjælpe os med at vokse og få flere mennesker til at arbejde med vedvarende energi!

Om rollen

13. maj 2026

Fuldtid

Virksomhed

21. maj 2026

Hybrid

Vindenergi

Inch Cape Offshore Limited

inchcapewind.com

  •  Edinburgh, Skotland, Storbritannien

Significant experience in offshore wind farm installation

UTC+01:00