Scottish Power

Lead Design Engineer - Hjælpesystemer til transformerstationer

Bliv Lead Design Engineer hos Scottish Power i Cambuslang og led design af hjælpeforsyningssystemer til transformere. Arbejd på store projekter med fokus på sikkerhed og effektivitet. Få 36 dages ferie og pensionsmatch.
Scottish Power
Scottish Power
Cambuslang, Storbritannien Hybrid Fuldtid 63.200–79.000 £ om året UTC+00:00

Scottish Power

Virksomhedsoversigt

Navn

ScottishPower Limited, et 100% ejet datterselskab af Iberdrola

Hovedkontor

Glasgow, Skotland, Storbritannien

Grundlagt

1990

Størrelse

Ca. 5.000 ansatte (kilde: linkedin.com). Omsætningstal for 2023 er ikke offentliggjort, men Iberdrola har forpligtet sig til at investere 24 milliarder pund i Storbritannien inden 2028, herunder gennem ScottishPower (kilde: energyadvicehub.org).

Hvad de gør

ScottishPower er et vertikalt integreret energiselskab, der fungerer som distributionsnetværksoperatør for Central- og Sydskotland, Merseyside, Nordwales og dele af Cheshire og Shropshire. Virksomheden leverer elektricitet og gas til hjem og virksomheder i hele Storbritannien og producerer strøm til nettet (kilde: wikipedia.org). Dens kernefokus på teknologi inkluderer vindenergi, solenergi, opgraderinger af nettet, batterilagring og lavkulstofbrint, idet den har overgået til at producere 100% grøn elektricitet ved at frasælge sine kul- og gasaktiver (kilde: wikipedia.org). ScottishPowers produktudbud omfatter vedvarende generation fra 38 landbaserede vindmølleparker og over 40 operationelle steder, der producerer mere end 3 GW i samlet kapacitet, samt tjenester som smarte net, EV-opladning, varmepumper og solenergiløsninger til virksomheder (kilde: scottishpower.co.uk). Virksomheden henvender sig til britiske husholdningskunder, kommercielle virksomheder og engros energihandler, og udnytter sin position som en del af Iberdrola, en verdensleder inden for vindenergi (kilde: energybrokers.co.uk).

Projekter & Resultater

ScottishPower har gennemført flere bemærkelsesværdige projekter, herunder Whitelee landbaserede vindmøllepark, som er Europas største med 539 MW, der har 215 turbiner og et 50 MW batteri (kilde: wikipedia.org). Virksomheden har også genopbygget Skotlands første kommercielle vindmøllepark, Hagshaw Hill, som blev taget i brug igen i november 2025 for at øge produktionen og samfundsmæssige fordele (kilde: scottishpowerrenewables.com). Løbende store projekter inkluderer East Anglia ONE og East Anglia THREE havvindmølleparker samt Wikinger havprojektet i den tyske Østersø (kilde: cisco.com). ScottishPower Renewables forvalter Iberdrolas britiske portefølje, som overstiger 2.000 MW fra 40 vindmølleparker, med planer om yderligere sol- og brintudvidelse (kilde: windenergyireland.com).

Seneste udviklinger

I de seneste år har ScottishPower sikret 1,35 milliarder pund til syv opgraderinger af nettet, herunder undervandskabler og transformerstationer, for at forbedre transporten af skotsk vindkraft mod syd (kilde: energyadvicehub.org). Iberdrola annoncerede en betydelig investering på 24 milliarder pund i Storbritannien inden 2028, med fokus på vedvarende energi og netværksresiliens (kilde: energyadvicehub.org). Derudover er ScottishPower Renewables klar til at investere næsten 3 milliarder pund i hav- og landbaserede vind- og solprojekter fra 2023 til 2025 (kilde: cisco.com). Inden for brintsektoren lancerede Iberdrola en enhed i september 2023, der sigter mod 600 MW inden 2025 og 5 GW inden 2030, med ScottishPowers Green Hydrogen for Scotland projekt, der har en 10 MW elektrolyser (kilde: energybrokers.co.uk).

At arbejde der

ScottishPower tilbyder en række roller inden for udvikling og drift af vedvarende energi, energinetværk, generation og støttefunktioner som energistyring og IT/sikkerhed (kilde: scottishpowerrenewables.com). Virksomheden ansætter primært på sit hovedkontor i Glasgow, med operationer knyttet til vindmølleparker i hele Storbritannien og offshore steder i East Anglia og den sydlige Nordsø (kilde: windenergyireland.com). Virksomhedens kultur lægger vægt på innovation inden for vedvarende energi og samfundsengagement, som det fremgår af initiativer som MachairWind feedbackfasen og partnerskaber med lokale organisationer (kilde: scottishpower.co.uk). Selvom specifikke fordele ikke er detaljeret, investerer virksomheden kraftigt i grønne initiativer og støtter medarbejderdrevne netto-nul overgange for erhvervskunder (kilde: scottishpower.com).


Sidst opdateret den feb. 23, 2026 | Rapporter et problem

Job Description

At SP Energy Networks, we're helping shape the future of energy. As we deliver one of the UK's largest electricity network transformation programmes, investing over £12bn in our transmission infrastructure over the next five years, we're creating the network that will power Scotland's journey to Net Zero and support generations to come.

To help drive this transformation, we're looking for a skilled Lead Design Engineer to lead the development and delivery of Substation Auxiliary Power Systems across our transmission network. Joining our Main Plant Design team, you'll play a pivotal role in delivering major infrastructure projects worth in excess of £75m, providing technical expertise throughout the project lifecycle.

You'll be responsible for developing detailed engineering designs, calculations, specifications and technical standards covering auxiliary AC power systems, standby generation, building electrical services and associated infrastructure, ensuring the safe, reliable and efficient operation of critical network assets that keep electricity flowing to homes, businesses and communities across Scotland.

What you'll be doing

  • Define technical requirements - Shape System Construction Authorisation documents, project specifications, and procurement documentation for substation auxiliary systems
  • Design and specify - Prepare detailed engineering specifications and designs for LVAC distribution systems, standby diesel generators, AC and DC distribution boards, marshalling kiosks, building electrical services, and lighting systems
  • Calculate and validate - Prepare, review, and approve design calculations including load assessments, cable sizing, voltage drop studies, short-circuit calculations, LV protection coordination studies, and lighting studies
  • Assess and approve - Undertake technical assessment of submissions and provide oversight and approval of designs produced both internally and by external design partners
  • Resolve technical issues - Support construction, testing, and commissioning activities while taking the initiative to resolve technical issues that arise on site
  • Ensure compliance - Work across multi-disciplinary engineering teams to ensure all designs, equipment, and components meet current legislation, policies, and operational requirements
  • Develop capability - Contribute to training needs assessment and help develop technical, operational, and safety packages for new equipment
  • Drive innovation - Stay ahead of technological advances and industry best practice, evaluating innovative ideas and alternative methods to deliver cost savings, improved efficiencies, and enhanced safety outcomes

What you'll bring

Essential qualifications and experience:

  • Degree or HND in Electrical Engineering or related discipline
  • 10+ years of electrical engineering experience, with at least 5 years in electricity transmission, distribution, or similar utility infrastructure
  • UK experience, ideally gained with a TO or EPC contractor working on UK projects
  • Expert knowledge of 33kV to 400kV substation projects from concept through to commissioning

Technical expertise you'll have:

  • Deep knowledge in auxiliary AC distribution systems, standby generation systems, low voltage power distribution, building electrical services, and lighting design
  • Proficiency in power system studies, calculations, and power quality engineering
  • Strong working knowledge of Trimble Electrical Designer, ETAP, and DIALux software
  • Solid working knowledge of BS 7671:2018 (18th Edition), earthing systems, and low voltage power systems evaluation
  • Experience with auxiliary power systems equipment, CDM and Health & Safety best practice in design environments
  • Knowledge of battery technologies including Lead Acid and Lithium-ion applications
  • Familiarity with operational resilience requirements for critical infrastructure power supplies
  • Track record of implementing new technologies and engineering solutions to reduce project lifetime costs

Skills that will make you successful:

  • Excellent communication skills and the ability to form effective working relationships across departments and businesses
  • Capability to investigate and gain familiarity with technical characteristics of substation plant and associated equipment
  • Strong planning and organisational skills to coordinate work across multiple complex, high-value transmission projects
  • Ability to engage in planning tasks from strategic capital investment level down to day-to-day coordination

Required:

  • UK driving licence

Desirable:

  • Chartered Engineer (CEng) status or working towards it
  • Membership of IET or equivalent professional institution
  • Working knowledge of ENA TS 50-18, 50-19, and other relevant standards

What's in it for you

As well as an attractive salary which is reviewed annually, you can also enjoy a number of other benefits. With our pension scheme, we'll double match your contribution up to a company contribution of 10%.

At ScottishPower, we believe it's the little things we do in life that make a big difference. From helping you look after your family's wellbeing, save for your future and take personal steps for climate action -- our benefits are designed to help you do just that - so that you have everything you need to take care of your world -- today and tomorrow.

That's why our benefits include:

  • 36 days annual leave
  • Holiday Purchase - perfect your work/life balance with extra annual leave
  • Equity Plans
  • Payroll Giving and Charity Matched Funding
  • Technology Vouchers - save more and spread the cost of your technology purchases
  • Electric Vehicle Schemes - to help you transition to green/clean driving
  • Cycle to Work scheme and Public Transport Season Ticket Loans
  • Healthcare benefit options including: Dental Insurance, Private Medical Insurance, Health Cash Plan and annual Health Assessments
  • Life Assurance (4x salary)
  • Access to Savesmart financial wellbeing assistance
  • Plus shopping, leisure, restaurant and gym discounts, and unique employee deals on travel insurance and more

Why SP Energy Networks

SP Energy Networks is part of the Iberdrola Group, one of the world's largest integrated utility companies and a world authority in wind energy. We keep electricity flowing to homes and businesses through Central and Southern Scotland, North Wales and in the North West of England. We operate over 4000km of cables and lines that make-up the transmission network - linking infrastructure like wind farms into the electricity system. It's a role that puts us right at the heart of Scotland's goal to be Net Zero by 2044. And we're taking it very seriously. We're investing £12 billion into our transmission network, directly enabling the rapid growth needed in renewable energy. With diverse opportunities across our businesses and a focus on investing in our own internal talent, ScottishPower can offer people real career opportunities that meet personal and professional goals, in a global organisation.

Inclusion, diversity, and a social purpose are at the heart of everything we do. These values, along with our clear standards, bring us into a stronger, more sustainable business with direct links to the communities we serve. It takes all types of people to build a large-scale business like ours, so whatever your background, you'll fit right in.

We are dedicated to providing reasonable adjustments or accommodations in our recruiting processes for candidates with disabilities, long term conditions, mental health conditions, or who are neurodivergent or require pregnancy-related accommodations. If you need assistance, please reach out to [email protected].

Mobility

Please note that any applicant who is not a citizen of the country of the vacancy will be subject to compliance with the applicable immigration requirements to legally work in that country. If/when required, the Company will support the employee with the necessary Immigration requirements.

Ansøg nu

Job udløbet?

Sig venligst til Scottish Power, at du fandt dette job på Rejobs. Det hjælper os med at vokse og få flere i arbejde inden for vedvarende energi.

Om rollen

10. september 2026

10. september 2026

Fuldtid

Hybrid

Virksomhed

63.200–79.000 £ om året

Vindenergi, Energilagring, Intelligente elnet

Scottish Power

scottishpower.com

  •  Cambuslang, Storbritannien

10+ years of electrical engineering experience

UTC+00:00