Descrição da função
Job Title: Drawing Office Civils Design Lead
Location: Cambuslang
Salary + benefits: From £63,200 to £79,000 + Upto 15 % Bonus + Medical Cover
At SP Energy Networks, we are strengthening our Drawing Office capability to support the safe, consistent and efficient delivery of Transmission Network projects. As our Drawing Office Civils Design Lead, you will report to the Drawing Office Manager and take charge of the Civils Drawing Office team. You will manage the team's people, workload, development and delivery. You will also provide technical direction for the production, coordination, checking and quality of civil and structural 3D models and drawings. Your work will help deliver the network that supports Scotland's net zero goals.
What you'll be doing
You will manage the Civils Drawing Office team and provide expert guidance across all civil and structural 3D models and drawings. This includes relevant underground cable civil works within the team's scope. You will combine line management with workload planning, staff development and quality assurance. This ensures every piece of Drawing Office information is controlled and properly assured before issue.
Your day-to-day responsibilities will include:
- Directing the Civils Drawing Office team, setting clear priorities and maintaining high standards of delivery and quality.
- Planning and allocating work across the team, balancing project demand, available resource, programme requirements and delivery risk.
- Providing technical direction so that civil and structural 3D models and drawings are well defined, coordinated, checked and assured.
- Managing direct reports, including performance, attendance, wellbeing, conduct and development, with support from the Drawing Office Manager.
- Overseeing recruitment, coaching, mentoring and structured development to build the capability of each team member and of the team as a whole.
- Promoting the use of BIM, Revit, Autodesk Forma and other digital tools, and embedding agreed standards and workflows.
- Applying engineering standards, Drawing Office procedures, health and safety requirements, quality controls and design-change arrangements consistently. You will use errors, rework and audit findings to drive practical improvement.
- Developing and reviewing Drawing Office processes, model and drawing standards and working practices to improve how we produce and deliver information.
- Coordinating interfaces with Plant, Protection and Control, Cables, Estates, Land and Planning, project teams and external design houses.
- Keeping the Drawing Office Manager, project teams and stakeholders informed on workload, priorities, technical issues, programme risk and team performance.
What you'll bring
Qualifications and requirements
- An HNC/HND, degree or equivalent qualification in Civil Engineering, Structural Engineering or a closely related discipline. Demonstrable equivalent experience in civil or structural design is also welcome.
- Demonstrable experience producing civil or structural 3D models and drawings.
- Demonstrable experience in the technical checking of these models and drawings, with the ability to oversee and assure the quality of Drawing Office outputs.
- Demonstrable experience managing and coordinating a technical Drawing Office or design-production team. Previous formal line-management experience is desirable but not essential.
- A UK driving licence and the ability to travel to project and site locations as needed.
Skills and experience
- Experience producing, coordinating and checking civil and/or structural 3D models and drawings. This may include civil layouts and details, foundations, buildings and structural elements, site infrastructure, and underground cable civil works.
- Experience in electrical substation civil and structural work is desirable.
- Experience allocating work, providing technical guidance, helping team members develop and maintaining delivery and quality standards within a design team.
- A sound knowledge of controlled model and drawing production, checking and change-management processes.
- Good knowledge of constructability, health and safety requirements, and the application of Drawing Office procedures and engineering standards.
- The ability to manage multiple priorities, assess complex information, identify interfaces and risks, and give practical direction.
- Excellent communication skills, with the ability to guide technical discussions, give clear direction and build strong working relationships with internal teams, external design organisations and the supply chain.
- Experience with 2D and 3D design and information-management tools, including AutoCAD and Revit. Experience with BIM and digital design workflows, including Autodesk Forma, Vault and ProjectWise, is desirable.
What's in it for you
As well as an attractive salary which is reviewed annually, you can also enjoy a number of other benefits. With our pension scheme, we'll double match your contribution up to a company contribution of 10%.
At ScottishPower, we believe it's the little things we do in life that make a big difference. From helping you look after your family's wellbeing, save for your future and take personal steps for climate action -- our benefits are designed to help you do just that - so that you have everything you need to take care of your world -- today and tomorrow. That's why our benefits include:
- 36 days annual leave
- Holiday Purchase - perfect your work/life balance with extra annual leave
- Equity Plans
- Payroll Giving and Charity Matched Funding
- Technology Vouchers - save more and spread the cost of your technology purchases
- Electric Vehicle Schemes - to help you transition to green/clean driving
- Cycle to Work scheme and Public Transport Season Ticket Loans
- Healthcare benefit options including: Dental Insurance, Private Medical Insurance, Health Cash Plan and annual Health Assessments
- Life Assurance (4x salary)
- Access to Savesmart financial wellbeing assistance
- Plus shopping, leisure, restaurant and gym discounts, and unique employee deals on travel insurance and more
Inclusion, diversity, and a social purpose are at the heart of everything we do. Alongside our values, they make us a stronger, more sustainable business with direct links to the communities we serve. It takes all sorts of people to build a large-scale business like ours, so whatever your background, you'll fit right in.
We are committed to providing reasonable support or adjustments in our recruiting processes for candidates with disabilities, long term conditions, mental health conditions, or who are neurodivergent or require pregnancy-related support.
Mobility
Please note that any applicant who is not a citizen of the country of the vacancy will be subject to compliance with the applicable immigration requirements to legally work in that country. If/when required, the Company will support the employee with the necessary Immigration requirements.
Salário e benefícios
Sobre esta vaga
Sobre Scottish Power
Visão geral da empresa
Scottish Power Limited, subsidiária detida integralmente pela Iberdrola
cerca de 9.800 trabalhadores (2025); receitas de 6.516 milhões de libras em 2025
O que faz
A ScottishPower é a holding de um grupo que produz, transporta e distribui eletricidade e fornece eletricidade e gás, sobretudo no Reino Unido, através de três divisões: Energy Networks, Renewable production e Customer business. Foi a primeira empresa de energia integrada do Reino Unido a produzir 100 % da sua eletricidade a partir de fontes renováveis. A sua holding operacional, a Scottish Power UK plc, foi registada a 1 de abril de 1989 como South of Scotland Electricity plc e adotou o nome Scottish Power plc a 1 de agosto de 1989.
A Energy Networks gere quatro empresas reguladas de transporte e distribuição de eletricidade, cujos cabos, linhas elétricas e subestações servem cerca de 5,9 milhões de clientes ligados no Central Belt e no sul da Escócia, Cheshire, Merseyside, North Shropshire, norte do País de Gales, Cumbria e Lancashire. A SP Transmission é proprietária da rede de transporte, e as outras três empresas, entre elas a Electricity North West, são operadoras de redes de distribuição. Assim, a ScottishPower é o segundo maior operador de redes de distribuição do Reino Unido e leva eletricidade a cerca de 12 milhões de pessoas através de mais de 170.000 quilómetros de rede.
A Customer business fornecia gás e eletricidade a 4,2 milhões de clientes no final de 2025. Instala também bombas de calor, painéis solares, armazenamento em baterias e carregamento de veículos elétricos, com tarifários especiais para bombas de calor e carregamento de veículos elétricos e o primeiro plano nacional de manutenção anual de bombas de calor do Reino Unido.
Projetos e historial
A Renewable production desenvolve, constrói e explora centrais renováveis, sobretudo de energia eólica marítima e terrestre. Explora mais de 40 locais em terra, a par dos parques eólicos marítimos East Anglia One e West of Duddon Sands, num total de 3 GW de capacidade em operação. O East Anglia One pertence em 60/40 à ScottishPower e à Bilbao Offshore Holding Limited, e o West of Duddon Sands é explorado em conjunto com a Orsted Schroders Greencoat.
Em terra, o parque eólico renovado de Hagshaw Hill (80 MW) entrou em operação comercial a 31 de outubro de 2025: 14 novas turbinas substituíram as 26 originais, e o local tem agora cinco vezes a sua capacidade de produção original. A bateria de Harestanes (50 MW) entrou em operação comercial a 15 de setembro de 2025, e o parque eólico Kilgallioch Extension (51 MW) em março de 2026, com mais nove turbinas.
No mar, o East Anglia Three, de 1,4 GW, está a ser construído a 69 quilómetros da costa de Suffolk com 95 turbinas da Siemens Gamesa e é o primeiro projeto de eólica offshore do Reino Unido com pás de 115 metros. A primeira turbina foi instalada em abril de 2026, e o projeto de 4 mil milhões de libras é explorado em 50/50 com a Masdar desde que uma participação de 50 % foi vendida à Masdar em julho de 2025. A sua estação conversora marítima, a primeira da ScottishPower, é a maior alguma vez construída no grupo Iberdrola. O East Anglia Two está em fase de construção, que decorre de 2026 a 2028.
A carteira de projetos no Reino Unido até 2038 inclui cerca de 3 GW de eólica marítima na zona de East Anglia, a carteira ScotWind de 5 GW com o projeto flutuante MarramWind (3 GW) e o projeto de fundações fixas MachairWind (2 GW), e cerca de 5 GW de potenciais projetos de eólica terrestre, solar e baterias. Na rede, o Eastern Green Link 1, desenvolvido com a National Grid Electricity Transmission, vai ligar Torness, em East Lothian, a Hawthorn Pit, no condado de Durham, e a Siemens Energy é a concorrente preferida para as duas estações conversoras HVDC do Eastern Green Link 4.
Desenvolvimentos recentes
A Iberdrola apresentou em setembro de 2025 um plano estratégico de 58 mil milhões de euros com o Reino Unido como principal destino de investimento, e a ScottishPower está a investir 24 mil milhões de libras em cinco anos até 2028. Em dezembro de 2025, a determinação final da Ofgem aprovou os planos de investimento da ScottishPower de 12 mil milhões de libras na rede de transporte para o período 2026-2031. Em maio de 2025, o National Wealth Fund comprometeu 600 milhões de libras com a modernização da rede, no âmbito de um pacote de financiamento de 1,35 mil milhões de libras liderado pelo Bank of America que apoia sete projetos prioritários de transporte.
Em março de 2025, a Competition and Markets Authority autorizou a aquisição de uma participação de 88 % na Electricity North West, e cerca de 2.550 dos seus trabalhadores juntaram-se à ScottishPower ao longo de 2025. Em novembro de 2025, uma transação com a Shell deu à ScottishPower Renewables a propriedade total do projeto MarramWind.
Trabalhar na empresa
A ScottishPower recebeu mais de 1.000 novos trabalhadores desde que anunciou, em novembro de 2024, o crescimento do quadro de pessoal para 2025. Em setembro de 2025 entrou um número recorde de 338 diplomados e formandos, em funções que vão da engenharia à cibersegurança e à gestão de projetos, de Glasgow a Merseyside, ao norte do País de Gales e a Londres. Em 2025, a Energy Networks abriu um novo escritório em Edimburgo para as suas equipas de transporte de eletricidade, incluindo as que constroem ligações submarinas ao largo das costas leste e oeste da Escócia, e o grupo foi acreditado como 2025 Top Employer pelo Top Employers Institute.
Muitas funções permitem trabalho híbrido. As licenças familiares incluem 26 semanas com salário completo na licença de maternidade e adoção e 8 semanas com salário completo na licença de paternidade, e o programa «Your ScottishPower Benefits» permite escolher benefícios como o Share Incentive Plan, o programa Cycle to Work ou a compra de dias de férias adicionais.