Rejobs
SB Energy
SB Energy
13 个在招职位 · 56 天前发布

机械主管,数据中心建设

加入SB Energy,担任位于德克萨斯州Borden的数据中心建设机械主管。负责机械系统管理与协调,享受全额医疗福利和灵活工作安排。参与推动能源基础设施创新的团队。

薪资
US$115,000–165,000/年
地点
博登县,TX
工作地点
现场
工作类型
全职
在 sbenergy.com 申请

检查您的收件箱。

用手机?稍后可以在电脑上申请。

Do you want to work with high-caliber professionals in a dynamic and growing company? Are you entrepreneurial, hard-working, and collegial? Join us at SB Energy, a leading infrastructure company backed by SoftBank Group and Ares Infrastructure, pairing cutting-edge innovation with best-in-class execution. Our mission is to deliver reliable and secure data center and power infrastructure to strengthen America's future.

Founded in 2019, SB Energy is a SoftBank Group company headquartered in Redwood City, California. In 2026, SoftBank Group and OpenAI announced a $1 billion investment to support SB Energy as their leading development and execution partner for data center campuses, while Ares Infrastructure continues its long-standing support of the company's growth. SB Energy develops, builds, owns, and operates some of the largest and most technically advanced energy and data center infrastructure projects in the United States. Since its founding, the company has rapidly grown into a top-tier integrated platform with more than 3 gigawatts (GW) in operation and a multi-GW pipeline of energy and data center infrastructure nationwide.

SB Energy also leverages a strong culture of innovation to identify and integrate new technologies into its projects, including its AI-based digital platform, delivering energy infrastructure that is local, reliable, and matched to load. We are building the energy and infrastructure future-today.

Come join us in accelerating the energy and infrastructure transition!

Basic Function

Leadership of the datacenter construction team is committed to offering every team member an opportunity to engage your core skills and knowledge, while helping each person develop new and valuable skills throughout the duration of the project.

The Mechanical Lead is responsible for managing and coordinating all mechanical systems across data center construction projects. This role ensures that mechanical infrastructure is designed, constructed, tested and delivered to meet performance requirements, redundancy targets, and long-term operational reliability.

This individual works cross-functionally with internal teams, external design partners, and construction stakeholders to translate design intent into successful project execution.

Responsibilities

  • Manage the mechanical scope of work across all project phases including concept design, basis of design, detailed design, construction, and closeout.
  • Serve as the primary interface between internal teams and external mechanical engineering consultants
  • Coordinate with mechanical engineers and consultants on: cooling plant strategies, chilled water and/or refrigerant -based systems, CRAH/CRAC units and in-row cooling, pumping, piping, and heat rejection systems.
  • Review design deliverables for compliance with Owner standards, codes, constructability, and lifecycle considerations.
  • Serve as the Owner's representative for all mechanical systems during construction.
  • Review and manage mechanical submittals, RFIs, change orders, and field clarifications.
  • Monitor contractor performance related to safety, quality, schedule, and cost.
  • Participate in site walks, inspections, and quality audits.
  • Validate mechanical pay applications and change order pricing.
  • Coordinate mechanical scope with electrical, structural, and commissioning teams to ensure seamless system integration
  • Support commissioning activities including test procedures, system validation, and turnover documentation
  • Support detailed project schedules with emphasis on mechanical milestones and long-lead equipment procurement.
  • Assist with mechanical cost estimating, budget management, and forecasting.
  • Identify technical, constructability, or procurement risks impacting mechanical scope and develop mitigation strategies.
  • Provide mentorship and technical guidance to project engineers.

Qualifications/Requirements

  • Bachelor's degree in related field.
  • 5-10+ years of experience in mechanical engineering, project engineering, or construction management
  • Strong knowledge of data center cooling systems and thermal management, hydronic systems, piping, pumping, HVAC controls and sequences of operations, and reliability best practices.
  • Experience reviewing and coordinating with external engineering firms
  • Experience delivering large-scale, mission-critical, industrial or data center projects.
  • Strong communication and cross-functional collaboration skills

Location

Site-based role in Borden County, TX (Near Lubbock)

Base Pay

$115,000-$165,000

The pay range mentioned above is a guideline. We tailor each offer based on your unique skills, experience, location, and market benchmarks-while ensuring internal parity across our teams. In addition to competitive base pay, total compensation may include a discretionary annual bonus and a market leading comprehensive health and wellness benefits package. Final details will be discussed during the later stages of the hiring process.

Our Health & Wellness Benefits

At SB Energy, we invest in our people and their families with benefits designed for flexibility, support, and peace of mind. Full-time employees enjoy:

  • 100% Company-Paid Medical, Dental & Vision (for employees and dependents)
  • 401(k) with Company Match
  • Generous Paid Time Off + 11 Paid Holidays
  • 12 Weeks Paid Parental Leave
  • Life, AD&D & Long-Term Disability Coverage
  • Flexible Spending Accounts (FSA) for Medical, Dependent Care, Transit & Parking (with company contributions)
  • Mental, Physical & Social Wellness Support (with company contributions)
  • Flexible Work Arrangements & Hybrid Office Setup Benefits
  • Monthly Reimbursement for Phone, Internet & Data
  • Optional Legal & Pet Insurance Plans
  • Device Purchase Support

At SB Energy, the success of our projects is driven by a desire to see our projects benefit as many people as possible. We work to serve local communities through volunteering, fundraising, and much more. For example, we're proud to support access and opportunity in engineering and clean energy through impactful mentorship programs and workforce training. When you join SB Energy, you can become a part of these efforts, collaborating with team members who share a vision of building a better future now!

SB Energy is built on a foundation of collaboration and inclusion. We are proud to be an equal opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, creed, gender, national origin, age, disability, veteran status, marital status, pregnancy, sex, gender expression or identity, sexual orientation, citizenship, or any other legally protected class.

To learn more about us, visit www.sbenergy.com.

薪资与福利

US$115,000–165,000 /年
+ discretionary annual bonus
医疗保险 牙科保险 视力保险 人寿保险 伤残保险 退休计划 带薪休假 育儿假 弹性工作时间 身心健康

职位详情

发布时间
1 10月 2026
领域
时区
UTC-05:00
经验
5-10+ years
雇主 sbenergy.com LinkedIn SB Energy

关于 SB Energy

公司概况

SB Energy, Inc.,软银集团(SoftBank Group)旗下公司

美国加利福尼亚州Redwood City

2019年

2026年上半年营收1.39亿美元

业务范围

SB Energy是一家全面整合的美国数据中心与电力平台,负责开发、建设和运营关键基础设施。其已投运及在建的电力资产组合合计约5吉瓦,另有三座人工智能数据中心正在建设中。自2019年成立以来,公司已筹集190亿美元项目融资。

软银集团于2019年成立SB Energy,最初将其定位为可再生能源企业,公司于2025年转型为人工智能数据中心开发商。根据其招股说明书,公司几乎全部营收来自能源基础设施项目;其能源项目储备超过20吉瓦,分布在美国各地市场。

项目与业绩

2024年10月,SB Energy位于得克萨斯州Milam县的Orion Solar Belt三个太阳能项目投入商业运营,总装机容量约900 MWdc。SB Energy与谷歌就这些项目的发电量签订的购电协议(PPA),是谷歌在全球规模最大的太阳能投资。

在加利福尼亚州,SB Energy正在Riverside县建设Athos Storage储能项目,容量为1.6吉瓦时,采用Fluence储能技术,项目由公司持有并将由其运营。公司位于Kern县的Pelican’s Jaw项目同样在建,该项目结合954兆瓦时储能与570 MWdc太阳能,客户为San Diego Community Power。

2026年1月,OpenAI选定SB Energy建设并运营其1.2吉瓦数据中心园区,园区位于得克萨斯州Milam县。在俄亥俄州Pike县的PORTS-Pike Technology Campus,SB Energy将建设、持有并运营一座数据中心,并以20年期租约租给OpenAI。该园区与AEP Ohio、美国能源部和美国商务部合作开发,预计自2028年起分阶段投运。为此,SB Energy与软银将新建至少10吉瓦发电容量,并投资至少42亿美元用于区域电网基础设施。

近期动态

2026年1月,OpenAI与软银集团各向SB Energy投资5亿美元;此时SB Energy已收购Studio 151,这是一家从事数据中心施工管理、采购、工程和运营的公司,业绩涵盖20个数据中心园区。2026年8月,英伟达宣布向SB Energy投资15亿美元,与软银集团和OpenAI一同成为其投资方。

2026年9月,SB Energy公开提交了拟议首次公开募股的注册申请,申请以股票代码SBE在纳斯达克全球精选市场和纳斯达克德克萨斯交易所上市其普通股。同月晚些时候,由于投资者对估值存在异议,公司推迟了原计划首次公开募股的启动。

工作环境

SB Energy总部位于加利福尼亚州Redwood City,并在圣迭戈和丹佛设有其他办公室。其空缺职位按部门划分,包括数据中心项目、电网接入、工程与创新、项目开发与业务拓展、卓越运营、供应链管理、资本市场和财务等。

公司公布的福利包括全面的健康、残障和人寿保险、宽松的休假安排、心理健康支持、提供401(k)匹配缴款的退休福利以及混合办公支持。SB Energy提醒,来自@sbenergylp.com的电子邮件均为诈骗邮件,公司不会要求求职者提交自行录制的视频回答。

更多 太阳能 相似职位

机械主管,数据中心建设
SB Energy · US$115,000–165,000/年