Rejobs

维护整合规划师—通信

加入Transgrid,担任维护整合规划师—通信,工作地点为澳大利亚东克里克。规划通信设备维护、停电安排和资源配置,协调各方需求与运营限制,支持电网维护安全高效地开展。公司提供灵活工作安排和20周带薪育儿假。

薪资
未注明
地点
Eastern Creek,NSW
工作地点
现场
工作类型
全职
在 careers.transgrid.com.au 申请

检查您的收件箱。

用手机?稍后可以在电脑上申请。

职位描述

About the role

As a Maintenance Integration Planner (Telecommunications), you'll play key role in powering a more reliable energy future. You'll turn long-term strategies and corrective maintenance requirements into optimised medium-term work programs, ensuring the right resources, outages and equipment are in place to deliver critical maintenance safely, efficiently and at scale. Your planning expertise will directly support network performance and help keep communities connected.

What you'll do

Working across multiple stakeholders, you'll balance corrective maintenance requirements with long-term program requirements to create optimised, deliverable maintenance programs. Your expertise in work planning, resource allocation and scheduling will help maximise efficiency, improve program outcomes and ensure maintenance activities can be executed safely and effectively across the network.

  • Develop detailed work plans for maintenance activities, outages and resource requirements.
  • Optimise maintenance schedules to balance priorities, resources and operational constraints.
  • Coordinate resource allocation to support efficient maintenance delivery.
  • Partner with key stakeholders to resolve constraints and manage competing priorities.
  • Maintain planning systems and data to support accurate scheduling and delivery.

About you

You build strong relationships, communicate with confidence and work well as a team. With a solid understanding of policies, compliance requirements and confidentiality, you'll help deliver safe, efficient and reliable outcomes. You will bring:

  • Relevant technical qualifications in a Telecommunications Trade, Engineering or a related discipline, or equivalent industry experience.
  • Proven experience maintaining telecommunication assets within a utility, infrastructure or industrial environment.
  • Strong knowledge of work management, ERP and planning systems, with the ability to prioritise workloads and deliver effective scheduling outcomes.
  • An understanding of WHS, environmental and power system safety requirements
  • Ability to use data and insights to support decision-making.

Why join us?

This is a unique opportunity to shape how critical maintenance programs are planned and delivered, optimising resources, reducing network impacts and helping power a more reliable energy future.

Bring your best. We'll support the rest.

Enjoy flexible working, 20 weeks' paid parental leave, novated leasing and a wide range of corporate discounts designed to support your wellbeing, lifestyle and career.

We're committed to a safe, inclusive and respectful workplace where everyone can thrive. We encourage applications from all backgrounds and will provide adjustments to ensure you can participate fully in our recruitment process.

薪资与福利

育儿假

职位详情

发布时间
26 11月 2026
时区
UTC+10:00
经验
Proven experience maintaining telecommunications assets in a utility, infrastructure or industrial environment; no specific years stated.
雇主 transgrid.com.au LinkedIn Transgrid

关于 Transgrid

公司概况

Transgrid,与 Lumea 同属 Transgrid 集团;2015年新南威尔士州政府将该州输电网络以99年租约授予 NSW Electricity Networks,Transgrid 自此成为私营公司

澳大利亚悉尼

1995年

2025年员工1,928人;2025财年营收13.6亿澳元

业务范围

Transgrid 运营和管理新南威尔士州和澳大利亚首都领地的高压输电网络,将风电、太阳能、水电、燃气和燃煤发电的电力输送给大型工业用户和配电网络。该集团负责为新南威尔士州和澳大利亚首都领地超过370万户家庭和企业供电。其电网包括13,461公里高压输电线路、109公里地下电缆,以及将新南威尔士州与昆士兰州、维多利亚州和南澳大利亚州相连的六条互联线路。

集团的商业业务部门 Lumea 负责将可再生能源发电商接入输电网,并为可再生能源项目提供电信服务。

项目与业绩

EnergyConnect 是一条长900公里的互联线路,用于新南威尔士州、南澳大利亚州和维多利亚州之间的电力互济;Transgrid 负责建设其中700公里的新南威尔士州段,从 Wagga Wagga 延伸至南澳大利亚州边界,并连接维多利亚州的 Red Cliffs。HumeLink 是一条长365公里的新建500千伏输电线路,将在四处变电站新建或升级基础设施,计划于2027年第四季度完工。

VNI West(Victoria to NSW Interconnector West)是一条拟建的500千伏双回输电线路。2025财年,集团通过 Lumea 将总计2,341兆瓦的电池储能、太阳能和风电场发电容量接入电网。

近期动态

2026年6月,Transgrid 与其建设合作伙伴 Elecnor Australia 完成了 EnergyConnect 新南威尔士州段700公里线路的建设。HumeLink 于2024年12月获得联邦政府批准,前期工程随后于2025年1月启动,同年晚些时候开始正式施工。

2025年10月,Transgrid 宣布 GE Vernova 将在五个站点各供应并安装两台同步调相机。2025财年,集团资本支出创下30亿澳元的纪录,主要来自重大项目和 Lumea 的并网项目。其2025年可持续发展报告列出了两家新的证券持有人:新加坡主权财富基金 GIC 和澳大利亚政府的未来基金(Future Fund)。

工作环境

Transgrid 总部位于悉尼,并在西悉尼、Orange、纽卡斯尔、Tamworth、Wagga Wagga、墨尔本和 Yass 设有地区办事处。其职业发展项目有 Pre-Apprenticeship Program for Women、Apprentice Program、Summer Internship Program、Graduate Program 和 Project Management Pathways Program。毕业生岗位设在 Ultimo,电气工程岗位还可在纽卡斯尔和 Eastern Creek 任职。

受企业协议(Enterprise Agreement)覆盖的员工实行两周工作九天制,公司为主要照顾者提供20周不分性别的带薪育儿假,或40周半薪假。

更多 电网与公用事业 相似职位

维护整合规划师—通信
Transgrid