Site Supervisor Concrete Tower (m/w/d)
Nordex
Virksomhedsoversigt
Nordex SE
Hamburg, Tyskland
1985
Over 10.900 medarbejdere verden over (Kilde: linkedin.com). Omsætning på over 5,7 milliarder euro i 2023 (Kilde: renewable-energy-industry.com).
Hvad de gør
Nordex fokuserer udelukkende på onshore vindmøller i klassen 4 til 6 MW+. Virksomheden udvikler, producerer, installerer og vedligeholder disse møller gennem integrerede processer, der omfatter design, præcisionsingeniørarbejde, rotorblad- og tårnproduktion, logistik, nøglefærdig installation og fuld livscyklusvedligeholdelse (Kilde: windindustry-in-germany.com). Kerneplatformen Delta4000, der blev introduceret i 2017 med N149/4.X, tilbyder fleksible effektværdier (4-6 MW) og rotordiametre på op til 175 meter. Denne platform er optimeret til forskellige vindforhold og ekstreme klimaforhold (Kilde: nordex-online.com). Produkterne henvender sig til forskellige kundesegmenter, herunder forsyningsselskaber, uafhængige strømproducenter og borgervindprojekter, og tilbyder skræddersyede løsninger til stedbegrænsede eller netbegrænsede lokationer med livscyklus på op til 35 år.
Projekter & Resultater
I Tyskland har Nordex taget 8.653 MW onshore vindkraftanlæg i drift, med 4.946 MW under opførelse, herunder den første vindpark i Hamburg med N27/150-møller, der har været i drift i over 32 år (Kilde: nordex-online.com). En prototype af N175/6.X på et 179 m højt hybridtårn i Santow, Mecklenburg-Vorpommern, er i pre-serie, med installation i september 2025 og idriftsættelse mellem oktober 2025 og januar 2026 (Kilde: nordex-online.com). Globalt leverer Nordex over 52 GW installerede møller i 85% af markederne uden for Kina, med cirka 1 GW i Canada, der omfatter N163/5.X, N163/6.X og N175/6.X-koldklimamodeller (Kilde: windindustry-in-germany.com). Blandt hovedkunderne er Borgervind Hollich GmbH & Co. KG og Energieversorgung Mittelrhein (evm), der indgår langsigtede partnerskaber for nøglefærdige projekter og vedligeholdelse.
Aktuelle udviklinger
I de seneste to år har Nordex sikret sig betydelige kontrakter i Tyskland, herunder 107 MW repowering i Nordrhein-Westfalen for Borgervind Hollich med 12 N163/6.X på 164 m høje hybridtårne (Kilde: renewable-energy-industry.com). Andre kontrakter omfatter 21 MW fra BMR energy solutions til "Heinz"-stedet og 77 MW til vindparken Schneifelhøhe (Kilde: renewable-energy-industry.com). Blandt milepælene er idriftsættelsen af 2.202,2 MW i Tyskland i første halvdel af 2025 og introduktionen af serieproduktion af hybridtårne i april 2025 (Kilde: nordex-online.com). Fusionen med Acciona Windpower i 2016 forbliver en afgørende ekspansion, uden at der i de seneste kilder nævnes yderligere opkøb eller finansieringsrunder.
Arbejder der
Nordex beskæftiger over 10.900 medarbejdere inden for forskellige områder, herunder udvikling, produktion, projektledelse, installation, logistik, salg og service (Kilde: nordex-online.com). Virksomhedskulturen lægger vægt på decentrale regionale operationer for nærhed til kunderne og løbende træning for teknikere på globale standarder. Uddannelsen foregår gennem Nordex Academy, der omfatter GWO-certificeringer og praktisk træning på Delta4000-simulatorer (Kilde: nordex-online.com). Ansættelsen sker på lokationerne i Hamburg og Rostock samt i produktionsanlæg i flere lande, hvor efterspørgslen efter installations- og serviceteknikere i Nordrhein-Westfalen og Rheinland-Pfalz stiger (Kilde: renewable-energy-industry.com).
Sidst opdateret den 2026-02-23 | Rapporter et problem
Job Description
Provide technical expertise during the installation and finishing phase in order to prepare the Winturbine/ Windfarm for commissioning. Additionally, can be involved in resolving quality deviations (de-snagging) to ensure not only a smooth handover to the customer but also a smooth operation over the Windturbine's lifetime. To achieve this, all installation and finishing activities are to be executed in a safe manner considering the highest standards of safety, quality, and efficiency. This position must be full time on site.
Your Tasks
- Support the QM on technical non-conformities and to ensure compliance with 'Management of Change' requirements for reporting, developing solutions and implementation
- Support the SM for Quality Gate 1 and incoming goods inspections
- Assist the SM, QM and Civil PE on pre-erection anchor cage and foundation checks
- Support the SM and QM with collating and checking for completeness, before releasing the Pre-erection documentation, Statutory Inspections and reports
- Organise and support the Gate 23 process with the SM and QM
- Collate the necessary information for reporting and managing NCRs and Incidents in UPVISE/Service Now or the prevailing software management tool
- Maintain close contact with QM for ordering and tracking missing parts and Requisition Notes (RNs)
- Resolving quality deviations (de-snagging) to ensure not only a smooth handover to the customer but also a smooth operation over the WT lifetime. To achieve this, all installation and finishing activities are to be executed in a safe manner considering the highest standards of safety, quality and efficiency.
Your Profile
- Bachelor's degree in Engineering or related discipline
- Other degrees will be considered proving an extensive experience in the wind industry (5 to 7 years)
- Proficiency with Health and Safety procedures/ methods such as LOTO (lock out tag out), electrical safety, fall protection awareness, basic understanding of hazardous materials (MSDN)
- Systematic problem-solving and safety orientated behaviour.
- Strong personal planning & organisation skills.
- English is a must. Minimum B2.
- The position has a high travel requirement, domestically and/or internationally
- Capability to comprehend and adapt to rapidly changing technologies
- Proficient computer skills utilizing MS Office basic programs (MS Word, Excel, Outlook, PowerPoint)
- Will be a plus familiarity with several technologies such as Mechanical & rotating systems, basic understanding of hydraulic systems.
- Will be a plus familiarity with general procedures such as construction, installation and finishing, testing of mechanical installations, quality management.
- Will be a plus familiarity with several tools such as Mechanical measuring tools (e.g. digital calliper), Hydraulic torquing/ tensioning tools (e.g. HyTorc, ITH).
Ansøg nu
Job udløbet?Lad venligst Nordex vide, at du fandt dette job på Rejobs. Dette vil hjælpe os med at vokse og få flere mennesker til at arbejde med vedvarende energi!
Ansøg nu
Job udløbet?Lad venligst Nordex vide, at du fandt dette job på Rejobs. Dette vil hjælpe os med at vokse og få flere mennesker til at arbejde med vedvarende energi!
Hvordan du er forbundet via LinkedIn
Se forbindelserSe dine kontakter hos Nordex på LinkedIn for at udnytte dit netværk, når du søger denne stilling.
Få jobvarsler
Få påmindelser om jobs inden for Landbaseret Vindenergi i Tajonar, Spanien
Tilmeld talentpoolen
Bliv fundet af førende arbejdsgivere inden for ren energi
Om rollen
10. marts 2026
Fuldtid
Virksomhed
13. marts 2026
På stedet
- Tajonar, Spanien
5 to 7 years in the wind industry
UTC+01:00