Commercial Manager
Snowy Hydro Limited
Virksomhedsoversigt
Snowy Hydro Limited
NSW, Australien
1949
Ca. 1.000-5.000 ansatte (kilde: leadiq.com). Snowy Hydro er et 100% ejet Commonwealth-selskab uden offentlige indtægtsdata tilgængelige for 2023 eller senere.
Hvad de laver
Snowy Hydro's kernefokus er på pumpet hydroelektricitet, gasfyret spidslast, dieselspidslast samt kontrakterede vind- og solenergi. Virksomheden driver 16 kraftværker og én pumpestation, med en samlet genereringskapacitet på over 5.500 MW, der sendes til det nationale elmarked (kilde: snowyhydro.com.au). Snowy Mountains Hydroelektriske Anlæg, som er en væsentlig del af deres drift, omfatter ni hydroelektriske kraftværker og 16 dæmninger, der er forbundet af 145 km tunneler og 80 km akvædukter, primært beliggende i Kosciuszko Nationalpark. Derudover forvalter Snowy Hydro vandopbevaring og afledning under Snowy Water Licence til vanding af Murray- og Murrumbidgee-systemerne (kilde: wikipedia.org).
Projekter & Resultater
Snowy Hydro har en rig historie med bemærkelsesværdige projekter, herunder det oprindelige Snowy Mountains Hydroelektriske Anlæg, som blev færdiggjort i 1974 og leverede en samlet produktion på 3.740 MW fra syv kraftværker, såsom Guthega, der begyndte driften i 1955 (kilde: snowyhydro.com.au). Virksomheden driver også betydelige gasaktiver, herunder Colongra Kraftværk (667 MW, erhvervet i 2015), Laverton North (320 MW) og Latrobe Valley (300 MW) i Victoria, samt tre dieselstationer i South Australia med en samlet kapacitet på 136 MW (kilde: wikipedia.org). Aktuelt omfatter store projekter Snowy 2.0, som har til formål at forbinde Tantangara- og Talbingo-dæmningerne via en 27 km underjordisk tunnel og etablere en ny pumpet-hydrostation til 2.000 MW produktion og 175 timers opbevaring, med byggeriet der begyndte i 2019 (kilde: snowyhydro.com.au).
Seneste Udviklinger
I marts 2018 erhvervede den australske regering fuld ejerskab af Snowy Hydro ved at købe aktier fra New South Wales og Victoria, hvilket bekræftede virksomhedens status som et 100% ejet Commonwealth-foretagende (kilde: snowyhydro.com.au). Byggeriet af Snowy 2.0 er et betydeligt fremskridt i virksomhedens portefølje, der markerer det som et nation-building pumpet-hydroprojekt, der begyndte i 2019 (kilde: snowyhydro.com.au). Derudover har Snowy Hydro sikret kontrakter for over 1.000 MW fra ti vind- og solprojekter, hvilket forbedrer deres tilbud inden for vedvarende energi (kilde: leadiq.com).
At Arbejde Der
Snowy Hydro tilbyder en bred vifte af roller på tværs af forskellige afdelinger, herunder generation (hydro, gas, dieseloperationer), ingeniørarbejde, byggeri og detailservice gennem mærker som Red Energy og Lumo Energy. Virksomheden har også muligheder inden for støttefunktioner som IT, HR og finans, med ansættelser der finder sted på deres hovedkontor i Cooma, kontoret i Sydney og forskellige projektsteder i New South Wales og Victoria (kilde: leadiq.com). Virksomhedskulturen lægger vægt på samfundsstøtte og har en lang historie med at integrere en multikulturel arbejdsstyrke, hvor 65% af den oprindelige arbejdsstyrke var migranter fra over 30 nationer (kilde: nma.gov.au). Selvom specifikke fordele ikke er detaljeret i de tilgængelige kilder, er virksomheden kendt for sit engagement i kundeservice i topklasse gennem sine detailmærker (kilde: leadiq.com).
Sidst opdateret den feb. 23, 2026 | Rapporter et problem
Job Description
Step into a career that's as big as Australia's energy future! Snowy 2.0 is more than a project-it's the nation's largest renewable energy initiative, expanding the iconic Snowy Scheme to deliver reliable power and critical energy storage. As part of the client-side Owner's Team, we lead the charge, working hand-in-hand with delivery partners and stakeholders to make Snowy Hydro's vision of a sustainable, reliable energy future a reality.
About the position
We're looking for Commercial Managers to take a key leadership role on the Snowy 2.0 Project. You'll oversee all commercial and contractual aspects, managing relationships, ensuring compliance, and strategically navigating claims, variations, and negotiations. This is your chance to make a real impact on one of Australia's most ambitious infrastructure projects.
The role is based in Cooma, with a generous relocation package for those ready to move. Can't relocate? A FIFO (5:2) roster will also be considered for the right candidate.
Key Responsibilities
- Lead Contract Negotiations - Use your Quantity Surveying and Cost Management expertise to drive high-impact negotiations with contractors on claims and variations, safeguarding Snowy Hydro's interests and project objectives.
- Build Stakeholder Partnerships - Develop and maintain strong relationships with internal teams, contractors, and stakeholders to ensure seamless project delivery.
- Manage Subcontract Variations - Serve as the go-to contracts expert, managing subcontract variations with clarity, precision, and consistent communication.
- Resolve Claims and Variations - Strategically balance risk, opportunity, and long-term project goals when resolving claims and variations.
- Ensure Compliance - Maintain legal, regulatory, and contractual compliance to reduce risk and support proactive decision-making.
- Risk Management - Identify, assess, and mitigate risks linked to claims, variations, and commercial issues before they escalate.
- Commercial Reporting & Insights - Provide actionable insights and reporting to senior leadership, translating complex commercial and cost data into strategic guidance.
- Drive Continuous Improvement - Streamline processes, drive efficiency, and embed best-practice contract and cost management across the team.
- Team Leadership & Mentorship - Mentor and guide team members, fostering a collaborative, high-performing commercial and contracts culture.
About the location
This role is based in Cooma with FIFO and DIDO options available.
About you
You hold a Bachelor's or Master's degree in Quantity Surveying, Construction Management, Engineering, Law, or a related discipline, backed by extensive senior-level experience in contract administration or management. You've built a strong record managing claims and variations on major projects, with exceptional expertise in Quantity Surveying and/or Cost Engineering - particularly in cost management and forecasting.
About our workforce
At Snowy 2.0, we live by "One Team Working Together." If you thrive on problem-solving, love a challenge, and want to make a real difference, this is your chance to join a team shaping the future of renewable energy. Come be part of one of Australia's most iconic infrastructure projects-apply now and start your Snowy story!
Ansøg nu
Job udløbet?Sig venligst til Snowy Hydro Limited, at du fandt dette job på Rejobs. Det hjælper os med at vokse og få flere i arbejde inden for vedvarende energi.
Ansøg nu
Job udløbet?Sig venligst til Snowy Hydro Limited, at du fandt dette job på Rejobs. Det hjælper os med at vokse og få flere i arbejde inden for vedvarende energi.
Hvordan du er forbundet via LinkedIn
Se forbindelserSe dine kontakter hos Snowy Hydro Limited på LinkedIn for at udnytte dit netværk, når du søger denne stilling.
Få jobvarsler
Få jobvarsler for EPC-ledelse-job i Cooma, Australien
Tilmeld dig Talent Pool
Bliv fundet af førende arbejdsgivere inden for ren energi
Om rollen
24. juni 2026
24. juni 2026
Fuldtid
Hybrid
Virksomhed
- Cooma, Australien
Senior-level experience in contract administration or management
UTC+10:00