Snowy Hydro Limited

Senior Site Engineer Elektrisk

Bliv Senior Site Engineer Electrical hos Snowy Hydro i Snowy Mountains, Australien. Led elektrisk byggeovervågning på Snowy 2.0 projektet med fokus på sikkerhed og kvalitet. Arbejd på en 14/7 FIFO-ordning på et af Australiens største infrastrukturprojekter.

Snowy Hydro Limited

Virksomhedsoversigt

Snowy Hydro Limited

NSW, Australien

1949

Ca. 1.000-5.000 ansatte (kilde: leadiq.com). Snowy Hydro er et 100% ejet Commonwealth-selskab uden offentlige indtægtsdata tilgængelige for 2023 eller senere.

Hvad de laver

Snowy Hydro's kernefokus er på pumpet hydroelektricitet, gasfyret spidslast, dieselspidslast samt kontrakterede vind- og solenergi. Virksomheden driver 16 kraftværker og én pumpestation, med en samlet genereringskapacitet på over 5.500 MW, der sendes til det nationale elmarked (kilde: snowyhydro.com.au). Snowy Mountains Hydroelektriske Anlæg, som er en væsentlig del af deres drift, omfatter ni hydroelektriske kraftværker og 16 dæmninger, der er forbundet af 145 km tunneler og 80 km akvædukter, primært beliggende i Kosciuszko Nationalpark. Derudover forvalter Snowy Hydro vandopbevaring og afledning under Snowy Water Licence til vanding af Murray- og Murrumbidgee-systemerne (kilde: wikipedia.org).

Projekter & Resultater

Snowy Hydro har en rig historie med bemærkelsesværdige projekter, herunder det oprindelige Snowy Mountains Hydroelektriske Anlæg, som blev færdiggjort i 1974 og leverede en samlet produktion på 3.740 MW fra syv kraftværker, såsom Guthega, der begyndte driften i 1955 (kilde: snowyhydro.com.au). Virksomheden driver også betydelige gasaktiver, herunder Colongra Kraftværk (667 MW, erhvervet i 2015), Laverton North (320 MW) og Latrobe Valley (300 MW) i Victoria, samt tre dieselstationer i South Australia med en samlet kapacitet på 136 MW (kilde: wikipedia.org). Aktuelt omfatter store projekter Snowy 2.0, som har til formål at forbinde Tantangara- og Talbingo-dæmningerne via en 27 km underjordisk tunnel og etablere en ny pumpet-hydrostation til 2.000 MW produktion og 175 timers opbevaring, med byggeriet der begyndte i 2019 (kilde: snowyhydro.com.au).

Seneste Udviklinger

I marts 2018 erhvervede den australske regering fuld ejerskab af Snowy Hydro ved at købe aktier fra New South Wales og Victoria, hvilket bekræftede virksomhedens status som et 100% ejet Commonwealth-foretagende (kilde: snowyhydro.com.au). Byggeriet af Snowy 2.0 er et betydeligt fremskridt i virksomhedens portefølje, der markerer det som et nation-building pumpet-hydroprojekt, der begyndte i 2019 (kilde: snowyhydro.com.au). Derudover har Snowy Hydro sikret kontrakter for over 1.000 MW fra ti vind- og solprojekter, hvilket forbedrer deres tilbud inden for vedvarende energi (kilde: leadiq.com).

At Arbejde Der

Snowy Hydro tilbyder en bred vifte af roller på tværs af forskellige afdelinger, herunder generation (hydro, gas, dieseloperationer), ingeniørarbejde, byggeri og detailservice gennem mærker som Red Energy og Lumo Energy. Virksomheden har også muligheder inden for støttefunktioner som IT, HR og finans, med ansættelser der finder sted på deres hovedkontor i Cooma, kontoret i Sydney og forskellige projektsteder i New South Wales og Victoria (kilde: leadiq.com). Virksomhedskulturen lægger vægt på samfundsstøtte og har en lang historie med at integrere en multikulturel arbejdsstyrke, hvor 65% af den oprindelige arbejdsstyrke var migranter fra over 30 nationer (kilde: nma.gov.au). Selvom specifikke fordele ikke er detaljeret i de tilgængelige kilder, er virksomheden kendt for sit engagement i kundeservice i topklasse gennem sine detailmærker (kilde: leadiq.com).


Sidst opdateret den feb. 23, 2026 | Rapporter et problem

Snowy Hydro is a dynamic, integrated energy business that has been providing on-demand, reliable energy to Australia for generations. Snowy Hydro owns and operates a powerful combination of generation assets, including the iconic Snowy Hydro-electric Scheme, gas and diesel electricity generating plants, and contracted wind and solar energy in the National Electricity Market. We also provide electricity and gas to over 1.5 million retail customers through our retail brands Red Energy and Lumo Energy.

Snowy 2.0, currently under construction, is Australia's largest committed renewable energy project. This nation-building project will provide on-demand energy and large-scale storage for many generations to come.

About the position

Are you an experienced Electrical Engineer looking to make a significant impact on one of Australia's most complex and iconic infrastructure projects? We are looking for a dedicated Senior Project Engineer (Electrical) to join our Snowy 2.0 site team. This is a unique opportunity to provide vital engineering oversight and assurance, ensuring that our electrical construction and installation works meet the highest standards and contractual requirements.

You won't just be checking boxes; you'll be a proactive leader on the ground. Reporting directly to the Site Manager (Electrical), you'll act as their 2IC and play a key role in the project's success.

Key Responsibilities

  • Leading with Safety: You'll champion our commitment to health and safety, ensuring all activities align with Snowy Hydro's policies and values.
  • Driving Excellence: You will provide assurance that construction and installation works are delivered exactly as designed, preventing legacy issues and ensuring the long-term performance of the Snowy 2.0 asset.
  • Proactive Oversight: You will be our eyes and ears on site, reviewing the contractor's performance to identify and resolve potential issues before they become delays or quality concerns.
  • Technical Collaboration: You'll work closely with a multidisciplinary team, providing technical support to site engineers and assurance officers, and coordinating with major contractors like Voith and Future Generation Joint Venture

About the location

This role will require you to be 100% on-site, working off a 14/7 FIFO roster. Standard FIFO camp-style arrangements are included.

About you

We are looking for someone who is as technically capable as they are collaborative. To succeed in this role, you'll need:

  • Qualifications: A degree in Electrical Engineering that makes you eligible for Corporate Membership of the Institution of Engineers Australia.
  • Experience: Experience on large-scale, complex civil or infrastructure projects and knowledge of EM installation.
  • Adaptability: The ability to establish priorities, work autonomously, and adapt effectively to changing site circumstances.
  • Communication: Excellent interpersonal skills to build robust, collaborative relationships with internal and external stakeholders.

About our workforce

Diversity and inclusion is important to us: Snowy Hydro has a culture of decency and inclusion, with a commitment to the health and wellbeing of our people and a supportive environment to ensure that everyone - regardless of background - feels included and can succeed. At Snowy Hydro, we recognise that we are made stronger by the unique capabilities and qualities that each individual brings, and we believe in providing an environment that allows that uniqueness to thrive.

Snowy Hydro is proud to be an Equal Opportunity employer. We are committed to the values of Equal Employment Opportunity and provide accessibility accommodations to applicants with physical and/or mental disabilities. If you are interested in applying for a role with Snowy Hydro and are in need of accommodation or special assistance to navigate our website or to complete your application, please send an email with your request to the Snowy Hydro recruitment team at [email protected].

Ansøg nu

Job udløbet?

Sig venligst til Snowy Hydro Limited, at du fandt dette job på Rejobs. Det hjælper os med at vokse og få flere i arbejde inden for vedvarende energi.

Om rollen

2. juli 2026

7. juli 2026

Fuldtid

På stedet

Virksomhed

Solenergi, Vindenergi, Vandkraft, Energilagring

Snowy Hydro Limited

snowyhydro.com.au

  •  Snowy Mountains, Australien

Experienced

UTC+10:00