Snowy Hydro Limited

Maskiningeniør

Bliv mekanisk ingeniør hos Snowy Hydro i Cooma og bidrag til Snowy 2.0 projektet. Arbejd med design, kvalitetskontrol og idriftsættelse på et stort vedvarende energiprojekt. Nyd et inkluderende arbejdsmiljø med mulighed for flytning eller FIFO.
Snowy Hydro Limited
Snowy Hydro Limited
Cooma, Australien På stedet Fuldtid UTC+10:00

Snowy Hydro Limited

Virksomhedsoversigt

Snowy Hydro Limited

NSW, Australien

1949

Ca. 1.000-5.000 ansatte (kilde: leadiq.com). Snowy Hydro er et 100% ejet Commonwealth-selskab uden offentlige indtægtsdata tilgængelige for 2023 eller senere.

Hvad de laver

Snowy Hydro's kernefokus er på pumpet hydroelektricitet, gasfyret spidslast, dieselspidslast samt kontrakterede vind- og solenergi. Virksomheden driver 16 kraftværker og én pumpestation, med en samlet genereringskapacitet på over 5.500 MW, der sendes til det nationale elmarked (kilde: snowyhydro.com.au). Snowy Mountains Hydroelektriske Anlæg, som er en væsentlig del af deres drift, omfatter ni hydroelektriske kraftværker og 16 dæmninger, der er forbundet af 145 km tunneler og 80 km akvædukter, primært beliggende i Kosciuszko Nationalpark. Derudover forvalter Snowy Hydro vandopbevaring og afledning under Snowy Water Licence til vanding af Murray- og Murrumbidgee-systemerne (kilde: wikipedia.org).

Projekter & Resultater

Snowy Hydro har en rig historie med bemærkelsesværdige projekter, herunder det oprindelige Snowy Mountains Hydroelektriske Anlæg, som blev færdiggjort i 1974 og leverede en samlet produktion på 3.740 MW fra syv kraftværker, såsom Guthega, der begyndte driften i 1955 (kilde: snowyhydro.com.au). Virksomheden driver også betydelige gasaktiver, herunder Colongra Kraftværk (667 MW, erhvervet i 2015), Laverton North (320 MW) og Latrobe Valley (300 MW) i Victoria, samt tre dieselstationer i South Australia med en samlet kapacitet på 136 MW (kilde: wikipedia.org). Aktuelt omfatter store projekter Snowy 2.0, som har til formål at forbinde Tantangara- og Talbingo-dæmningerne via en 27 km underjordisk tunnel og etablere en ny pumpet-hydrostation til 2.000 MW produktion og 175 timers opbevaring, med byggeriet der begyndte i 2019 (kilde: snowyhydro.com.au).

Seneste Udviklinger

I marts 2018 erhvervede den australske regering fuld ejerskab af Snowy Hydro ved at købe aktier fra New South Wales og Victoria, hvilket bekræftede virksomhedens status som et 100% ejet Commonwealth-foretagende (kilde: snowyhydro.com.au). Byggeriet af Snowy 2.0 er et betydeligt fremskridt i virksomhedens portefølje, der markerer det som et nation-building pumpet-hydroprojekt, der begyndte i 2019 (kilde: snowyhydro.com.au). Derudover har Snowy Hydro sikret kontrakter for over 1.000 MW fra ti vind- og solprojekter, hvilket forbedrer deres tilbud inden for vedvarende energi (kilde: leadiq.com).

At Arbejde Der

Snowy Hydro tilbyder en bred vifte af roller på tværs af forskellige afdelinger, herunder generation (hydro, gas, dieseloperationer), ingeniørarbejde, byggeri og detailservice gennem mærker som Red Energy og Lumo Energy. Virksomheden har også muligheder inden for støttefunktioner som IT, HR og finans, med ansættelser der finder sted på deres hovedkontor i Cooma, kontoret i Sydney og forskellige projektsteder i New South Wales og Victoria (kilde: leadiq.com). Virksomhedskulturen lægger vægt på samfundsstøtte og har en lang historie med at integrere en multikulturel arbejdsstyrke, hvor 65% af den oprindelige arbejdsstyrke var migranter fra over 30 nationer (kilde: nma.gov.au). Selvom specifikke fordele ikke er detaljeret i de tilgængelige kilder, er virksomheden kendt for sit engagement i kundeservice i topklasse gennem sine detailmærker (kilde: leadiq.com).


Sidst opdateret den feb. 23, 2026 | Rapporter et problem

Snowy Hydro is a dynamic, integrated energy business that has been providing on-demand, reliable energy to Australia for generations. Snowy Hydro owns and operates a powerful combination of generation assets, including the iconic Snowy Hydro-electric Scheme, gas and diesel electricity generating plants, and contracted wind and solar energy in the National Electricity Market. We also provide electricity and gas to over 1.5 million retail customers through our retail brands Red Energy and Lumo Energy.

Snowy 2.0, currently under construction, is Australia's largest committed renewable energy project. This nation-building project will provide on-demand energy and large-scale storage for many generations to come.

About the position

We are seeking a driven Mechanical Engineer to join the iconic Snowy 2.0 project. Based in Cooma, you will play a critical role in the mechanical engineering aspects of the project, from design and manufacturing through to site installation and commissioning.

Reporting directly to the Lead Mechanical Engineer, you will ensure our technical quality standards are met without compromising project schedules, while acting as a key interface between contractors, consultants, and multi-disciplinary teams.

Key Responsibilities

  • Design & Engineering: Conducting comprehensive design reviews of contractor submissions to ensure compliance with Employer Requirements and relevant codes.
  • Manufacturing Quality: Evaluating Non-Conformance Reports (NCRs) and undertaking short assignments (around 0.5 months) for Factory Acceptance Tests (FATs) and manufacturing surveillance.
  • Site Installation & Commissioning: Providing assurance that the plant is built to design, undertaking periodic site inspections (3-4 days), and facilitating the handover from the Contractor to Snowy Hydro.
  • Stakeholder Collaboration: Interfacing seamlessly with other disciplines to ensure integrated designs and constructively resolving conflicts to maintain effective working relationships.
  • Safety Leadership: Maintaining the highest standards of health and safety, leading by example, and actively championing Snowy Hydro's core values.

About the location

This role is located at our Head Office in Cooma NSW, working Monday to Friday. With FIFO or Relocation for the right candidate.

About you

  • Qualifications: A tertiary qualification in a mechanical engineering discipline.
  • Experience: 5+ years experience in a similar role in civil construction, utilities or a related industry.
  • Industry Knowledge: Extensive knowledge of power generation, procurement, construction and commissioning activities.
  • Communication Skills: Excellent verbal and written communications skills, including the ability to convey information and ideas clearly to individuals and groups.
  • Problem Solving: The ability to identify issues, problems and opportunities, make timely decisions, and assist in solution findings.
  • Bonus Skills: An interest in BIM and asset registers could be advantageous.

About our workforce

Diversity and inclusion is important to us: Snowy Hydro has a culture of decency and inclusion, with a commitment to the health and wellbeing of our people and a supportive environment to ensure that everyone - regardless of background - feels included and can succeed. At Snowy Hydro, we recognise that we are made stronger by the unique capabilities and qualities that each individual brings, and we believe in providing an environment that allows that uniqueness to thrive.

Snowy Hydro is proud to be an Equal Opportunity employer. We are committed to the values of Equal Employment Opportunity and provide accessibility accommodations to applicants with physical and/or mental disabilities. If you are interested in applying for a role with Snowy Hydro and are in need of accommodation or special assistance to navigate our website or to complete your application, please send an email with your request to the Snowy Hydro recruitment team at [email protected].

Ansøg nu

Job udløbet?

Sig venligst til Snowy Hydro Limited, at du fandt dette job på Rejobs. Det hjælper os med at vokse og få flere i arbejde inden for vedvarende energi.

Om rollen

9. juli 2026

16. juli 2026

Fuldtid

På stedet

Virksomhed

Solenergi, Vindenergi, Vandkraft, Energilagring

Snowy Hydro Limited

snowyhydro.com.au

  •  Cooma, Australien

5+ years

UTC+10:00