Detalles del empleo
We are at the beginning of a global energy transformation of a scale not seen in generations. A future low-cost, low-carbon electric grid, serving a world that electrifies everything, is within our reach.
The last remaining gap is breaking the link between electricity supply and demand. The lowest-cost, most sustainable sources of energy today come from intermittent renewable generation; but our homes, businesses and industries need electricity at the flick of a switch.
That gap can be closed by energy storage: Devices that store electricity when it is plentiful, then provide power back to the grid when it is needed. Solutions, including ones using lithium-ion batteries, are being deployed in massive numbers to start filling this gap. But so far, none of those solutions have proven the ability to deliver power any time, anywhere, over decades of service: The level of reliability we've come to expect, and that the future grid will need.
This is the biggest challenge in energy today. Invinity is at the forefront of finding a solution. And we need you to help us deliver it.
Developed, manufactured and delivered by our teams in Canada and the UK, Invinity's vanadium flow batteries (or "VFBs") can be installed anywhere and consistently deliver electricity as needed over a service life exceeding 30 years. Moreover, Invinity's VFBs are highly recyclable, don't rely on rare or conflict minerals, and won't catch fire.
Invinity is a global VFB leader, with over 190 megawatt-hours of its batteries operational or in construction for over 82 projects across 15 countries - more than any other emerging energy storage provider. We've deployed the largest flow battery systems in the U.S., Canada, Australia, and the UK. Along the way we've earned financial support from the UK Infrastructure Bank, the U.S. Department of Energy, and some of the world's leading institutional investors.
The Operations Change Analyst coordinates, analyzes, and supports the execution of operational, manufacturing, supplier, service, and engineering changes across Invinity Energy Systems. This role ensures that changes are correctly classified, accurately reflected in operational systems, implemented efficiently, and verified with minimal disruption to production, service, quality, cost, or delivery commitments. The role works cross-functionally with Engineering, Operations, Quality, Supply Chain, Manufacturing Engineering, Supplier Development / Supplier Quality, and external partners to maintain execution discipline and clear visibility across the change lifecycle. This role reports to Supplier Development / Strategic Sourcing.
Reporting and ownership
Reporting and ownership: This role reports into Supplier Development / Strategic Sourcing and acts as the operational change-control coordinator for approved engineering, manufacturing, supplier, and service changes. The role is accountable for maintaining change visibility, coordinating execution readiness, and ensuring that operational systems, supplier information, cost data, and validation evidence remain aligned to approved change decisions.
Key Responsibilities
Change Classification & Impact Analysis
- Classify and manage types of changes including documentation changes, non‑revision changes, and manufacturing change orders (MCOs).
- Analyze operational, inventory, cost, timing, and risk impacts of changes.
- Perform inventory analysis to identify exposure, disposition actions, and planning impacts.
ERP, Item Master & Cost Data Management
- Maintain Item Master and Cost Master information aligned to approved changes.
- Ensure accuracy of part attributes, lifecycle states, costing, and effectivity in Operations.
- Prepare BOM exports and documentation for Manufacturing Engineering, Supplier Development and other Operations team members for use at CMs, and suppliers.
Validation & Quality Coordination
- Coordinate validation activities such as FAI, PPAP, capability studies, test reports, qualification builds, and process validation evidence.
- Track and document completion of validation activities.
- Follow up on Change Implementation activities
Manufacturing & Process Documentation
- Ensure manufacturing and quality documents are indexed as required by Engineering changes including PFMEAs, Control Plans, Process Flow Diagrams, Work Instructions, and Inspection Plans.
Implementation, Verification & Service Support
- Coordinate implementation plans for service‑related changes.
- Perform and document basic verification of implemented changes.
- Support production and service teams during change cut‑in and early execution.
Reporting & Visibility
- Provide operations‑focused reporting on change status, progress, risks, and completion.
Additional Responsibilities
- Act as a Jira project expert and support for Operations including administration support for Ostro.
- Support supplier scorecard preparation and maintenance.
- Assist with supplier funnel activities, sanctions screening, and vendor onboarding.
- Support PDP documentation and organization of phase‑gate records.
Qualifications
Education
- Technical Diploma or Degree in Engineering, Manufacturing, Supply Chain, Operations, or related discipline.
Experience
- Experience in operations, change management, manufacturing, supply chain, or ERP‑driven roles.
- Experience with manufacturing or technical environments preferred.
Key Competencies
- Strong analytical and organizational skills.
- Attention to detail and high documentation discipline.
- Clear communicator across technical and operational teams.
- Ability to manage multiple priorities and deadlines.
Success Measures
- On‑time implementation of approved changes with minimal disruption.
- Accurate ERP Item Master, Cost Master, and BOM data.
- Minimal inventory obsolescence attributable to change execution.
- Timely completion of validation activities.
- Up‑to‑date manufacturing and quality documentation.
- Clear and reliable change status reporting.
$90,000 - $110,000 a year
At Invinity Energy Systems, we are dedicated to providing equal employment opportunities to all individuals and practicing wage transparency to ensure fairness and equity. The salary for this position ranges from $90,000 to $110,000 per year and will be determined by a combination of the interview process, prior work experience, and educational background.
Invinity Energy Systems is small enough that every team member plays a critical role in our daily business, but large enough to participate in landmark clean energy projects around the world. With its exposure to our most impactful emerging products, this role will be critical in us delivering on those opportunities. If you are great at what you do, willing to engage with our dedicated, collaborative culture, and motivated by taking on and delivering against some of the biggest opportunities in energy today, we'd love to hear from you.
We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.
Salario y beneficios
Sobre este empleo
Sobre Invinity Energy Systems
Resumen de la empresa
Invinity Energy Systems plc, cotizada en el AIM de Londres, con el National Wealth Fund como principal accionista
Londres, Reino Unido
2020
unos 160 empleados y una facturación de 8,2 millones de libras en 2025
A qué se dedica
Invinity Energy Systems nació en 2020 de la fusión de dos proveedores de baterías de flujo, redT energy y Avalon Battery. Es un fabricante global de baterías de flujo de vanadio, una alternativa al ion-litio para el almacenamiento de energía estacionario. Sus baterías son totalmente reciclables, no se incendian y no contienen tierras raras ni minerales de conflicto como el cobalto, y la empresa las diseña para más de 30 años de ciclado continuo.
Sus productos son Endurium para aplicaciones a gran escala y Endurium Enterprise para clientes comerciales e industriales. Endurium, lanzado en diciembre de 2024, escala de 3 MW a más de 100 MW y funciona de 4 a más de 18 horas sin límite de ciclos, mientras que Endurium Enterprise atiende a clientes que necesitan de 1 a 20 MW. Según la empresa, sus sistemas operan en casi 100 emplazamientos de más de 17 países.
Invinity se presenta como el mayor fabricante británico de almacenamiento de energía a escala de red, con diseño, ingeniería, fabricación y montaje en sus plantas del Central Belt de Escocia. Su planta de Vancouver es un centro clave de fabricación, ingeniería y operaciones y, tras su ampliación en junio de 2023, podía producir hasta 200 MWh de baterías al año. La empresa también está ampliando su cadena de suministro y su capacidad de producción en Estados Unidos, el Reino Unido, Canadá y China.
En Estados Unidos opera a través de Invinity Energy Systems (US) Corporation, con sede en Vista, California, y prevé la producción de stacks, el montaje de módulos y la integración de sistemas en las instalaciones californianas de un socio, donde dos líneas de stacks previstas deben producir más de 1 GWh de baterías Endurium al año.
Jonathan Marren fue nombrado consejero delegado en septiembre de 2024, tras haber sido director financiero y director de desarrollo. Matt Harper, cofundador de Avalon Battery, pasó a ser director comercial en abril de 2020 y asumió además el cargo de presidente en 2024.
Proyectos y trayectoria
Invinity entregó una batería de 2 MW / 5 MWh formada por 27 baterías de flujo VS3 al Energy Superhub Oxford, en Cowley, entonces la mayor batería de flujo del Reino Unido, en el centro de un sistema híbrido de ion-litio y flujo de vanadio de 50 MW en total. En la isla de Eday, en las Orcadas, instaló una batería de flujo de 1,8 MWh en la instalación de investigación de hidrógeno de EMEC, el primer sistema del mundo que integra energía mareomotriz, almacenamiento en baterías de flujo de vanadio y producción de hidrógeno.
En Alberta, Invinity entregó una batería de 8,4 MWh, la mayor de su tipo en Canadá, para la planta solar con almacenamiento de Chappice Lake, desarrollada por Elemental Energy y participada por la Primera Nación de Cold Lake; su planta solar de 21 MWp y la batería se terminaron en la primavera de 2023. Cerca de San Diego, puso en marcha un sistema VS3 de 10 MWh para la Viejas Tribe of Kumeyaay Indians, combinado con una marquesina solar de 15 MWp. Puesta en servicio por completo a finales de 2025, la batería había suministrado más de 1 GWh en octubre de 2026.
En East Sussex, Invinity ha entregado un sistema de 20,7 MWh para el Copwood VFB Energy Hub, que será la mayor batería de flujo de vanadio de Europa cuando entre en funcionamiento. Para el proyecto obtuvo la ayuda máxima de 10 millones de libras del Longer Duration Energy Storage Demonstration Competition del Gobierno británico, y la construcción del emplazamiento comenzó en noviembre de 2025.
Novedades
En mayo de 2026, FlexBase Group eligió a Invinity para diseñar una batería de flujo de vanadio de hasta 1,5 GWh para su Technology Centre Laufenburg, en Suiza, un campus tecnológico con un centro de datos de IA; FlexBase prevé ampliar la batería a 2,1 GWh en fases posteriores, y la fase de ingeniería se desarrollará durante 2026 y hasta 2027. En agosto de 2026, Invinity firmó un contrato EPC con Equans Switzerland, que se encargará de los trabajos mecánicos, eléctricos y de tuberías.
En junio de 2026, Pacific Steel Group eligió un sistema Invinity de 32 MWh, que será la mayor batería de flujo de vanadio de Norteamérica, para su acería Mojave Micro Mill en el condado de Kern, California, junto a una planta solar de más de 40 MWp. Invinity fabricará las baterías en Estados Unidos, y se espera que las entregas comiencen en el primer trimestre de 2027. En noviembre de 2026, la Soboba Band of Luiseño Indians asumió el control de una batería de Invinity integrada en una microrred solar que garantiza a su parque de bomberos, cerca de San Jacinto, California, al menos 10 horas de suministro de respaldo.
En agosto de 2026, la flota de la empresa superó los 10 GWh de energía suministrada a clientes, un acumulado un 85 % mayor que un año antes, y en noviembre ya superaba los 12 GWh. Ese mismo mes, Invinity aumentó un 50 % la capacidad energética de cada módulo Endurium, de 342 kWh a 516 kWh, con una potencia máxima de 125 kW. En septiembre de 2025 entró en el mercado indio con su socio estratégico Atri Energy Transition, para ofrecer baterías de flujo de vanadio fabricadas en la India.
Trabajar en la empresa
En 2025, Invinity empleaba una media de 87 personas en Canadá, 66 en el Reino Unido y 9 en Estados Unidos. Sus sedes principales están en Vancouver, Edimburgo, Londres y San Francisco, y sus baterías se montan en su planta de fabricación de Motherwell, Escocia.
Según su informe anual de 2025, todos los empleados fijos que cumplen los requisitos han recibido opciones sobre acciones, la empresa no tiene personal con contratos de cero horas y paga según el puesto y los estándares de salario digno, y se espera que una parte importante de los nuevos puestos incluya programas de aprendices y de recién titulados en fabricación, ingeniería mecánica y eléctrica y funciones de apoyo. Invinity aplica una política integral de igualdad de oportunidades.