Detalles del empleo
Overview
Grid & HV Project Manager Bucharest
Why this role matters
The position will be responsible for all the commercial and technical deliverables from project structuring through to technical handover on the Interconnection Works (MV Switchgear, HV substations and OHLs) for a dedicated Scatec project, or portfolio of linked projects. The position will build a strong relationship with EETC teams to move project Gerid Connection Agreements forward efficiently.
Lead the interfacing with EETC and other consultants on matters related to the interconnection of the renewable energy and process projects to the grid.
Lead the team in the drafting and review of relevant documents to ensure the technical requirement of the projects and Grid Connection Contracts are complied with.
The position will transition to lead the tendering, selection and execution of turnkey EPC substation deliveries on behalf of the Scatec project execution team. Throughout execution the position will be responsible for ensuring EETC compliant substations are delivered on time, connected to grid securing the necessary approvals from EETC.
What you'll be doing
Support to Structuring Phase of projects
- Lead the contracting and delivery of substation EPC packages including any early engineering and approvals processes.
- Monitoring and facilitating the review of the Contractors detailed design, ensuring compliance with Scatec functional requirements, site and permit and licensing conditions, local codes, EETC specifications and industry best practice
- Define and ensure that the project programme is reasonable and accurately considers the detailed Design Timeline, key equipment procurement and allowance for commissioning, testing and local Grid Connection requirements. Ensure that the grid connection and substation delivery timelines meet the overall renewable energy plant commissioning timeline.
- Manage and interface with contractors and equipment suppliers to establish, negotiate and align all technical aspects / approvals of the project.
- Manage the complete Utility interface process on behalf of Scatec from approval of detailed design, through construction, and completion under the Grid Connection Agreement / EPA
- Establish timelines and schedules based on the project schedule and contracts to ensure successful interconnection, commissioning, and grid code compliance.
- Assist the PM to establish and mitigate technical and commercial risks through an effective and updated Risk management system.
- Conduct site assessments accurately and timeously based on the information provided
- Support in evaluating the technical information and provide input to site selection and early phase project development and concept design amongst others
- Support in completing design packages related to the grid connections
- Lead in securing proper grid connection contracts and cascading back-to-back requirements to execution phase subcontracts - namely Substation EPC Contracting.
- Interface with EETC and other stakeholders to establish the project parameters and technical requirements
Support to projects in delivery/execution
- As the project moves into execution, the role is a continuation and development on the above:
- Manage and assess design change requests to be approved by the Lead Engineer and Senior Project Manager
- Manage, clarify and agree interfaces towards the grid and the grid operator
- Management of Governmental/Public/Grid Operator Stakeholders with approval process related to technical and commercial documentation and permits, licenses, authorizations, concessions needed during the execution of the HV and TX scope until commercial operations
- Lead project meetings with contractors and utilities.
- Be on site / visit site on a regular basis to ensure that construction is being implemented as per the design, utility requirements and in line with relevant technical standards and desired quality.
- Manage EPC Contractors in the delivery of griud connections and substations, with integration to RE plants.
- Build a small and efficient team to supervise the delivery and construction of substations under EPC Contracts.
- Provide early warning to the Senior PM on any issues in the project that may influence connection dates or the quality of the final product
- Contribute to drafting the relevant project reports (Bi-weekly, monthly etc.).
- Establish the plant commissioning and utility compliance plans and procedures.
- Plan and manage the Grid Code Compliance tests on site.
- Support in project close out phase by preparing and gathering technical documents as needed to achieve TTO on time.
- Assist in establishing and evaluating quality expectations and documentation during construction.
- Represent Scatec in the Operating Committee and EETC activities w.r.t. deliverables for Grid Code compliance and COD.
- Ensure lessons learned are transferred between different project sites.
- Ensure designs are implemented based on the at least the following documents:
- Detailed Engineering Drawings and Specifications
- Supplier Equipment Manuals
- Lead contract management of subcontractors with the Scatec procurement team.
- Assist in testing and commissioning activities towards Commercial Operation Date
Lead the project close out phase towards taking over of subsrtations and energisation.What you'll bring:
- Degree in Electrical / Electronical or Electromechanical Engineering
- 7+ year of Project Engineering experience - Minimum 5 years' experience in construction projects with Sub Stations and Transmission Lines
- Previous experience on handling communication with local utility and other relevant authorities and stakeholders
- An excellent knowledge of MS Office
- Based in Country and able to travel to site frequently.
- Fluent in both English and Romanian
- Driver's License
- An excellent knowledge of MS Office Ideal:
- Project Management Certificate
- Commissioning and tests of High Voltage Networks and Sub-Stations
- Masters Degree in Engineering
As a general note, the position is not expected to be an expert in the detailed design of Grid Connections, or in Line design, but is expected to be well versed and understand core elements of the design philosophy of the plant.
Similarly, not expected to be a legal expert but should have a clear experience and understanding of how Contracts are executed.
What you'll gain
- Professional growth through ownership, exposure, and meaningful contribution from day one
- Hands-on experience in a role where the challenge is energising, fast-moving, meaningful, and built on learning through doing.
- Broader commercial understanding through close collaboration with cross-functional teams
- Stronger financial, performance, and decision-support skills in a real-world context
If you are motivated by analysis with purpose, commercial insight, and real operational impact, this could be a strong next step in your career.
What we offer
At Scatec, you will be part of a company with a clear and ambitious purpose, working on renewable energy solutions that make a lasting difference. You will gain responsibility early, learn from experienced colleagues, and build your capabilities in a business that offers global exposure, strong development opportunities, and meaningful work in the energy transition.
Scatec is an equal opportunity employer. All qualified applicants will receive consideration for employment based on merit, competence, and business needs.
We review applications on an ongoing basis.
Shall understand EETC grid connection approval, permitting, commissioning and contracting processes.
Sobre este empleo
Sobre Scatec
Resumen de la Empresa
Scatec ASA, un productor de energía y desarrollador de proyectos noruego que cotiza en bolsa en Euronext Oslo
SedeOslo, Noruega
Fundación2007
TamañoAproximadamente 750 empleados a nivel mundial (fuente: pitchbook.com). Ingresos de NOK 4.37 mil millones en 2024 (fuente: stockanalysis.com).
Qué Hacen
Scatec ASA se especializa en el desarrollo, construcción, propiedad y operación de activos energéticos a gran escala, con un enfoque principal en sistemas fotovoltaicos solares (PV) a escala de servicios públicos y soluciones de almacenamiento de energía en baterías. Con el tiempo, la empresa ha ampliado su cartera tecnológica para incluir energía hidroeléctrica y proyectos seleccionados de hidrógeno verde, integrando electrolizadores para apoyar iniciativas power-to-X (fuente: scatec.com). Su modelo de negocio combina activos operativos que generan EBITDA con una sólida cartera de proyectos en construcción o en cartera, abarcando múltiples continentes como Europa, África, América Latina y Asia (fuente: scatec.com). Scatec atiende a una base diversa de clientes que incluye gobiernos, empresas estatales de servicios públicos, compradores industriales y socios de financiamiento de proyectos, asegurando frecuentemente acuerdos de compra de energía a largo plazo (PPAs) que respaldan la economía de los proyectos (fuente: live.euronext.com). Su enfoque integrado como desarrollador-operador con una cartera global de varios gigavatios y una combinación de activos con flujo de caja operativo más proyectos en etapa de construcción los distingue en el sector de energías renovables (fuente: scatec.com).
Proyectos y Trayectoria
El portafolio de Scatec incluye algunos de los proyectos híbridos de solar y almacenamiento más grandes del mundo, como la planta Kenhardt en Sudáfrica, que combina 540 MW de solar fotovoltaica con 225 MW/1,140 MWh de almacenamiento en baterías, representando un hito significativo en activos integrados de energía renovable (fuente: scatec.com). Solo en Sudáfrica, la empresa opera 730 MW de activos solares y de almacenamiento con un interés económico del 49% (fuente: scatec.com). En Brasil, Scatec opera 693 MW de capacidad solar con un interés económico del 33% y ha iniciado la construcción del proyecto solar Urucuia de 142 MW, respaldado por un PPA de 10 años firmado con Statkraft Energia do Brasil (fuente: live.euronext.com). La cartera en Filipinas incluye 673 MW de activos hidroeléctricos y de almacenamiento con un interés económico del 50%, con proyectos avanzados de almacenamiento en baterías como Binga y Magat, cada uno con una capacidad de 56 MW/56 MWh (fuente: scatec.com). En Botswana, Scatec inició operaciones comerciales de una planta solar en marzo de 2025 y posee el activo solar Mmadinare Fase 1 en su portafolio operativo (fuente: live.euronext.com). La empresa también aseguró un contrato para un proyecto solar fotovoltaico de 288 MW y un proyecto de almacenamiento en baterías en Sudáfrica mediante licitaciones gubernamentales a finales de 2024 y mediados de 2025 respectivamente (fuente: live.euronext.com). En Egipto, Scatec firmó un histórico PPA de 25 años para un proyecto solar de 1.1 GW más almacenamiento en baterías de 100 MW/200 MWh y avanza en la iniciativa Egypt Green Hydrogen, que incluye 260 MW de capacidad solar y eólica junto con un electrolizador de 100 MW, con acuerdos de compra de amoníaco ya establecidos (fuente: zawya.com). En Túnez, la empresa comenzó la construcción de los proyectos solares Tozeur y Sidi Bouzid, con una participación del 51% en una inversión de 88 millones de dólares, respaldada por un PPA de 25 años (fuente: zawya.com). Esta cartera de proyectos geográficamente diversa subraya el crecimiento estratégico de Scatec en múltiples continentes (fuente: scatec.com).
Desarrollos Recientes
A lo largo de 2024 y 2025, Scatec ha anunciado de manera constante nuevos acuerdos de compra de energía, inicios de proyectos y hitos de operación comercial en mercados clave como Brasil, Sudáfrica, Túnez, Botswana y Egipto (fuente: live.euronext.com). Destacan el PPA de 142 MW en Brasil firmado en abril de 2024, el contrato solar de 288 MW en Sudáfrica en diciembre de 2024 y el PPA de 120 MW en Túnez en marzo de 2025 (fuente: live.euronext.com). En marzo de 2025, Scatec inició operaciones comerciales de una planta solar en Botswana y aseguró un PPA solar más almacenamiento con Egypt Aluminium, ampliando aún más su presencia en África (fuente: live.euronext.com). La empresa también ganó un proyecto de almacenamiento en baterías en Sudáfrica en mayo de 2025 y comenzó la construcción del proyecto solar más BESS en Egipto ese mismo mes (fuente: live.euronext.com). Además, Scatec obtuvo una subvención de 30 millones de euros del PtX Development Fund en octubre de 2024 para apoyar el proyecto Egypt Green Hydrogen, que avanzó hacia la decisión final de inversión en 2025 con un acuerdo de compra de amoníaco con Fertiglobe (fuente: mees.com). El informe anual de 2024 y las presentaciones para inversores de 2025 destacan una base creciente de activos operativos, una generación más sólida de EBITDA y un enfoque estratégico en tecnologías solares, de almacenamiento e hidrógeno (fuente: scatec.com).
Trabajar Allí
Scatec ofrece oportunidades profesionales en una amplia gama de funciones que incluyen desarrollo de proyectos, ingeniería, gestión de construcción, operaciones y mantenimiento, comercio y acceso a mercados, finanzas, legal, ESG e informes, adquisiciones y soporte corporativo, reflejando la complejidad de su modelo de negocio integrado de energías renovables (fuente: scatec.com). La empresa mantiene una presencia global con oficinas y sitios de proyectos en Oslo, Sudáfrica, Brasil, Filipinas, Egipto, Túnez y Botswana, ofreciendo oportunidades geográficas diversas para profesionales (fuente: scatec.com). Scatec enfatiza la diversidad en el liderazgo, con un 32% de los cargos directivos ocupados por mujeres al cuarto trimestre de 2025, y prioriza la seguridad, reportando una tasa de frecuencia de incidentes con tiempo perdido de 0.6 por millón de horas trabajadas, lo que indica una sólida cultura de seguridad y sistemas formales de gestión (fuente: marketscreener.com). La estructura internacional de tamaño medio de la empresa apoya roles tanto para profesionales experimentados en energía como para personal corporativo, fomentando un ambiente laboral dinámico e inclusivo (fuente: pitchbook.com).
Tus conexiones en LinkedIn
Consulta tus contactos en Scatec en LinkedIn y usa tu red al postularte.
Ver tus conexiones