Functieomschrijving
Control Engineer
Prenton
Starting salary from £53,280 - £66,600 per annum
At SP Energy Networks, we know people are central to building a better future, quicker and we are seeking new talent to join our team.
The Control Room manages the Distribution Network for 1.5 million customers across the SPM licence for Merseyside, Cheshire and North Wales. It is responsible for both Planned and Fault work and delivering excellent Customer Service.
The role of Control Engineer is shift based, located in Prenton and sits within Customer Service -reporting to the Senior Control Engineer.
In this role you will be responsible for the control and operation of the ScottishPower electrical networks under normal, outage and fault situations. This involves the management of safety, system integrity, customer service and co-ordination of system access while ensuring compliance with the ScottishPower Distribution Licence.
As SPEN transitions to bcome a DSO, this role offers an exciting opportunity to be part our future distribution network strategy ensuring exceptional customer, network security and access for flexible energy resources.
What you'll be doing
- Facilitate change necessary within Customer Services Delivery as the distribution network transitions to Net Zero.
- Work with new and existing generation partners to utilise flexibility service arrangements and Distribution Restart Zone partnerships.
- Reviewing and investigating system performance following major incidents and faults.
- Give advice and support as required on technical matters relating to the High Voltage network.
- Approve and Control all outage and network access requests ensuring risk to network and system security is minimised.
- Co-ordinate outage planning and liaison with internal/external third parties for all network activities.
- Manage customer service proactively and reactively as appropriate, to meet all customer service KPI's.
- Actively participate in business and organisational change such that the performance, productivity and service standards of the SPEN are maintained and/or improved.
- Implement Contingency & Emergency Plans, escalate significant incidents throughout the business as required.
- Complete all associated statutory reports and paperwork for Network incidents.
- Actively monitor CML outage reqests to minimise effect on system and targets.
- Actively support the provision of operational data such that operational IT systems are accurate.
- Be active in the improvement/development and introduction of new processes, procedures and initiatives.
- Take ownership in objectives to improve the safety and customer service culture across the shift team and operations business.
What you'll bring
- Ability to form strong working relationships across all EN business areas and at all levels
- Ability in dealing with major customers
- A proven aptitude for using and developing new IT solutions
- Ability to co-ordinate a broad range of complex tasks and requirements from different business areas and devise solutions.
- Working knowledge of key Energy Networks policies, procedures and working practices
- Takes responsibility and accountability for tasks and activities and contributes to the achievement of team goals by providing support, advice, encouragement and clear direction and coaching when appropriate.
- Interpretation of Asset data & post fault analysis of plant and equipment.
- Ability to define and document new processes for key strategic changes within the Control Room.
- Working knowledge of SPEN policies, procedures and working practices.
- Working knowledge of health, safety and environmental legislation.
- Developed negotiation, communication, influencing and staff management skills.
- Developed knowledge of transmission and/or distribution systems and outage planning
- Effective decision maker not inhibited by consultation with others when necessary or give lead as required.
To be successful in a role you will need to demonstrate as a minimum':
- HNC with relevant experience or Degree in Electrical Engineering would be preferable.
- Detailed distribution and/or network knowledge essential.
- High Voltage Operational experience ideally as a Senior Authorised Person required.
What's in it for you
As well as a competitive salary which is reviewed annually, you can also enjoy a number of other benefits. With our pension scheme, we'll double match your contribution up to a company contribution of 10%.
At ScottishPower, we believe it's the little things we do in life that make a big difference. From helping you look after your family's wellbeing, save for your future and take personal steps for climate action - our benefits are designed to help you do just that - so that you have everything you need to take care of your world - today and tomorrow. That's why our benefits include:
-
36 days annual leave
-
Holiday Purchase - perfect your work/life balance with extra annual leave
-
Share Schemes
-
Payroll Giving and Charity Matched Funding
-
Technology Vouchers - save more and spread the cost of your technology purchases
-
Electric Vehicle Schemes - to help you transition to green/clean driving
-
Cycle to Work scheme and Public Transport Season Ticket Loans
-
Healthcare benefit options including: Dental Insurance, Private Medical Insurance, Health Cash Plan and annual Health Assessments
-
Life Assurance (4x salary)
-
Access to Savesmart financial wellbeing support
-
Plus shopping, leisure, restaurant and gym discounts, and unique employee deals on travel insurance and more
Inclusion, diversity, and a social purpose are at the heart of everything we do. Together with our values, they bring us together into a stronger, more sustainable business with direct links to the communities we serve. It takes all kinds of people to build a large-scale business like ours, so whatever your background, you'll fit right in.
We are committed to providing reasonable support or adjustments in our recruiting processes for candidates with disabilities, long term conditions, mental health conditions, or who are neurodivergent or require pregnancy-related support.
Mobility
Please note that any applicant who is not a citizen of the country of the vacancy will be subject to compliance with the applicable immigration requirements to legally work in that country. If/when required, the Company will support the employee with the necessary Immigration requirements.
Salaris en voordelen
Over deze vacature
Over Scottish Power
Bedrijfsprofiel
Scottish Power Limited, een volledige dochteronderneming van Iberdrola
ongeveer 9.800 medewerkers (2025); omzet van 6.516 miljoen pond in 2025
Wat ze doen
ScottishPower is de houdstermaatschappij van een groep die elektriciteit opwekt, transporteert en distribueert en elektriciteit en gas levert, vooral in het Verenigd Koninkrijk, via drie divisies: Energy Networks, Renewable production en Customer business. Het was het eerste geïntegreerde energiebedrijf in het Verenigd Koninkrijk dat 100% van zijn elektriciteit uit hernieuwbare bronnen opwekte. De operationele holding Scottish Power UK plc werd op 1 april 1989 opgericht als South of Scotland Electricity plc en heet sinds 1 augustus 1989 Scottish Power plc.
Energy Networks beheert vier gereguleerde bedrijven voor transmissie en distributie van elektriciteit, waarvan de kabels, hoogspanningslijnen en onderstations ongeveer 5,9 miljoen aangesloten klanten bedienen in de Central Belt en het zuiden van Schotland, Cheshire, Merseyside, North Shropshire, Noord-Wales, Cumbria en Lancashire. SP Transmission is eigenaar van het transmissienet, en de andere drie bedrijven, waaronder Electricity North West, zijn distributienetbeheerders. Daarmee is ScottishPower de op een na grootste distributienetbeheerder van het Verenigd Koninkrijk en levert het elektriciteit aan ongeveer 12 miljoen mensen via meer dan 170.000 kilometer net.
Customer business leverde eind 2025 gas en elektriciteit aan 4,2 miljoen klanten. De divisie installeert ook warmtepompen, zonnepanelen, batterijopslag en laadpunten voor elektrische auto’s, met speciale tarieven voor warmtepompen en het laden van elektrische auto’s en het eerste landelijke jaarlijkse onderhoudsplan voor warmtepompen in het Verenigd Koninkrijk.
Projecten en ervaring
Renewable production ontwikkelt, bouwt en exploiteert installaties voor hernieuwbare energie, vooral windenergie op zee en op land. De divisie exploiteert meer dan 40 locaties op land en daarnaast de windparken op zee East Anglia One en West of Duddon Sands, samen 3 GW operationeel vermogen. East Anglia One is voor 60/40 in handen van ScottishPower en Bilbao Offshore Holding Limited, en West of Duddon Sands wordt samen met Orsted Schroders Greencoat geëxploiteerd.
Op land ging het vernieuwde windpark Hagshaw Hill (80 MW) op 31 oktober 2025 in commerciële exploitatie: 14 nieuwe turbines vervingen de oorspronkelijke 26, en de locatie heeft nu vijf keer haar oorspronkelijke opwekcapaciteit. De batterij Harestanes (50 MW) ging op 15 september 2025 in commerciële exploitatie, en het windpark Kilgallioch Extension (51 MW) in maart 2026, met negen extra turbines.
Op zee wordt East Anglia Three van 1,4 GW gebouwd op 69 kilometer voor de kust van Suffolk, met 95 turbines van Siemens Gamesa, als eerste Britse project voor offshore wind met wieken van 115 meter. De eerste turbine werd in april 2026 geplaatst, en het project van 4 miljard pond wordt 50/50 samen met Masdar geëxploiteerd sinds in juli 2025 een belang van 50% aan Masdar werd verkocht. Het converterstation op zee, het eerste van ScottishPower, is het grootste dat ooit binnen de Iberdrola-groep is gebouwd. East Anglia Two zit in de bouwfase, die loopt van 2026 tot 2028.
De Britse projectenportefeuille tot 2038 omvat ongeveer 3 GW wind op zee in de East Anglia-zone, de ScotWind-portefeuille van 5 GW met het drijvende MarramWind (3 GW) en het vastgefundeerde MachairWind (2 GW), en ongeveer 5 GW aan mogelijke projecten voor wind op land, zon en batterijen. Op het net gaat Eastern Green Link 1, ontwikkeld met National Grid Electricity Transmission, Torness in East Lothian verbinden met Hawthorn Pit in County Durham, en Siemens Energy is voorkeursbieder voor de twee HVDC-converterstations van Eastern Green Link 4.
Recente ontwikkelingen
Iberdrola presenteerde in september 2025 een strategisch plan van 58 miljard euro met het Verenigd Koninkrijk als belangrijkste investeringsbestemming, en ScottishPower investeert 24 miljard pond in vijf jaar tot 2028. In december 2025 keurde het eindbesluit van Ofgem de investeringsplannen van ScottishPower van 12 miljard pond voor het transmissienet in de periode 2026-2031 goed. In mei 2025 zegde het National Wealth Fund 600 miljoen pond toe voor de netversterking, als onderdeel van een financieringspakket van 1,35 miljard pond onder leiding van Bank of America dat zeven prioritaire transmissieprojecten ondersteunt.
In maart 2025 keurde de Competition and Markets Authority de overname van een belang van 88% in Electricity North West goed, en ongeveer 2.550 medewerkers daarvan kwamen in de loop van 2025 bij ScottishPower. In november 2025 kreeg ScottishPower Renewables via een transactie met Shell het volledige eigendom van het MarramWind-project.
Werken bij het bedrijf
ScottishPower heeft meer dan 1.000 nieuwe medewerkers verwelkomd sinds het in november 2024 groei van het personeelsbestand voor 2025 aankondigde. In september 2025 begon een recordaantal van 338 afgestudeerden en leerlingen, in functies van engineering tot cybersecurity en projectmanagement, van Glasgow tot Merseyside, Noord-Wales en Londen. In 2025 opende Energy Networks een nieuw kantoor in Edinburgh voor zijn transmissieteams, onder wie de teams die onderzeese verbindingen voor de oost- en westkust van Schotland aanleggen, en de groep werd door het Top Employers Institute erkend als 2025 Top Employer.
Veel functies bieden hybride werken. Het familieverlof omvat 26 weken volledig loon bij zwangerschaps- en adoptieverlof en 8 weken volledig loon bij vaderschapsverlof, en via het programma ‘Your ScottishPower Benefits’ kiezen medewerkers voordelen als het Share Incentive Plan, de Cycle to Work-regeling of het kopen van extra vakantiedagen.