Descrição da função
At Canadian Solar, our vision is to make lives better by bringing electricity powered by the sun to millions of people worldwide. As a leading manufacturer of solar panels, inverters, and energy storage solutions, we've been an industry front-runner since our founding in 2001. Our commitment to sustainability is reflected in all parts of our organization as we navigate the complexities of a booming industry.
Throughout Canadian Solar's subsidiaries, e-Storage, Recurrent Energy, MSS and CSI Solar Co., we invest in our employees' growth. Our training programs and promotional opportunities ensure we all can continue to learn. We understand the importance of work-life balance and provide various flexible work options to support our employees' well-being. Join our team to "Make the Difference" by creating a lasting positive impact on the world and the communities where we operate.
Purpose
Acts as the regional senior technical specialist for power systems and product commissioning across the UK BESS fleet. Leads product commissioning of e-STORAGE products (SolBank, string inverters, MVSkids etc) to OEM standard, leads HV/MV maintenance and safety activities across e-STORAGE and third-party fleets (i.e. SMA, Power Electronics) and develops the competency of the wider service team to support HV/MV works.
Scope Definition: Product Commissioning
This role leads product commissioning of e-STORAGE products: commissioning of e-STORAGE power conversion and MV equipment to OEM standard, including first power-on initialization parameters, product-level testing, and return-to-service. The site Commissioning (Cx) team retains overall site and project commissioning ownership, including the energisation programme, grid compliance and G99 testing, punch lists, and client handover. The Power Systems Technician works within the site Cx team's sequence: the Cx team owns the programme and the date; Power Systems owns the product Cx, safety documents, and product-level sign-off within it.
MV/HV Authorisation & Control of Work
Control of work and HV authorisation are determined by contract and project phase:
- During commissioning, the EPC (or Principal Contractor) is responsible for site control of work and HV authorisation. This role operates within the EPC's safe system of work and provides product-level expertise.
- During LTSA operations, the HV authorisation and control-of-work model is defined in each contract and varies by site (client-appointed, third-party, or CSE-held). This role provides the trained, competent personnel for appointment where CSE holds or is delegated that responsibility.
- Where a third party holds HV authorisation for a site, this role coordinates, supervises interfaces, and delivers the product-level technical work within their control regime.
Key Responsibilities
Product Commissioning (e-STORAGE products)
- Lead product commissioning of e-STORAGE products across UK LTSA sites (SolBank, string inverters, MVSkids and associated MV plant) to OEM standard and project scope.
- Own and set first power-on initialization parameters (OEM-trained personnel requirement per product manuals); incorrect settings risk equipment damage and certification non-compliance.
- Own product commissioning standards, procedures, test records, and documentation packs; ensure consistency across all UK projects.
- Provide product-level technical support to the site Cx team during energisation.
- Support the site Cx team during SAT and witness testing; provide product-level technical sign-off.
HV/MV Operations & Safety
- Competent for appointment to carry out MV/HV isolations, earthing, and safety document duties under the prevailing site safe system of work, as a mandatory precursor to intrusive PM/CM works. Site HV authorisation arrangements are defined per contract and phase (see MV/HV Authorisation & Control of Work).
- Carry out operational HV/MV switching during the service phase, including switching for planned PM outages, CM interventions, and restoration on return to service, where CSE holds control of work under the contract.
- Provide HV/MV support to the service team during PM and CM activities: isolations, earthing, switching, and safe access where service team work interfaces with HV/MV plant.
- Lead HV/MV preventative maintenance across CSE, SMA and Power Electronics MV skids, RMUs, transformers, and protection systems per OEM schedules.
- Lead corrective maintenance and fault investigation on HV/MV equipment: root cause analysis, rectification and return to service.
- Provide safety leadership and oversight for all HV/MV activities in region, including supervision of third-party HV contractors where used.
Technical Expertise & Capability Building
- Subject-matter expert across all inverter platforms (CSE string inverters, SMA, Power Electronics) for HV/MV maintenance activities; product commissioning expertise applies to e-STORAGE products.
- Assess and develop service team competency for HV/MV support roles; deliver toolbox talks, training, and authorisation recommendations.
- Feed field learnings back into standards, RAMS/SOPs, and OEM escalations.
Requirements
- Trained and competent for MV/HV activities to 33kV; capable of appointment under company or client operational rules as contracts require.
- Time-served electrical background with utility-scale BESS or solar commissioning experience.
- Working knowledge of MV switchgear, transformers, and protection systems.
- Familiarity with G99 requirements sufficient to support the site Cx team during compliance testing.
- Full UK driving licence; regional and occasional national travel.
Salário habitual em funções semelhantes
EstimativaA metade central dos salários anunciados no Rejobs neste grupo nos últimos 24 meses. Este empregador não indicou salário.
Sobre esta vaga
Sobre Canadian Solar
Visão geral da empresa
Canadian Solar Inc., cotada no Nasdaq desde 2006
Kitchener, Canadá
2001
Cerca de 12.600 trabalhadores a tempo inteiro (final de 2025); receitas líquidas de 5,6 mil milhões de dólares em 2025
O que faz
A Canadian Solar fabrica módulos solares fotovoltaicos, fornece soluções solares e de armazenamento em baterias e desenvolve projetos solares e de armazenamento de grande escala. O seu segmento Manufacturing reúne a CS PowerTech, que fabrica e vende produtos solares e de armazenamento para o mercado norte-americano, e a CSI Solar, que serve todos os outros mercados. O segmento Recurrent Energy desenvolve e vende projetos solares e de armazenamento, presta serviços de operação e obtém receitas da eletricidade produzida pela sua carteira de centrais em exploração. A Canadian Solar detém cerca de 64% da CSI Solar, a sua principal subsidiária operacional na China.
Em 25 anos, a Canadian Solar entregou quase 180 GW de módulos solares em todo o mundo. O seu negócio de armazenamento, a e-STORAGE, tinha entregado mais de 23 GWh de armazenamento em baterias até 30 de junho de 2026 e tinha uma carteira de encomendas contratada de 3,5 mil milhões de dólares. No final de 2025, a Recurrent Energy geria cerca de 15 GW de projetos solares e de armazenamento ao abrigo de contratos de operação e manutenção.
Projetos e historial
Desde que entrou no desenvolvimento de projetos, em 2010, a Canadian Solar desenvolveu, construiu e ligou à rede cerca de 12,4 GWp de projetos solares e 6,4 GWh de projetos de armazenamento em baterias. A 30 de junho de 2026, a sua carteira de projetos em desenvolvimento somava cerca de 22 GWp de projetos solares e 84 GWh de armazenamento.
Na Califórnia, o Crimson Energy Storage Project, de 350 MW / 1.400 MWh, no condado de Riverside, está em funcionamento desde 2022 ao abrigo de dois contratos de armazenamento com empresas de eletricidade locais. No Arizona, o projeto Papago Storage, de 300 MW / 1.200 MWh, perto de Tonopah, está em operação comercial desde 2025 ao abrigo de um contrato de tolling de 20 anos.
Em Espanha, a central solar de Villameca, de 200 MWp, em Castela e Leão, entrou em operação comercial em outubro de 2026, juntando-se ao Rey Solar Project, de 426 MWp, recentemente inaugurado na Andaluzia. Na Austrália, o Carwarp Energy Park, de 150 MWac, perto de Mildura (Victoria), entrou em operação comercial em agosto de 2026, apoiado num contrato de compra de energia de longo prazo com a Microsoft.
Desenvolvimentos recentes
A Canadian Solar inaugurou a sua nova sede mundial em Kitchener, no Ontário, a 15 de janeiro de 2025. A 1 de dezembro de 2025, anunciou que iria retomar a supervisão direta das suas operações nos Estados Unidos, com uma participação de 75,1% na CS PowerTech, uma nova empresa comum com a CSI Solar. A 14 de maio de 2026, Colin Parkin tornou-se CEO, e o fundador Shawn Qu passou de presidente do conselho de administração e CEO para presidente executivo do conselho e diretor de tecnologia.
Em julho de 2026, a Canadian Solar abriu a primeira fase da sua fábrica de células solares HJT em Jeffersonville, no Indiana, com uma capacidade nominal de 2,1 GWp, a primeira fábrica de células HJT à escala comercial nos Estados Unidos. A sua fábrica de módulos de 5 GWp em Mesquite, no Texas, está a ser ampliada para 10 GWp, com conclusão prevista para o segundo semestre de 2026. No segundo trimestre de 2026, as suas entregas de módulos caíram 60% em termos homólogos, para 3,1 GW, enquanto as de armazenamento em baterias subiram 73%, para 3,7 GWh.
Em agosto de 2026, a Recurrent Energy fechou 695 milhões de dólares em financiamento de projeto e tax equity para o seu projeto Cobalt Solar, de 330 MW, no condado de Riverside, na Califórnia. Em outubro de 2026, vendeu dois projetos de armazenamento em baterias em França, Baixas e Coquainvilliers, de 100 MW / 400 MWh cada, à BW ESS.
Trabalhar na empresa
O quadro de pessoal a tempo inteiro da Canadian Solar passou de 22.234 pessoas no final de 2023 para 12.587 no final de 2025. Nessa data, 2.061 trabalhadores estavam nos Estados Unidos, 9.187 na Ásia-Pacífico, incluindo a China, e 1.339 na Europa e noutras regiões. O escritório de Kitchener acolhe a sede do grupo, a e-STORAGE e as unidades de vendas e serviços de módulos.
Na Europa, a Recurrent Energy tem escritórios em Milão, Madrid, Amesterdão, Varsóvia e Londres. Nos Estados Unidos, o plano 401(k) da Canadian Solar iguala a 100% os primeiros 5% das contribuições dos trabalhadores, e o pessoal de todos os níveis pode participar nos seus cursos e programas de formação, desde aulas presenciais e e-learning a coaching e mentoria.