Descrição da função
Location(s): Juno Beach, FL, US, 33408
Position Specific Description
The Engineering Construction & Supply Chain (ECSC) and FPL Transmission & Subtation team is seeking a Senior Engineer to lead the engineering and execution of complex, high-voltage substation projects. Serving as a Senior Project Engineer and technical lead, you will manage projects from scoping through construction and commissioning. This role combines advanced technical engineering with the oversight of internal stakeholders, external Engineers of Record (EORs), and suppliers.
Core Job Functions & Scope
-
Serve as the technical lead for complex, high-value substation projects through planning, engineering, procurement, construction, and closeout.
-
Give technical direction to external EORs and consultants, ensuring designs comply with company standards, interconnection requirements, and industry codes.
-
Lead reviews of engineering drawings, calculations, and specifications to resolve design, constructability, and interface issues.
-
Own major equipment procurement strategies, technical bid evaluations, vendor selections, and complex supplier problem-solving.
-
Lead engineering coordination across substation, transmission, protection/control, civil, and operations teams to clarify project interfaces.
-
Support the development and validation of project cost estimates, schedules, contracting strategies, and scope definitions.
-
Proactively identify engineering and execution risks to develop mitigation strategies that protect project safety, quality, cost, schedule, reliability, and operability.
-
Interpret and implement applicable interconnection requirements, facility studies, transmission requirements, and system studies within project designs.
-
Provide senior engineering support during construction by evaluating significant field changes, nonconformances, and design conflicts.
-
Ensure project closeout documentation accurately captures final designs, as-installed conditions, technical decisions, and lessons learned.
-
Mentor less experienced engineers and drive the development of systematic engineering standards, specifications, and organizational capabilities.
Position Expectations
-
Operate with high autonomy, exercising sound engineering judgment to resolve complex issues and serving as a technical resource for project teams.
-
Strengthen the broader engineering organization through mentorship, continuous improvement, and the application of lessons learned.
-
Maintain a steadfast focus on safety, quality, and timely project delivery, with a requirement for 25% travel and field support.
Preferred Requirements
-
Degree in Electrical, Mechanical, or Civil Engineering.
-
Professional Engineer (PE) license or EI/FE certification.
-
Extensive background in high-voltage substation design, construction, and commissioning.
-
Proven history leading multidisciplinary utility projects and managing external EORs.
-
Advanced experience with major equipment procurement, technical bid evaluations, and utility codes (IEEE, NESC, ASCE).
-
Strong leadership, problem-solving, and communication skills to resolve complex technical issues independently.
Job Overview
Employees in this role apply diversified knowledge of engineering principles and practices to broad variety of assignments and related fields. This job is responsible for evaluating, selecting, and applying standard techniques, procedures, and criteria to perform tasks. This position conducts analysis on system performance and reliability strategy and provides recommendations.
Job Duties & Responsibilities
- Provides engineering, design and environmental support
- Tracks and reports on project negotiations and performance
- Delivers company standards, policies, training, and support of organization
- Prepares communications, presentations and provides support at meetings
- Formulates researches, and develops improvement measures
- Works with other departments within the organization to establish customer requirements and project costs
- Ability to meet attendance and storm duty requirements
- Ability to work extended hours
- Performs other job-related duties as assigned
Required Qualifications
- Valid Driver's License (NON CDL)
- Bachelor's degree in Engineering (non-Engineering Technology), OR
- Master's degree in Engineering, if the bachelor's degree is not in a pure engineering field.
- At least one degree (Bachelor's or Master's) must be from an ABET-accredited program.
- Experience: 5+ years post-Bachelor's degree in engineering
Preferred Qualifications
- Certified Professional Engineer (PE)
- Six Sigma Black Belt Certified
- Six Sigma Green Belt Certified
- Master's Degree
- Six Sigma Yellow Belt Certified
- Six Sigma Master Black Belt
NextEra Energy offers a wide range of benefits to support our employees and their eligible family members. Click here to learn more.
Employee Group: Exempt
Employee Type: Full Time
Job Category: Engineering
Organization: Florida Power & Light Company
Relocation Provided: No
NextEra Energy is an Equal Opportunity Employer. Qualified applicants are considered for employment without regard to race, color, age, national origin, religion, marital status, sex, sexual orientation, gender identity, gender expression, genetics, disability, protected veteran status or any other basis prohibited by law.
NextEra Energy provides reasonable accommodation in its application and selection process for qualified individuals, including accommodations related to compliance with conditional job offer requirements, consistent with federal, state, and local laws. Supporting medical or religious documentation will be required where applicable and permitted by applicable law. To request a reasonable accommodation, providing your name, telephone number and the best time for us to reach you.
NextEra Energy will not discharge or in any other manner discriminate against employees or applicants because they have inquired about, discussed, or disclosed their own pay or the pay of another employee or applicant. However, employees who have access to the compensation information of other employees or applicants as a part of their essential job functions cannot disclose the pay of other employees or applicants to individuals who do not otherwise have access to compensation information, unless the disclosure is (a) in response to a formal complaint or charge, (b) in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or (c) consistent with the contractor's legal duty to furnish information.
NextEra Energy does not accept any unsolicited resumes or referrals from any third-party recruiting firms or agencies. Please see our policy for more information.
Salário habitual em funções semelhantes
EstimativaA metade central dos salários anunciados no Rejobs neste grupo nos últimos 24 meses. Este empregador não indicou salário.
Sobre esta vaga
Sobre NextEra Energy
Visão geral da empresa
NextEra Energy, Inc., cotada na Bolsa de Nova Iorque (NYSE: NEE)
Juno Beach, Flórida, Estados Unidos
Cerca de 17.400 trabalhadores no final de 2025; receitas operacionais de 27,4 mil milhões de dólares em 2025
O que faz
No final de 2025, a NextEra Energy tinha cerca de 80 GW de capacidade líquida de produção e armazenamento. A sua empresa de eletricidade, a Florida Power & Light (FPL), começou a servir a Flórida em 1925 e é a maior empresa de eletricidade da Flórida e dos Estados Unidos, servindo cerca de 12 milhões de pessoas através de mais de 6 milhões de contas de clientes. A FPL explora 120 centrais solares na Flórida, com cerca de 8.826 MW de capacidade, que descreve como a maior carteira solar à escala industrial dos Estados Unidos.
A NextEra Energy Resources (NEER) desenvolve, constrói e explora instalações de produção com contratos de longo prazo, incluindo renováveis, nuclear e gás natural, bem como instalações de armazenamento em baterias. No final de 2025, tinha cerca de 37.505 MW de capacidade líquida de produção em 44 estados norte-americanos e quatro províncias canadianas.
A sua capacidade eólica líquida era de cerca de 22.404 MW em 23 estados e quatro províncias e a capacidade solar líquida de cerca de 10.504 MW em 35 estados, a que se somavam cerca de 5.177 MW de armazenamento em baterias em 18 estados e uma província. A NEER e a FPL exploram sete reatores nucleares em quatro locais: Turkey Point e St Lucie na Flórida, Seabrook no New Hampshire e Point Beach no Wisconsin.
Projetos e historial
A Amite Solar, uma instalação de 100 MW em Tangipahoa Parish, entrou em operação comercial em março de 2025, sendo a primeira instalação energética à escala industrial da NEER na Luisiana. Em novembro de 2025, a NEER celebrou o início da operação do Appleseed Energy Center, uma central solar de 200 MW em Cass County, no Indiana. Em julho de 2026, juntamente com a Consumers Energy, celebrou o início da operação do Century Oaks Energy Center, uma instalação de armazenamento em baterias de 200 MW em Huron County, no Michigan.
Desenvolvimentos recentes
Em maio de 2026, a NextEra Energy e a Dominion Energy anunciaram a intenção de se fundirem numa operação exclusivamente em ações avaliada em cerca de 66,8 mil milhões de dólares; a empresa combinada operará sob o nome NextEra e manterá duas sedes corporativas, em Richmond (Virgínia) e em Juno Beach (Flórida). Os acionistas de ambas as empresas aprovaram a fusão em setembro de 2026. A operação continua sujeita a aprovações regulatórias e as empresas preveem concluí-la no segundo semestre de 2027.
Em dezembro de 2025, a NextEra Energy e a Google Cloud anunciaram uma parceria para desenvolver vários novos campus de centros de dados à escala do gigawatt, com a respetiva produção e capacidade; as duas empresas já tinham cerca de 3,5 GW em operação ou contratados. No mesmo mês, a NEER e a Meta atingiram cerca de 2,5 GW em contratos de energia limpa, através de 11 contratos de compra de energia e dois contratos de armazenamento, abrangendo 13 projetos com entrada em funcionamento prevista entre 2026 e 2028.
Em outubro de 2025, a Google e a NextEra Energy assinaram um contrato de 25 anos relativo à energia da central nuclear Duane Arnold, no Iowa. A NextEra Energy prevê reativar a central de 615 MW, situada em Linn County, o mais tardar no primeiro trimestre de 2029, sujeito a aprovações regulatórias, e em setembro de 2026 concluiu com o Departamento de Energia dos EUA um empréstimo de até 1,9 mil milhões de dólares para apoiar a reativação. Em agosto de 2026, assinou acordos definitivos com o Departamento de Comércio dos EUA e o Governo do Japão para financiar o desenvolvimento e a operação de até 10 GW de produção a gás natural no Texas e na Pensilvânia.
Trabalhar na empresa
O site de carreiras da NextEra Energy publica vagas em contabilidade e finanças, engenharia, tecnologias de informação, nuclear, distribuição de energia e produção de energia, para eletricistas de linhas e emendadores de cabos, e estágios para universitários. No final de 2025, a FPL tinha cerca de 9.400 trabalhadores, cerca de 30% dos quais representados pela International Brotherhood of Electrical Workers (IBEW). A NEER tinha cerca de 7.900 trabalhadores.