Stillingsbeskrivelse
Peak Energy is wholly owned by Stonepeak, one of the world's largest alternative investment firms specializing in infrastructure and real assets, with over USD 84 billion in assets under management. This financial strength, combined with our deep local market relationships, allows us to optimize capital deployment into high-quality assets.
With over 300 MW of operating assets and 1 GW of projects in development across Japan, Korea, Australia, Taiwan, the Philippines, Thailand, Singapore and Indonesia. We are greenfield developers at heart, but we also partner flexibly with industrials, developers, and investors to accelerate delivery and scale impact.
Backed by Stonepeak, we combine the customer focus of a developer, the technical expertise of an EPC and the financial strength of a heavyweight institution - enabling clients to meet decarbonisation targets on time, on budget, and without risk of delivery failure.
Our clients can expect clean energy solutions delivered on time, on budget, and at scale - with no surprises. Let's partner together to support your sustainability journey.
Role Overview
As Senior Grid and Development Engineer, you will play a pivotal role in bringing utility-scale clean energy projects from concept to grid energization across the Philippines. You will lead early-stage grid connection assessments, challenge and validate system impact and facilities studies, and steer interconnection coordination with NGCP and distribution utilities through testing, commissioning, and CATC issuance. Working closely with project development, EPC, and external stakeholders, you will optimize substation and transmission line specifications, provide technical input to permitting and regulatory submissions, and stay ahead of evolving grid and market dynamics-using data-driven insights (including WESM analysis) to shape site selection and development strategy.
Responsibilities
- Conduct preliminary grid connection assessments and recommend optimal interconnection schemes; prepare concise grid assessment reports.
- Review System Impact and Facilities Studies to validate assumptions, identify constraints, and assess grid risks.
- Prepare and consolidate interconnection requirements with NGCP and DUs, and lead coordination through testing, commissioning, energization, and CATC issuance.
- Provide technical input for permitting and regulatory submissions.
- Monitor grid and energy sector developments and regulatory issuances from NGCP, DUs, DOE, ERC, and WESM. Extract and analyze WESM data to inform project development strategy and site selection decisions.
- Review and optimize electrical equipment specifications for substations and transmission lines to align with technical and commercial objectives.
- Support construction activities by reviewing detailed EPC designs and overseeing installation, testing, and commissioning of substation and transmission line works in accordance with project requirements, grid codes, and applicable standards.
- Coordinate technical interfaces with internal teams and external stakeholders and participate in project development meetings.
- Conduct site visits to pre-development, ongoing and operational projects to provide technical support and supervise contractor execution in line with approved designs and contract specifications.
Qualifications
- Bachelor's degree in electrical engineering, Licensed Electrical Engineer.
- At least 5 years of experience in the power industry, including exposure to substation, transmission line, and renewable energy projects.
- Sound understanding of grid connection processes, including coordination with NGCP and distribution utilities for permitting, interconnection applications, energization, and grid compliance testing.
- Working proficiency in AutoCAD and Microsoft Office applications, particularly Excel and Power Point.
- Background in power system analysis, substation and transmission line design.
- Good understanding of power system analysis tools such as PSS®E, ETAP, PLS-CADD, or equivalent software, with the ability to interpret study results and technical reports.
- Knowledgeable in QA/QC and HSE practices in construction environments.
Om stillingen
Om Peak Energy
Virksomhedsoversigt
Peak Energy (Peak Energy Development Pte Ltd.), helejet af Stonepeak
Singapore
Hvad de laver
Peak Energy, der fejrede sit toårsjubilæum i december 2025, udvikler, ejer og driver vedvarende energianlæg i Asien og Stillehavsområdet. Virksomheden har over 300 MW anlæg i drift og projekter på 2 GW under udvikling i en portefølje, der omfatter Japan, Korea, Australien, Taiwan, Filippinerne, Thailand og Singapore. Forretningsmodellerne dækker udvikling i stor skala, elkøbsaftaler (PPA'er) med anlæg uden for og på kundens egen matrikel samt energilagring til erhvervskunder.
Under sine kontrakter investerer Peak Energy 100 % af kapitalen til installation af solcelle- og batterisystemer og driver og vedligeholder dem derefter i hele kontraktperioden. Solcelleanlæggene omfatter tag-, carport-, jord- og flydende anlæg.
Projekter og erfaring
I Sydkorea omfatter Peak Energys anlæg i drift Shinan, et storskalaanlæg på 100 MW, og Jeollanam-do-2 med 74 MW og 22 MWh. Pr. oktober 2026 havde virksomheden over 200 MW i drift eller tæt på drift i Korea. I Australien omfatter projekterne Templers, et batteri på 291 MWh.
I januar 2026 indgik Holcim en langsigtet PPA med Peak Energy om et solcelleprojekt på 25 MWp ved selskabets cementfabrikker i Bacnotan, La Union (13 MWp), og Norzagaray, Bulacan (12 MWp), som forventes at producere omkring 40 GWh om året. I april 2026 satte JTEKT, en leverandør i Toyota-koncernen, en solcelle-carport på 2 MWp i drift i Kagawa i Japan under en 20-årig PPA med Peak Energy. I Filippinerne udvikler Peak Energy desuden et greenfield-solcelleprojekt på 65 MWp i provinsen Isabela på Luzon, som efter planen skal i kommerciel drift i første halvdel af 2027.
Seneste nyt
I marts 2026 købte Peak Energy en portefølje på næsten 10 MW i Singapore af Maiora Renewable Energy. I august 2026 indgik Singapore Institute of Management en 14-årig PPA om solceller på eget campus på Clementi Road.
Den 14. oktober 2026 lancerede Peak Energy og Vencore Rooftop Equity Fund (Hyundai Motor Securities) et joint venture, der skal udbrede vedvarende energi i bilindustriens leverandørkæde i Korea. Ved lanceringen havde joint venturet sikret fem projekter med Tier-1-leverandører til Hyundai Motor.
I oktober 2026 begyndte Peak Energys tagmonterede solcelleanlæg på 0,6 MWp på CLA Town Center Mall i Pagsanjan, Laguna, at levere strøm til centret til omkring 20 % under nettariffen, mens et taganlæg på 1 MWp til FCC Philippines i Laguna er under opførelse med forventet kommerciel drift i begyndelsen af 2027. I november 2026 oplyste Peak Energy, at virksomheden ifølge Bloomberg har projekter for 250 mio. USD i Sydkorea og yderligere projekter for 100 mio. USD, der går i gang i 2027.
At arbejde der
Peak Energy har kontorer i hele Asien: i Singapore, Bengaluru (Indien), Jakarta (Indonesien), Tokyo (Japan), Manila (Filippinerne), Seoul (Sydkorea), Taipei (Taiwan) og Bangkok (Thailand). Det japanske datterselskab Peak Energy Japan har 20 medarbejdere. Kandidater, der ikke finder en passende stilling, kan sende en uopfordret ansøgning, og virksomheden kontakter dem, når der opstår en mulighed.