Nordex

Installationstid Metodologiingeniør (m/w/d)

Bliv Installation Time Methodology Engineer hos Nordex i Rostock eller Madrid. Udvikl og vedligehold tidsestimeringsmetoder til vindmølleinstallationer, og sikr procesoptimering og digital kontinuitet. Få mulighed for professionel udvikling i en bæredygtig energivirksomhed.
Nordex
Nordex
Rostock, Tyskland Madrid, Spanien På stedet Fuldtid UTC+01:00 – UTC+02:00

Nordex

Virksomhedsoversigt

Navn

Nordex SE

Hovedkontor

Hamburg, Tyskland

Grundlagt

1985

Størrelse

Over 10.900 medarbejdere verden over (Kilde: linkedin.com). Omsætning på over 5,7 milliarder euro i 2023 (Kilde: renewable-energy-industry.com).

Hvad de gør

Nordex fokuserer udelukkende på onshore vindmøller i klassen 4 til 6 MW+. Virksomheden udvikler, producerer, installerer og vedligeholder disse møller gennem integrerede processer, der omfatter design, præcisionsingeniørarbejde, rotorblad- og tårnproduktion, logistik, nøglefærdig installation og fuld livscyklusvedligeholdelse (Kilde: windindustry-in-germany.com). Kerneplatformen Delta4000, der blev introduceret i 2017 med N149/4.X, tilbyder fleksible effektværdier (4-6 MW) og rotordiametre på op til 175 meter. Denne platform er optimeret til forskellige vindforhold og ekstreme klimaforhold (Kilde: nordex-online.com). Produkterne henvender sig til forskellige kundesegmenter, herunder forsyningsselskaber, uafhængige strømproducenter og borgervindprojekter, og tilbyder skræddersyede løsninger til stedbegrænsede eller netbegrænsede lokationer med livscyklus på op til 35 år.

Projekter & Resultater

I Tyskland har Nordex taget 8.653 MW onshore vindkraftanlæg i drift, med 4.946 MW under opførelse, herunder den første vindpark i Hamburg med N27/150-møller, der har været i drift i over 32 år (Kilde: nordex-online.com). En prototype af N175/6.X på et 179 m højt hybridtårn i Santow, Mecklenburg-Vorpommern, er i pre-serie, med installation i september 2025 og idriftsættelse mellem oktober 2025 og januar 2026 (Kilde: nordex-online.com). Globalt leverer Nordex over 52 GW installerede møller i 85% af markederne uden for Kina, med cirka 1 GW i Canada, der omfatter N163/5.X, N163/6.X og N175/6.X-koldklimamodeller (Kilde: windindustry-in-germany.com). Blandt hovedkunderne er Borgervind Hollich GmbH & Co. KG og Energieversorgung Mittelrhein (evm), der indgår langsigtede partnerskaber for nøglefærdige projekter og vedligeholdelse.

Aktuelle udviklinger

I de seneste to år har Nordex sikret sig betydelige kontrakter i Tyskland, herunder 107 MW repowering i Nordrhein-Westfalen for Borgervind Hollich med 12 N163/6.X på 164 m høje hybridtårne (Kilde: renewable-energy-industry.com). Andre kontrakter omfatter 21 MW fra BMR energy solutions til "Heinz"-stedet og 77 MW til vindparken Schneifelhøhe (Kilde: renewable-energy-industry.com). Blandt milepælene er idriftsættelsen af 2.202,2 MW i Tyskland i første halvdel af 2025 og introduktionen af serieproduktion af hybridtårne i april 2025 (Kilde: nordex-online.com). Fusionen med Acciona Windpower i 2016 forbliver en afgørende ekspansion, uden at der i de seneste kilder nævnes yderligere opkøb eller finansieringsrunder.

Arbejder der

Nordex beskæftiger over 10.900 medarbejdere inden for forskellige områder, herunder udvikling, produktion, projektledelse, installation, logistik, salg og service (Kilde: nordex-online.com). Virksomhedskulturen lægger vægt på decentrale regionale operationer for nærhed til kunderne og løbende træning for teknikere på globale standarder. Uddannelsen foregår gennem Nordex Academy, der omfatter GWO-certificeringer og praktisk træning på Delta4000-simulatorer (Kilde: nordex-online.com). Ansættelsen sker på lokationerne i Hamburg og Rostock samt i produktionsanlæg i flere lande, hvor efterspørgslen efter installations- og serviceteknikere i Nordrhein-Westfalen og Rheinland-Pfalz stiger (Kilde: renewable-energy-industry.com).


Sidst opdateret den feb. 23, 2026 | Rapporter et problem

Job Description

Develop, maintain, and implement the standardized time estimation methodology for Nordex installation processes. Ensures accurate, traceable, and scalable time calculations across all operational levels from steps and tasks to Road Maps, Phases, WTG and Wind Farm enabling digital continuity, planning accuracy, and process optimization across Global PM EPC and Operations.

Tasks

  • Develop, structure and update the Times Methodology, ensuring alignment with MTM based standards, Nordex information levels, and Nordex frameworks
  • Define, calculate and validate times at all process levels (Step Task RM Phase WTG WF), ensuring consistency, traceability and data integrity
  • Build and maintain the times database, including parameters, resources, prerequisites, weather thresholds and resource movements
  • Support the creation and synchronization of Road Maps (RMs), ensuring workload balancing, shift alignment, sequencing logic, and compliance with installation strategies
  • Collaborate with PM Technology, Tendering, IPT, Quality, HSE and other stakeholders to ensure full digital continuity across all NX systems
  • Analyze process data to identify improvement opportunities and contribute to standardization, efficiency gains, and methodology evolution
  • Provide expert guidance during pilot tests, rollouts and continuous improvement cycles for new Nordex methodologies
  • Ensure harmonization between documentation (Installation Manuals, tasks, steps) and time estimation processes within the "single source of truth" philosophy
  • Support system integration topics defining requirements, interfaces, and data flow
  • Contribute to the maturity process of installation methodologies, ensuring proper assumptions, parameter definitions and version development across all releases (V0 to Final)

Your Profile

  • Bachelor´s degree in Engineering or a related STEM field (Master´s degree is a plus)
  • Experience in process engineering, industrial engineering, or a related field. Understanding process optimization techniques, including methods and installation procedures
  • Experience in the wind industry or a similar manufacturing environment is preferred
  • Microsoft Office (Word, Excel, PowerPoint), MS Project; Methods Time Measurement (MTM); Process engineering; Process optimization; Workload balancing; Production KPIs; Data analysis (Excel advanced, Power BI), Python for process automation, SQL (queries, data modelling), Database management (SQL Server, PostgreSQL, MySQL), Data structures for industrial processes, API integration, VBA scripting (Excel/Office automation), Basic ETL workflows, PLM/ERP data handling, Version control (Git), JSON/XML data structuring, Knowledge of simulation or modelling tools (process simulation, discrete event modelling)
  • Proficiency in English (B2 level or higher) and Spanish is desirable
  • Availability to make short trips

Your Benefits

In addition to the opportunity to make our world a little more sustainable, we offer you:

*Some offers may vary by location

Nordex adheres to a policy of equal employment opportunity. All employment decisions are made without regard to religion, age, sex, color, national origin, handicap, or other protected class and are in full compliance with all federal and state laws.

Recruitment Fraud Notice: Please note that our People Attraction department will only contact you via official @nordex-online.com email addresses or authorized recruitment partners. You can find more information about our application process on our website.

Ansøg nu

Job udløbet?

Sig venligst til Nordex, at du fandt dette job på Rejobs. Det hjælper os med at vokse og få flere i arbejde inden for vedvarende energi.

Om rollen

12. august 2026

12. august 2026

Fuldtid

På stedet

Virksomhed

Vindenergi

Nordex

nordex-online.com

  •  Rostock, Tyskland
  •  Madrid, Spanien

Mid-level experience in process engineering or related field

UTC+01:00 – UTC+02:00