Snowy Hydro Limited

Senior projektingeniør – mekanisk

Bliv Senior Project Engineer - Mechanical hos Snowy Hydro i Cooma. Led komplekse mekaniske projekter, sikr sikkerhed og mentorering. Få flyttestøtte, bonus og hybridarbejde.

Snowy Hydro Limited

Virksomhedsoversigt

Navn

Snowy Hydro Limited

Hovedkontor

NSW, Australien

Grundlagt

1949

Størrelse

Ca. 1.000-5.000 ansatte (kilde: leadiq.com). Snowy Hydro er et 100% ejet Commonwealth-selskab uden offentlige indtægtsdata tilgængelige for 2023 eller senere.

Hvad de laver

Snowy Hydro's kernefokus er på pumpet hydroelektricitet, gasfyret spidslast, dieselspidslast samt kontrakterede vind- og solenergi. Virksomheden driver 16 kraftværker og én pumpestation, med en samlet genereringskapacitet på over 5.500 MW, der sendes til det nationale elmarked (kilde: snowyhydro.com.au). Snowy Mountains Hydroelektriske Anlæg, som er en væsentlig del af deres drift, omfatter ni hydroelektriske kraftværker og 16 dæmninger, der er forbundet af 145 km tunneler og 80 km akvædukter, primært beliggende i Kosciuszko Nationalpark. Derudover forvalter Snowy Hydro vandopbevaring og afledning under Snowy Water Licence til vanding af Murray- og Murrumbidgee-systemerne (kilde: wikipedia.org).

Projekter & Resultater

Snowy Hydro har en rig historie med bemærkelsesværdige projekter, herunder det oprindelige Snowy Mountains Hydroelektriske Anlæg, som blev færdiggjort i 1974 og leverede en samlet produktion på 3.740 MW fra syv kraftværker, såsom Guthega, der begyndte driften i 1955 (kilde: snowyhydro.com.au). Virksomheden driver også betydelige gasaktiver, herunder Colongra Kraftværk (667 MW, erhvervet i 2015), Laverton North (320 MW) og Latrobe Valley (300 MW) i Victoria, samt tre dieselstationer i South Australia med en samlet kapacitet på 136 MW (kilde: wikipedia.org). Aktuelt omfatter store projekter Snowy 2.0, som har til formål at forbinde Tantangara- og Talbingo-dæmningerne via en 27 km underjordisk tunnel og etablere en ny pumpet-hydrostation til 2.000 MW produktion og 175 timers opbevaring, med byggeriet der begyndte i 2019 (kilde: snowyhydro.com.au).

Seneste Udviklinger

I marts 2018 erhvervede den australske regering fuld ejerskab af Snowy Hydro ved at købe aktier fra New South Wales og Victoria, hvilket bekræftede virksomhedens status som et 100% ejet Commonwealth-foretagende (kilde: snowyhydro.com.au). Byggeriet af Snowy 2.0 er et betydeligt fremskridt i virksomhedens portefølje, der markerer det som et nation-building pumpet-hydroprojekt, der begyndte i 2019 (kilde: snowyhydro.com.au). Derudover har Snowy Hydro sikret kontrakter for over 1.000 MW fra ti vind- og solprojekter, hvilket forbedrer deres tilbud inden for vedvarende energi (kilde: leadiq.com).

At Arbejde Der

Snowy Hydro tilbyder en bred vifte af roller på tværs af forskellige afdelinger, herunder generation (hydro, gas, dieseloperationer), ingeniørarbejde, byggeri og detailservice gennem mærker som Red Energy og Lumo Energy. Virksomheden har også muligheder inden for støttefunktioner som IT, HR og finans, med ansættelser der finder sted på deres hovedkontor i Cooma, kontoret i Sydney og forskellige projektsteder i New South Wales og Victoria (kilde: leadiq.com). Virksomhedskulturen lægger vægt på samfundsstøtte og har en lang historie med at integrere en multikulturel arbejdsstyrke, hvor 65% af den oprindelige arbejdsstyrke var migranter fra over 30 nationer (kilde: nma.gov.au). Selvom specifikke fordele ikke er detaljeret i de tilgængelige kilder, er virksomheden kendt for sit engagement i kundeservice i topklasse gennem sine detailmærker (kilde: leadiq.com).


Sidst opdateret den feb. 23, 2026 | Rapporter et problem

Snowy Hydro is a dynamic, integrated energy business that has been providing on-demand, reliable energy to Australia for generations. Snowy Hydro owns and operates a powerful combination of generation assets, including the mighty Snowy Mountains Scheme, gas and diesel plants, and contracted wind and solar energy. We also provide electricity and gas to about 1.5 million retail customers through our retail brands Red Energy and Lumo Energy.

A full-time position exists for a Senior Project Engineer - Mechanical to join the Project Engineering Group. This role is based in Cooma, working a standard Monday to Friday roster with hybrid working arrangements that include a minimum of 3 days in an office or on-site.

We are pleased to offer relocation support to those looking to make the move to Cooma, NSW. This role does not offer a DIDO or FIFO accommodation arrangement.

About the position

Serving as a senior technical resource and the first escalation point within the Project Team, the Senior Project Engineer - Mechanical is responsible for the technical governance and delivery of complex mechanical engineering works supporting the delivery of major refurbishment projects across Snowy Hydro's existing assets. The role ensures that projects comply with technical specifications, design standards, performance criteria, and regulatory requirements. You will own major mechanical work packages, lead Safety in Design and design management for high-risk packages, and resolve complex technical conflicts before escalation. Additionally, you will integrate complex mechanical scopes into the project master plan while mentoring less experienced mechanical engineers, ensuring safety and risk management remain embedded as primary accountabilities.

Key Responsibilities

  • Author mechanical Scope of Service and Scope of Work to drive procurement across maintenance and refurbishment activities on existing assets.
  • Act as technical owner of major mechanical design packages (turbines, pumps, valves, piping, hydraulic and pneumatic controls, rotating equipment), leading design reviews and technical audits to ensure consultants prioritise safety, reliability, and maintainability.
  • Provide strategic oversight of the technical risk register for mechanical packages, focusing on mechanical risks.
  • Oversee and participate in Factory and Site Acceptance Tests (FAT/SAT) for mechanical elements; provide field engineering and commissioning guidance.
  • Lead mechanical discipline training and knowledge sharing through the SHL Knowledge Community; represent SHL in external technical forums; serve as primary technical mentor to Graduate and Project Engineers.

About the location

Cooma is a vibrant regional hub located just 80 minutes from Canberra in the heart of the Snowy Monaro region of New South Wales. As the gateway to the Snowy Mountains, Cooma offers an exceptional lifestyle with access to national parks, snowfields, and year-round outdoor recreation. Known for its scenic beauty, rich multicultural heritage, and welcoming community, Cooma provides a unique opportunity to balance career growth with the benefits of regional living.

About you

  • Bachelor's Degree in Mechanical Engineering (or equivalent with relevant experience) eligible for Engineers Australia membership; CPEng status or NER registration is highly preferred.
  • 8-15 years of mechanical engineering experience leading complex, large-scale plant replacement or refurbishment projects, ideally within power generation, heavy industrial, or utility sectors.
  • Strong knowledge of rotating plant (pumps, turbines, generators), auxiliary systems (piping, valves, filters), lifting gear, and hydromechanical infrastructure (spillway/tunnel gates, penstocks).
  • Sound knowledge of Quality, WHS, and Environmental policies, procedures, and standards; familiarity with WHS Act 2011 (NSW), Construction Design Management (CDM) principles.
  • Strong analytical skills with a proven ability to solve complex technical problems and communicate effectively across multidisciplinary teams, site teams, contractors, and stakeholders.

About our workforce

Diversity and inclusion is important to us. Snowy Hydro has a culture of decency and inclusion, with a commitment to the health and wellbeing of our people and a supportive environment to ensure that everyone - regardless of background - feels included and can succeed. At Snowy Hydro, we recognise that we are made stronger by the unique capabilities and qualities that each individual brings, and we believe in providing an environment that allows that uniqueness to thrive.

Snowy Hydro is proud to be an Equal Opportunity employer. We are committed to the values of Equal Employment Opportunity and provide accessibility accommodations to applicants with physical and/or mental disabilities. If you are interested in applying for a role with Snowy Hydro and are in need of accommodation or special assistance to navigate our website or to complete your application, please send an email with your request to the Snowy Hydro recruitment team at [email protected]

If this role sounds like you, apply now! Applications open until Tuesday 1st September unless filled prior so apply now!

A few of the benefits we provide:

  • An annual performance based bonus.
  • A range of parental leave options, including 30 weeks paid leave for primary carers and 10 weeks for non-primary.
  • We provide additional leave over and above the minimum National Employment Standards.
  • Family discounts on fitness, gyms, pools and leisure centres (location dependant).
  • A Service Award Program - employees reaching continuous employment anniversaries receive additional benefits.
  • An employee referral plan - good employees attract similar colleagues
  • Corporate clothing allowance.

Ansøg nu

Job udløbet?

Sig venligst til Snowy Hydro Limited, at du fandt dette job på Rejobs. Det hjælper os med at vokse og få flere i arbejde inden for vedvarende energi.

Om rollen

13. august 2026

19. august 2026

Fuldtid

Hybrid

Virksomhed

Solenergi, Vindenergi, Vandkraft

Snowy Hydro Limited

snowyhydro.com.au

  •  Cooma, Australien

8-15 years

UTC+10:00