Stillingsbeskrivelse
The purpose of the Hydro Plant Technician is to support the overall operation of the hydro-electric power plant and the associated water intakes to maximize the reliability and efficiency of the electrical generating system. Safety being front of mind is paramount to our success, as is a strong commitment to environmental and regulatory compliance.
Why Eagle Creek?
- A comprehensive benefits plan: Medical, Dental, Vision, HSA, FSA, Commuter benefits, Voluntary Life, 401(k) match.
- Eleven paid holidays per year, plus a competitive PTO schedule and time off to volunteer or give back to your community.
- Access to a company-funded Employee Assistance Program.
- Employee discounts through ADP LifeMart.
- Tuition Reimbursement as well as access to trainings & mentors for Career Progression and Personal Development.
What you'll do
- Conduct daily plant and intake inspections.
- Start and stop the generating units and auxiliary equipment per established procedures.
- Conduct safety inspections and monitor security systems, keeping accurate logs and reports.
- Operate heavy equipment as well as an assortment of hand and power tools including chain saws.
- Perform routine and preventive maintenance in support of the reliability of the plant.
- Work on a rotating schedule to cover weekend duty and holidays.
- Assist in developing plant safety procedures and JSA procedures.
- Respond to calls at all hours of the day to react to emergent plant issues.
- Coordinate and supervise contractors in the performance of their activities.
- Participate in any safety programs developed by the company.
What you'll need
- At least two years of related experience in a power plant or industrial setting highly preferred.
- An unwavering commitment to safety, both for ECRE employees and contractors and the public in general.
- Instrumentation and control system experience, including troubleshooting of PLC based control systems and general calibration of instrumentation devices preferred.
- Ability to communicate and report all downtime related events in a timely manner to the regional manager.
- Experience with basic industrial maintenance techniques preferred.
- The ability to maintain a valid driver's license.
- High school diploma or equivalent required.
- Vocational certificate or degree in Engineering or Physical Sciences preferred.
- Experience with Microsoft Office Suite (Teams, Word, Outlook, etc.) for use in business communication.
Physical Requirements
-
Ability to perform manual tasks including but not limited to:
- The operation of hand and power tools and the ability to lift at least 50 lbs.
- Being able to bend and maneuver in tight, cramped quarters.
- Ability to work in hot, noisy, and dark environments, often alone and isolated.
- Comfortability working at heights and around water.
- Ability to work with and wear respiratory protection.
- Reach with hands and arms above shoulder level and at shoulder level.
- Walk, stand, stoop, kneel, and bend for prolonged periods of time.
- Grip and manually manipulate, often in repetitive motion, items such as but not limited to hand tools and machine parts.
- Read and identify labels, gauges, dials, and indicators typically encountered in performing job duties.
-
Possess clear and effective verbal communication in all circumstances, including emergency situations and giving/receiving instructions over a radio.
Eagle Creek Hydro Operations, LLC is an equal opportunity employer
Typisk løn for lignende job
EstimatDen midterste halvdel af lønninger annonceret på Rejobs i denne gruppe de seneste 24 måneder. Arbejdsgiveren har ikke oplyst en løn.
Om stillingen
Om Eagle Creek Renewable Energy
Virksomhedsoversigt
Eagle Creek Renewable Energy, LLC, helejet af fonde forvaltet af Apollo Global Management
Hvad de laver
Eagle Creek Renewable Energy blev grundlagt for at opkøbe, forbedre og drive vandkraftværker, og i dag tæller flåden 85 vandkraftværker med en samlet kapacitet på 690 MW i 18 amerikanske delstater. Værkerne producerer næsten 2,7 mia. kWh el om året, nok til over 260.000 boliger. Af de 85 anlæg hører 84 under den amerikanske energitilsynsmyndighed Federal Energy Regulatory Commission (FERC), og selskabet har 22 sager om fornyelse af licenser i gang.
I 2024 udvidede Eagle Creek sin produktionsportefølje ved at købe Lightstar Renewables, som har en udviklingsportefølje på 1,3 GW. I Illinois arbejder Lightstar inden for tre forretningsområder: fællesskabssolceller, agrivoltaik og batterilagring.
Projekter og erfaring
Eagle Creek begyndte med Mongaup River-systemet med tre værker i staten New York og købte i 2012 North American Hydros portefølje i Midtvesten. Siden 2013 er selskabet vokset ved at købe værker i drift, delvist i drift og ude af drift, og det har istandsat og forbedret mere end 25 vandkraftturbiner, der var ude af drift.
Ontario Power Generation købte Eagle Creek i november 2018 og knap et år senere Cube Hydro, hvorefter de to selskaber blev lagt sammen under navnet Eagle Creek Renewable Energy. Cube Hydro havde i 2017 købt Yadkin River-systemet med fire værker i North Carolina, og Yadkin-projektet har en samlet kapacitet på 215 MW. I Vermont byggede Eagle Creek i 2016 et værk på 2.200 kW ved Ball Mountain-dæmningen og et på 900 kW ved Townshend-dæmningen.
Seneste nyt
Fonde forvaltet af Apollo Global Management købte Eagle Creek i januar 2026. I oktober 2026 indgik Eagle Creek et strategisk partnerskab med Relevate Power, hvor Eagle Creek driver Relevates portefølje af run-of-river-vandkraftværker, og de lokale driftsfolk, som Relevate havde ansat til porteføljen, kommer over til Eagle Creek.
I januar 2025 fik Eagle Creek endeligt tilskud på 2,8 mio. dollars fra det amerikanske energiministerium på plads til effektiviseringer på otte vandkraftværker i Virginia, West Virginia, Pennsylvania og Maine, som vil øge værkernes produktion med 3 til 24 %.
Lightstar markerede i september 2025 lanceringen af Plains Road-projektet, det første agrivoltaiske anlæg i forsyningsskala i staten New York. I august 2026 var selskabet en af kun tre udviklere, der fik betingede tilsagn i første runde af New Jerseys Dual-Use Solar Energy Pilot Program, i alt otte på omkring 27,3 MW. I november 2026 godkendte byrådet i Paxton en indlemmelsesaftale for Lightstars Baltimore Drive Solar Project, et fællesskabssolcelleanlæg på 4,95 MW AC i Ford County i Illinois.
At arbejde der
Ud over hovedkontoret i Bethesda, Maryland, har Eagle Creek kontorer i Florham Park (New Jersey), Badin (North Carolina) og Neshkoro (Wisconsin). I november 2026 havde jobportalen stillinger som operatør og tekniker på vandkraftværker i Michigan, New York og New Hampshire samt IT-stillinger i Badin. Desuden søgte selskabet en virksomhedsjurist i Bethesda, en forretningsudviklingsdirektør, miljø-, sundheds- og sikkerhedskoordinatorer til regionerne Midtvesten og Nordøst samt en energimanager og -trader.
Ifølge jobopslagene kan goderne omfatte syge-, tand- og øjenforsikring og arbejdsgiverbidrag til en 401(k)-pensionsordning samt HSA- og FSA-konti, transporttilskud, frivillig livsforsikring og helligdage og ferie, herunder fri til frivilligt arbejde i lokalsamfundet.