Stillingsbeskrivelse
Location(s): Juno Beach, FL, US, 33408
Position Specific Description
The Engineering Construction & Supply Chain (ECSC) and FPL Transmission & Subtation team is seeking a Senior Engineer to lead the engineering and execution of complex, high-voltage substation projects. Serving as a Senior Project Engineer and technical lead, you will manage projects from scoping through construction and commissioning. This role combines advanced technical engineering with the oversight of internal stakeholders, external Engineers of Record (EORs), and suppliers.
Core Job Functions & Scope
-
Serve as the technical lead for complex, high-value substation projects through planning, engineering, procurement, construction, and closeout.
-
Give technical direction to external EORs and consultants, ensuring designs comply with company standards, interconnection requirements, and industry codes.
-
Lead reviews of engineering drawings, calculations, and specifications to resolve design, constructability, and interface issues.
-
Own major equipment procurement strategies, technical bid evaluations, vendor selections, and complex supplier problem-solving.
-
Lead engineering coordination across substation, transmission, protection/control, civil, and operations teams to clarify project interfaces.
-
Support the development and validation of project cost estimates, schedules, contracting strategies, and scope definitions.
-
Proactively identify engineering and execution risks to develop mitigation strategies that protect project safety, quality, cost, schedule, reliability, and operability.
-
Interpret and implement applicable interconnection requirements, facility studies, transmission requirements, and system studies within project designs.
-
Provide senior engineering support during construction by evaluating significant field changes, nonconformances, and design conflicts.
-
Ensure project closeout documentation accurately captures final designs, as-installed conditions, technical decisions, and lessons learned.
-
Mentor less experienced engineers and drive the development of systematic engineering standards, specifications, and organizational capabilities.
Position Expectations
-
Operate with high autonomy, exercising sound engineering judgment to resolve complex issues and serving as a technical resource for project teams.
-
Strengthen the broader engineering organization through mentorship, continuous improvement, and the application of lessons learned.
-
Maintain a steadfast focus on safety, quality, and timely project delivery, with a requirement for 25% travel and field support.
Preferred Requirements
-
Degree in Electrical, Mechanical, or Civil Engineering.
-
Professional Engineer (PE) license or EI/FE certification.
-
Extensive background in high-voltage substation design, construction, and commissioning.
-
Proven history leading multidisciplinary utility projects and managing external EORs.
-
Advanced experience with major equipment procurement, technical bid evaluations, and utility codes (IEEE, NESC, ASCE).
-
Strong leadership, problem-solving, and communication skills to resolve complex technical issues independently.
Job Overview
Employees in this role apply diversified knowledge of engineering principles and practices to broad variety of assignments and related fields. This job is responsible for evaluating, selecting, and applying standard techniques, procedures, and criteria to perform tasks. This position conducts analysis on system performance and reliability strategy and provides recommendations.
Job Duties & Responsibilities
- Provides engineering, design and environmental support
- Tracks and reports on project negotiations and performance
- Delivers company standards, policies, training, and support of organization
- Prepares communications, presentations and provides support at meetings
- Formulates researches, and develops improvement measures
- Works with other departments within the organization to establish customer requirements and project costs
- Ability to meet attendance and storm duty requirements
- Ability to work extended hours
- Performs other job-related duties as assigned
Required Qualifications
- Valid Driver's License (NON CDL)
- Bachelor's degree in Engineering (non-Engineering Technology), OR
- Master's degree in Engineering, if the bachelor's degree is not in a pure engineering field.
- At least one degree (Bachelor's or Master's) must be from an ABET-accredited program.
- Experience: 5+ years post-Bachelor's degree in engineering
Preferred Qualifications
- Certified Professional Engineer (PE)
- Six Sigma Black Belt Certified
- Six Sigma Green Belt Certified
- Master's Degree
- Six Sigma Yellow Belt Certified
- Six Sigma Master Black Belt
NextEra Energy offers a wide range of benefits to support our employees and their eligible family members. Click here to learn more.
Employee Group: Exempt
Employee Type: Full Time
Job Category: Engineering
Organization: Florida Power & Light Company
Relocation Provided: No
NextEra Energy is an Equal Opportunity Employer. Qualified applicants are considered for employment without regard to race, color, age, national origin, religion, marital status, sex, sexual orientation, gender identity, gender expression, genetics, disability, protected veteran status or any other basis prohibited by law.
NextEra Energy provides reasonable accommodation in its application and selection process for qualified individuals, including accommodations related to compliance with conditional job offer requirements, consistent with federal, state, and local laws. Supporting medical or religious documentation will be required where applicable and permitted by applicable law. To request a reasonable accommodation, providing your name, telephone number and the best time for us to reach you.
NextEra Energy will not discharge or in any other manner discriminate against employees or applicants because they have inquired about, discussed, or disclosed their own pay or the pay of another employee or applicant. However, employees who have access to the compensation information of other employees or applicants as a part of their essential job functions cannot disclose the pay of other employees or applicants to individuals who do not otherwise have access to compensation information, unless the disclosure is (a) in response to a formal complaint or charge, (b) in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or (c) consistent with the contractor's legal duty to furnish information.
NextEra Energy does not accept any unsolicited resumes or referrals from any third-party recruiting firms or agencies. Please see our policy for more information.
Typisk løn for lignende job
EstimatDen midterste halvdel af lønninger annonceret på Rejobs i denne gruppe de seneste 24 måneder. Arbejdsgiveren har ikke oplyst en løn.
Om stillingen
Om NextEra Energy
Virksomhedsoversigt
NextEra Energy, Inc., børsnoteret på New York Stock Exchange (NYSE: NEE)
Juno Beach, Florida, USA
Ca. 17.400 medarbejdere ved udgangen af 2025; driftsindtægter på 27,4 mia. dollar i 2025
Hvad de laver
NextEra Energy havde ved udgangen af 2025 ca. 80 GW nettokapacitet til produktion og lagring. Forsyningsselskabet Florida Power & Light (FPL) begyndte at levere strøm i Florida i 1925 og er det største elselskab i Florida og USA; det forsyner ca. 12 millioner mennesker via mere end 6 millioner kundekonti. FPL driver 120 solcelleparker i Florida med en kapacitet på ca. 8.826 MW, som selskabet betegner som USA’s største portefølje af solenergi i forsyningsskala.
NextEra Energy Resources (NEER) udvikler, bygger og driver produktionsanlæg med langsigtede kontrakter, blandt andet inden for vedvarende energi, kernekraft og naturgas, samt batterilagre. Ved udgangen af 2025 havde NEER ca. 37.505 MW nettoproduktionskapacitet i 44 amerikanske delstater og fire canadiske provinser.
Nettokapaciteten inden for vind var ca. 22.404 MW i 23 delstater og fire provinser og inden for sol ca. 10.504 MW i 35 delstater, og dertil kom ca. 5.177 MW batterilagring i 18 delstater og én provins. NEER og FPL driver syv kernereaktorer på fire anlæg: Turkey Point og St Lucie i Florida, Seabrook i New Hampshire og Point Beach i Wisconsin.
Projekter og erfaring
Amite Solar, et anlæg på 100 MW i Tangipahoa Parish, gik i kommerciel drift i marts 2025 som NEER’s første energianlæg i forsyningsskala i Louisiana. I november 2025 fejrede NEER driftsstarten på Appleseed Energy Center, et solcelleanlæg på 200 MW i Cass County, Indiana. I juli 2026 fejrede selskabet sammen med Consumers Energy driftsstarten på Century Oaks Energy Center, et batterilager på 200 MW i Huron County, Michigan.
Seneste nyt
I maj 2026 annoncerede NextEra Energy og Dominion Energy planer om at fusionere i en ren aktietransaktion til en værdi af ca. 66,8 mia. dollar; det samlede selskab skal drives under navnet NextEra og have to hovedkontorer, i Richmond, Virginia, og Juno Beach, Florida. Aktionærerne i begge selskaber godkendte fusionen i september 2026. Handlen afventer stadig myndighedsgodkendelser, og selskaberne forventer at gennemføre den i andet halvår af 2027.
I december 2025 annoncerede NextEra Energy og Google Cloud et partnerskab om at udvikle flere nye datacentercampusser i gigawattskala med tilhørende produktion og kapacitet; de to selskaber havde allerede ca. 3,5 GW i drift eller under kontrakt. Samme måned nåede NEER og Meta op på ca. 2,5 GW kontrakter om ren energi gennem 11 elkøbsaftaler og to lageraftaler, fordelt på 13 projekter, der efter planen tages i drift mellem 2026 og 2028.
I oktober 2025 underskrev Google og NextEra Energy en 25-årig aftale om strømmen fra kernekraftværket Duane Arnold i Iowa. NextEra Energy planlægger at genstarte værket på 615 MW i Linn County senest i første kvartal af 2029, forudsat myndighedsgodkendelser, og indgik i september 2026 en endelig låneaftale med det amerikanske energiministerium på op til 1,9 mia. dollar til genstarten. I august 2026 indgik selskabet endelige aftaler med det amerikanske handelsministerium og Japans regering om at finansiere opførelse og drift af op til 10 GW gasfyret produktion i Texas og Pennsylvania.
At arbejde der
NextEra Energys karriereside viser job inden for regnskab og økonomi, ingeniørarbejde, IT, kernekraft, eldistribution og elproduktion, til linjemontører og kabelmontører samt praktikpladser for studerende. Ved udgangen af 2025 havde FPL ca. 9.400 medarbejdere, hvoraf ca. 30 % var repræsenteret af International Brotherhood of Electrical Workers (IBEW). NEER havde ca. 7.900 medarbejdere.