Stellenbeschreibung
This position is responsible for leading the planning, design, and coordination of safe, efficient drilling and workover operations. It is a lifecycle well engineering role supporting drilling activities across the Concept Select, Define, and Delivery stages of Ormat's Well Delivery Process, with occasional support for workover, well logging, and well testing operations.
Responsibilities include ownership of engineering design and operational program development and execution; coordination of regulatory approvals; management of well costs and budgets; and continuous improvement of well engineering standards, policies, and procedures. The role is accountable for managing technical and operational risks, supporting real-time execution, and ensuring alignment across cross-functional teams. Provide drilling engineering expertise to support Ormat Indonesia and its joint venture operations. Contribute technical input and advisory support to cross-functional teams, including Business Development (BD), KTPB, and other departments, for the evaluation of new business opportunities, technical due diligence, project assessments, and external stakeholder engagements.
Responsibilities
- Lead collaboration across project teams including subsurface, drilling operations, procurement, and permitting to ensure aligned well delivery.
- Prepare and own detailed well programs, engineering designs, and execution strategies.
- Perform and validate engineering analysis (hydraulics, torque & drag, casing design, cementing, etc.) ensuring technical integrity.
- Identify, quantify, and manage well risks; develop contingency plans and decision frameworks for critical operations.
- Establish goals, schedules, and performance targets for drilling activities and ensure delivery against plan.
- Provide real-time engineering support during drilling operations, including optimization and structured problem-solving.
- Own drilling budgets, cost forecasting, and expenditure control; approve invoices and manage financial performance.
- Lead post-well reviews, identify performance gaps, and implement lessons learned into future designs and standards.
- Develop, maintain, and improve drilling standards, best practices, and engineering guidelines.
- Act as contract holder for multiple service lines; define scopes of work, KPIs, and drive vendor performance.
- Evaluate and implement new drilling technologies and techniques to improve efficiency and outcomes.
- Ensure full compliance with regulatory, environmental, and safety requirements; support permitting strategy as needed.
- Leverage and improve digital tools and systems (e.g., RimBase, Corva, Landmark, dashboards) to enhance planning, execution, and reporting.
- Mentor junior engineers and contribute to development of team capability and culture.
- Communicate complex technical concepts, risks, and recommendations clearly to management and stakeholders.
- Develop technical scopes of work, specifications, and tender documents for drilling services contracts and drilling-related procurements. Provide technical support throughout the procurement cycle, including bid evaluations, technical clarifications, vendor assessments, and contract award recommendations in coordination with the Procurement team.
- Provide drilling engineering expertise to support Ormat Indonesia and its joint venture operations.
- Technical input and advisory support to cross-functional teams, including Business Development (BD), KTPB, and other departments, for the evaluation of new business opportunities, technical due diligence, project assessments, and external stakeholder engagements.
- Collaborate with the Well Delivery team to provide drilling engineering support through real-time operations monitoring, drilling parameter trend analysis, engineering validation, and implementation of continuous improvement initiatives to enhance drilling performance, efficiency, and operational reliability.
Requirements
- Bachelor's degree in Engineering required.
- 8-15 years of relevant drilling engineering experience, with demonstrated ownership of well planning and execution.
- 2-3 years of Geothermal drilling experience.
- Experience supporting full well lifecycle activities across planning, design, and execution phases (Concept Select, Define, Delivery).
- Strong understanding of drilling engineering fundamentals, including well design, hydraulics, torque & drag, casing, and cementing.
- Demonstrated ability to identify, assess, and manage operational and technical risks.
- Proven ability to lead cross-functional coordination and deliver well programs safely, on schedule, and within budget.
- Strong project management, organizational, and problem-solving skills with a sense of ownership and urgency.
- Ability to support real-time operations and provide structured troubleshooting and decision-making during critical activities.
- Strong communication skills with the ability to clearly present technical information, risks, and recommendations to peers and management.
- Proficiency in standard business software (Microsoft Word, Excel, PowerPoint) and ability to learn and apply drilling engineering tools and systems (e.g., RimBase).
- Experience with industry drilling software (e.g., Landmark WellPlan, WellCAT) is a plus.
- Well Control certification (IWCF or IADC) preferred.
- Ability to work in a fast-paced environment with periods of high operational intensity.
- Willingness and ability to travel domestically and internationally, including occasional weekend and holiday support.
- Must possess a valid driver's license with a driving record acceptable to ORMAT's Safe Driving policy.
- Must be able to communicate effectively in English to safely and efficiently perform job duties.
Über diese Stelle
Über Ormat Technologies
Unternehmensüberblick
Ormat Technologies, Inc., notiert an der New York Stock Exchange (NYSE: ORA)
Reno, Nevada, USA
1965
Rund 1.600 Beschäftigte (Ende 2025); Umsatz von 989,6 Mio. US-Dollar im Jahr 2025
Tätigkeitsfeld
Ormat ist ein Geothermieunternehmen, das Geothermie- und Abwärmekraftwerke (Recovered Energy Generation, REG) besitzt, betreibt, entwirft, herstellt und verkauft, vor allem auf Basis seines Ormat Energy Converter, einer Einheit, die Wärme niedriger, mittlerer und hoher Temperatur in Strom umwandelt. Die von Ormat entwickelten, gefertigten und gebauten Kraftwerke, die das Unternehmen selbst besitzt oder für Versorger und Projektentwickler weltweit installiert hat, kommen zusammen auf rund 3.600 MW Bruttoleistung. Das aktuelle Erzeugungsportfolio umfasst 1.853 MW: 1.358 MW in Geothermie- und Solaranlagen in den USA, Kenia, Guatemala, Indonesien, Honduras, Guadeloupe und Dominica sowie 495 MW Energiespeicher in den USA.
Projekte und Referenzen
Im Dezember 2025 nahm Ormat Arrowleaf, seine erste hybride Solar-plus-Speicher-Anlage, mit 42 MW Solarleistung und 35 MW/140 MWh Speicher in den kommerziellen Betrieb. Im Januar 2026 erwarb das Unternehmen von Innergex Renewable Energy für 80,5 Mio. US-Dollar in bar seine zweite, die Anlage Hoku auf Big Island (Hawaii), die 30 MW Photovoltaik mit einer Batterie von 30 MW/120 MWh kombiniert. Im März 2026 ging der Batteriespeicher Shirk mit 80 MW/320 MWh in Visalia, Kalifornien, in den kommerziellen Betrieb.
Im Juli 2026 nahm Ormats Geothermiekraftwerk Dominica mit 10 MW den kommerziellen Betrieb auf, und im August 2026 beschloss das Unternehmen den Bau des Energiespeichers Denali mit 100 MW/400 MWh in Kalifornien, der bis Ende 2028 im Rahmen eines Tolling-Vertrags über 20 Jahre mit Clean Power Alliance in Betrieb gehen soll. Im August 2026 hatte Ormat Stromerzeugungsprojekte mit 202 MW in Bau und Entwicklung, alle durch langfristige Stromabnahmeverträge (PPAs) abgesichert, dazu Energiespeicherprojekte mit 497 MW/1.888 MWh.
Aktuelle Entwicklungen
Im Januar 2026 unterzeichnete Ormat einen PPA über 20 Jahre mit Switch für rund 13 MW geothermische Leistung zur Versorgung von Rechenzentren. Im Februar 2026 folgte ein langfristiger PPA mit NV Energy über bis zu 150 MW neue geothermische Leistung für Googles Betrieb in Nevada; die Projekte sollen zwischen 2028 und 2030 ans Netz gehen. Ormats Wachstumsplan sieht vor, die Kapazität vom Jahresende 2025 zu verdoppeln und bis Ende 2030 einen annualisierten Umsatz von über 1,5 Mrd. US-Dollar zu erreichen.
Zudem entwickelt Ormat Enhanced Geothermal Systems (EGS). Im Januar 2026 investierte das Unternehmen 25 Mio. US-Dollar in Sage Geosystems, und bei seinen zwei EGS-Pilotprogrammen mit SLB und Sage sollen die Bohrungen Ende 2026 oder Anfang 2027 beginnen. Nach Ormats Schätzung könnten seine EGS-Flächen von rund 170.000 Acres künftige EGS-Projekte mit 5 bis 6 GW tragen.
Im September 2026 wählte das US-Energieministerium Ormat für Fördermittel von bis zu 35 Mio. US-Dollar aus, gemeinsam mit SLB und der University of Utah, für EGS in Dixie Valley (Nevada) und die hydrothermale Erschließung in Cove Fort (Utah). Im Juni 2026 präsentierte Ormat den Ormega100, eine Binäreinheit, die 100 MW in einer einzigen Einheit liefert und für die hohen Temperaturen von EGS ausgelegt ist.
Arbeiten im Unternehmen
Ende 2025 beschäftigte Ormat 797 Menschen in den USA, 531 in Israel und 320 in anderen Ländern. Ein Großteil der obersten Führungsebene sowie die wichtigsten Produktions- und Fertigungsstätten des Produktsegments befinden sich in Israel. Im November 2026 schrieb Ormat auf seiner Karriereseite Stellen im Reservoir Engineering in Reno, Stellen für Anlagenfahrer in Fallon (Nevada) sowie für Betriebs- und Instandhaltungsingenieure in Philadelphia aus.