Stellenbeschreibung
Peak Energy is wholly owned by Stonepeak, one of the world's largest alternative investment firms specializing in infrastructure and real assets, with over USD 84 billion in assets under management. This financial strength, combined with our deep local market relationships, allows us to optimize capital deployment into high-quality assets.
With over 300 MW of operating assets and 1 GW of projects in development across Japan, Korea, Australia, Taiwan, the Philippines, Thailand, Singapore and Indonesia. We are greenfield developers at heart, but we also partner flexibly with industrials, developers, and investors to accelerate delivery and scale impact.
Backed by Stonepeak, we combine the customer focus of a developer, the technical expertise of an EPC and the financial strength of a heavyweight institution - enabling clients to meet decarbonisation targets on time, on budget, and without risk of delivery failure.
Our clients can expect clean energy solutions delivered on time, on budget, and at scale - with no surprises. Let's partner together to support your sustainability journey.
Role Overview
As Senior Grid and Development Engineer, you will play a pivotal role in bringing utility-scale clean energy projects from concept to grid energization across the Philippines. You will lead early-stage grid connection assessments, challenge and validate system impact and facilities studies, and steer interconnection coordination with NGCP and distribution utilities through testing, commissioning, and CATC issuance. Working closely with project development, EPC, and external stakeholders, you will optimize substation and transmission line specifications, provide technical input to permitting and regulatory submissions, and stay ahead of evolving grid and market dynamics-using data-driven insights (including WESM analysis) to shape site selection and development strategy.
Responsibilities
- Conduct preliminary grid connection assessments and recommend optimal interconnection schemes; prepare concise grid assessment reports.
- Review System Impact and Facilities Studies to validate assumptions, identify constraints, and assess grid risks.
- Prepare and consolidate interconnection requirements with NGCP and DUs, and lead coordination through testing, commissioning, energization, and CATC issuance.
- Provide technical input for permitting and regulatory submissions.
- Monitor grid and energy sector developments and regulatory issuances from NGCP, DUs, DOE, ERC, and WESM. Extract and analyze WESM data to inform project development strategy and site selection decisions.
- Review and optimize electrical equipment specifications for substations and transmission lines to align with technical and commercial objectives.
- Support construction activities by reviewing detailed EPC designs and overseeing installation, testing, and commissioning of substation and transmission line works in accordance with project requirements, grid codes, and applicable standards.
- Coordinate technical interfaces with internal teams and external stakeholders and participate in project development meetings.
- Conduct site visits to pre-development, ongoing and operational projects to provide technical support and supervise contractor execution in line with approved designs and contract specifications.
Qualifications
- Bachelor's degree in electrical engineering, Licensed Electrical Engineer.
- At least 5 years of experience in the power industry, including exposure to substation, transmission line, and renewable energy projects.
- Sound understanding of grid connection processes, including coordination with NGCP and distribution utilities for permitting, interconnection applications, energization, and grid compliance testing.
- Working proficiency in AutoCAD and Microsoft Office applications, particularly Excel and Power Point.
- Background in power system analysis, substation and transmission line design.
- Good understanding of power system analysis tools such as PSS®E, ETAP, PLS-CADD, or equivalent software, with the ability to interpret study results and technical reports.
- Knowledgeable in QA/QC and HSE practices in construction environments.
Über diese Stelle
Über Peak Energy
Unternehmensüberblick
Peak Energy (Peak Energy Development Pte Ltd.), vollständig im Besitz von Stonepeak
Singapur
Tätigkeitsfeld
Peak Energy, das im Dezember 2025 sein zweijähriges Jubiläum beging, entwickelt, besitzt und betreibt Anlagen für erneuerbare Energien im asiatisch-pazifischen Raum. Das Unternehmen verfügt über mehr als 300 MW an Anlagen in Betrieb und 2 GW an Projekten in Entwicklung, mit einem Portfolio in Japan, Korea, Australien, Taiwan, den Philippinen, Thailand und Singapur. Seine Geschäftsmodelle umfassen die Entwicklung von Großprojekten, Stromabnahmeverträge (PPAs) mit Anlagen außerhalb und auf dem Gelände der Kunden sowie Energiespeicher für Unternehmenskunden.
Im Rahmen seiner Verträge investiert Peak Energy 100 % des Kapitals, das für die Installation von Photovoltaik- und Batteriesystemen nötig ist, und betreibt und wartet diese anschließend über die gesamte Vertragslaufzeit. Zu seinen Solaranlagen gehören Dach-, Carport-, Freiflächen- und schwimmende Anlagen.
Projekte und Referenzen
In Südkorea gehören Shinan, ein Großkraftwerk mit 100 MW, und Jeollanam-do-2 mit 74 MW und 22 MWh zu den in Betrieb befindlichen Anlagen von Peak Energy. Im Oktober 2026 hatte das Unternehmen in Korea mehr als 200 MW in Betrieb oder kurz vor der Inbetriebnahme. In Australien gehört Templers, ein Batteriespeicher mit 291 MWh, zu seinen Projekten.
Im Januar 2026 unterzeichnete Holcim mit Peak Energy einen langfristigen PPA für ein Solarprojekt mit 25 MWp an seinen Zementwerken in Bacnotan, La Union (13 MWp), und Norzagaray, Bulacan (12 MWp), das jährlich rund 40 GWh erzeugen soll. Im April 2026 nahm JTEKT, ein Zulieferer der Toyota-Gruppe, einen Solar-Carport mit 2 MWp in Kagawa, Japan, in Betrieb, im Rahmen eines PPA mit Peak Energy über 20 Jahre. Auf den Philippinen entwickelt Peak Energy zudem ein Greenfield-Solarprojekt mit 65 MWp in der Provinz Isabela auf Luzon, dessen kommerzieller Betrieb für das erste Halbjahr 2027 geplant ist.
Aktuelle Entwicklungen
Im März 2026 übernahm Peak Energy ein Portfolio von fast 10 MW in Singapur von Maiora Renewable Energy. Im August 2026 unterzeichnete das Singapore Institute of Management einen PPA über 14 Jahre für Solarstrom vor Ort auf seinem Campus an der Clementi Road.
Am 14. Oktober 2026 gründeten Peak Energy und der Vencore Rooftop Equity Fund (Hyundai Motor Securities) ein Joint Venture, das Lösungen für erneuerbare Energie in der Automobil-Lieferkette in Korea ausbauen soll. Zum Start hatte das Joint Venture fünf Projekte mit Tier-1-Zulieferern von Hyundai Motor gesichert.
Im Oktober 2026 begann die Dachanlage von Peak Energy mit 0,6 MWp auf der CLA Town Center Mall in Pagsanjan, Laguna, das Einkaufszentrum mit Strom rund 20 % unter dem Netztarif zu versorgen, während eine Dachanlage mit 1 MWp für FCC Philippines in Laguna im Bau ist und Anfang 2027 den kommerziellen Betrieb aufnehmen soll. Im November 2026 berichtete Peak Energy, dass es laut Bloomberg Projekte im Wert von 250 Mio. US-Dollar in Südkorea hat und weitere Projekte für 100 Mio. US-Dollar 2027 anlaufen.
Arbeiten im Unternehmen
Peak Energy hat Büros in ganz Asien: in Singapur, Bengaluru (Indien), Jakarta (Indonesien), Tokio (Japan), Manila (Philippinen), Seoul (Südkorea), Taipeh (Taiwan) und Bangkok (Thailand). Die japanische Tochtergesellschaft Peak Energy Japan hat 20 Beschäftigte. Wer keine passende Stelle findet, kann eine Initiativbewerbung einreichen, und das Unternehmen meldet sich, sobald sich eine Gelegenheit ergibt.