Stellenbeschreibung
Position Specific Description
This position sits within the Power Generation Division which is responsible for all of NextEra Energy's non-nuclear generation operations, exceeding 40,000 megawatts (MW) of installed capacity. This position will be based in the Western/ Rochester, NY area. The intended employee will be responsible for the operation and maintenance of solar PV collection assemblies, battery energy storage, AC/DC inverters on multiple solar power plants to achieve safe, efficient, and environmentally sound plant operations.
In this role, an employee will maintain all tools, shops, vehicles, and all work locations in a safe and efficient condition, provide inspections of watch, electrical, mechanical, and electronic trouble shooting for a solar arrays and inverters.
Inspection is performed daily for fluid system breaches, mechanical component breakage or misalignment, and electrical component failures preventing inverters from producing grid power.
A candidate would be responsible for supporting teammates in nearby states in the region, and maintaining reliability, operations and maintenance for sites assigned area
Job Overview
The Site Technician will support the Regional Manager or designee to ensure the perfect execution of the PGD processes. Site Technicians in a solar region perform duties in the following but are not limited to safety, contractor management, electrical/electronic/mechanical equipment operation, troubleshooting, and maintenance, overall site operations, asset management and regulatory compliance, reliability engineering, and inventory management.
Job Duties & Responsibilities
- Reliability engineering
- Warranty management
- Operation and basic maintenance
- Electrical and power electronics troubleshooting and repairs
- Safety and Environmental program stewardship
- Supervisory duties of NEE employees and contractors
- Mechanical troubleshooting and repairs
- Business duties and Inventory management
- Heavy equipment operation
- Regulatory compliance
- Performs other job-related duties as assigned
Required Qualifications
- High School Grad / GED
- Experience: 3+ years
- Valid Driver's License (NON CDL)
Preferred Qualifications
- Trade School Graduate
- Licensed Electrician
- Licensed Master Electrician
- Six Sigma Yellow Belt Certified
The estimated base pay for this position is $72,800.00 to $109,200.00 per year. Starting pay will be based on several factors including, but not limited to, experience, qualifications, job-related and industry knowledge and skills and education/training.
NextEra Energy offers a wide range of benefits to support our employees and their eligible family members. Click here to learn more.
Employee Group: Non Exempt
Employee Type: Full Time
Job Category: Technicians - Wind/HV/Solar
Organization: NextEra Energy Operating Services, LLC
Relocation Provided: Yes, if applicable
NextEra Energy is an Equal Opportunity Employer. Qualified applicants are considered for employment without regard to race, color, age, national origin, religion, marital status, sex, sexual orientation, gender identity, gender expression, genetics, disability, protected veteran status or any other basis prohibited by law.
NextEra Energy provides reasonable accommodation in its application and selection process for qualified individuals, including accommodations related to compliance with conditional job offer requirements, consistent with federal, state, and local laws. Supporting medical or religious documentation will be required where applicable and permitted by applicable law. To request a reasonable accommodation, please send an e-mail, providing your name, telephone number and the best time for us to reach you.
NextEra Energy will not discharge or in any other manner discriminate against employees or applicants because they have inquired about, discussed, or disclosed their own pay or the pay of another employee or applicant. However, employees who have access to the compensation information of other employees or applicants as a part of their essential job functions cannot disclose the pay of other employees or applicants to individuals who do not otherwise have access to compensation information, unless the disclosure is (a) in response to a formal complaint or charge, (b) in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or (c) consistent with the contractor's legal duty to furnish information.
NextEra Energy does not accept any unsolicited resumes or referrals from any third-party recruiting firms or agencies. Please see our policy for more information.
Gehalt & Benefits
Über diese Stelle
Über NextEra Energy
Unternehmensüberblick
NextEra Energy, Inc., notiert an der New York Stock Exchange (NYSE: NEE)
Juno Beach, Florida, USA
Rund 17.400 Beschäftigte Ende 2025; Umsatzerlöse von 27,4 Mrd. US-Dollar im Jahr 2025
Tätigkeitsfeld
NextEra Energy verfügte Ende 2025 über rund 80 GW Netto-Erzeugungs- und Speicherkapazität. Die Versorgertochter Florida Power & Light (FPL) begann 1925 mit der Stromversorgung in Florida und ist der größte Stromversorger in Florida und den USA; sie beliefert rund 12 Millionen Menschen über mehr als 6 Millionen Kundenkonten. FPL betreibt in Florida 120 Solarkraftwerke mit rund 8.826 MW Leistung und bezeichnet dies als das größte Portfolio an Solar-Großkraftwerken in den USA.
NextEra Energy Resources (NEER) entwickelt, baut und betreibt Erzeugungsanlagen mit langfristigen Abnahmeverträgen, darunter erneuerbare Energien, Kernkraft und Erdgas, sowie Batteriespeicher. Ende 2025 verfügte NEER über rund 37.505 MW Netto-Erzeugungskapazität in 44 US-Bundesstaaten und vier kanadischen Provinzen.
Auf Windkraft entfielen netto rund 22.404 MW in 23 Bundesstaaten und vier Provinzen, auf Solarenergie netto rund 10.504 MW in 35 Bundesstaaten; hinzu kamen rund 5.177 MW Batteriespeicher in 18 Bundesstaaten und einer Provinz. NEER und FPL betreiben sieben Kernkraftwerksblöcke an vier Standorten: Turkey Point und St Lucie in Florida, Seabrook in New Hampshire und Point Beach in Wisconsin.
Projekte und Referenzen
Amite Solar, eine 100-MW-Anlage im Tangipahoa Parish, nahm im März 2025 den kommerziellen Betrieb auf und ist die erste Energieanlage im Kraftwerksmaßstab von NEER in Louisiana. Im November 2025 feierte NEER den Betriebsstart des Appleseed Energy Center, einer 200-MW-Solaranlage im Cass County, Indiana. Im Juli 2026 feierte das Unternehmen gemeinsam mit Consumers Energy den Betriebsstart des Century Oaks Energy Center, eines 200-MW-Batteriespeichers im Huron County, Michigan.
Aktuelle Entwicklungen
Im Mai 2026 kündigten NextEra Energy und Dominion Energy Pläne für einen Zusammenschluss in einer reinen Aktientransaktion im Wert von rund 66,8 Mrd. US-Dollar an; das fusionierte Unternehmen soll unter dem Namen NextEra auftreten und zwei Konzernzentralen in Richmond, Virginia, und Juno Beach, Florida, unterhalten. Die Aktionäre beider Unternehmen stimmten der Fusion im September 2026 zu. Die Transaktion steht noch unter dem Vorbehalt behördlicher Genehmigungen; die Unternehmen erwarten den Abschluss im zweiten Halbjahr 2027.
Im Dezember 2025 kündigten NextEra Energy und Google Cloud eine Partnerschaft an, um mehrere neue Rechenzentrums-Campus im Gigawatt-Maßstab samt zugehöriger Erzeugung und Kapazität zu entwickeln; beide Unternehmen hatten bereits rund 3,5 GW in Betrieb oder unter Vertrag. Im selben Monat erreichten NEER und Meta mit 11 Stromabnahmeverträgen und zwei Speicherverträgen rund 2,5 GW an Verträgen für saubere Energie, verteilt auf 13 Projekte, die zwischen 2026 und 2028 ans Netz gehen sollen.
Im Oktober 2025 unterzeichneten Google und NextEra Energy einen 25-jährigen Vertrag über den Strom des Kernkraftwerks Duane Arnold in Iowa. NextEra Energy will die 615-MW-Anlage im Linn County spätestens im ersten Quartal 2029 wieder in Betrieb nehmen, vorbehaltlich behördlicher Genehmigungen, und erreichte im September 2026 mit dem US-Energieministerium den Financial Close für ein Darlehen von bis zu 1,9 Mrd. US-Dollar zur Unterstützung des Neustarts. Im August 2026 unterzeichnete das Unternehmen mit dem US-Handelsministerium und der Regierung Japans endgültige Vereinbarungen zur Finanzierung von Bau und Betrieb von bis zu 10 GW Erdgaskraftwerken in Texas und Pennsylvania.
Arbeiten im Unternehmen
Die Karriereseite von NextEra Energy listet Stellen in Rechnungswesen und Finanzen, Ingenieurwesen, IT, Kernenergie, Stromnetz und Stromerzeugung, für Freileitungs- und Kabelmonteure sowie Praktika für Studierende. Ende 2025 hatte FPL rund 9.400 Beschäftigte, von denen rund 30 % von der International Brotherhood of Electrical Workers (IBEW) vertreten werden. NEER beschäftigte rund 7.900 Menschen.