Rejobs
Invinity Energy Systems
Invinity Energy Systems
6 open jobs · Posted 96 days ago

Project Manager

Join Invinity Energy Systems in Vancouver as a Project Manager overseeing utility-scale energy storage projects. Lead cross-functional teams to deliver projects on time and budget while ensuring customer satisfaction. Benefit from working on cutting-edge vanadium flow battery technology in a collaborative, impactful environment.

Salary
US$90,000–110,000/yr
Location
Vancouver, BC
Workplace
On-site
Job type
Full time
Applies on jobs.lever.co

Check your inbox.

On a phone? Apply from a computer later.

We are at the beginning of a global energy transformation of a scale not seen in generations. A future low-cost, low-carbon electric grid, serving a world that electrifies everything, is within our reach.

The last remaining gap is breaking the link between electricity supply and demand. The lowest-cost, most sustainable sources of energy today come from intermittent renewable generation; but our homes, businesses and industries need electricity at the flick of a switch.

That gap can be closed by energy storage: Devices that store electricity when it is plentiful, then provide power back to the grid when it is needed. Solutions, including ones using lithium-ion batteries, are being deployed in massive numbers to start filling this gap. But so far, none of those solutions have proven the ability to deliver power any time, anywhere, over decades of service: The level of reliability we've come to expect, and that the future grid will need.

This is the biggest challenge in energy today. Invinity is at the forefront of finding a solution. And we need you to help us deliver it.

Developed, manufactured and delivered by our teams in Canada and the UK, Invinity's vanadium flow batteries (or "VFBs") can be installed anywhere and consistently deliver electricity as needed over a service life exceeding 30 years. Moreover, Invinity's VFBs are highly recyclable, don't rely on rare or conflict minerals, and won't catch fire.

Invinity is a global VFB leader, with over 190 megawatt-hours of its batteries operational or in construction for over 82 projects across 15 countries - more than any other emerging energy storage provider. We've deployed the largest flow battery systems in the U.S., Canada, Australia, and the UK. Along the way we've earned financial support from the UK Infrastructure Bank, the U.S. Department of Energy, and some of the world's leading institutional investors.

The Project Manager is responsible for the successful delivery of utility-scale and commercial energy storage projects from contract award through commissioning and customer acceptance. Acting as the primary point of contact for customers throughout project execution, the Project Manager leads cross-functional teams to ensure projects are delivered safely, on schedule, within budget, and in accordance with contractual requirements.

This role requires strong leadership, communication, and organizational skills, combined with the ability to navigate complex technical, commercial, and operational challenges in a rapidly evolving energy industry.

Key Responsibilities

Project Delivery & Customer Management

  • Serve as the primary customer interface throughout the project lifecycle, building trusted relationships and ensuring a high level of customer satisfaction.
  • Lead project execution from initiation to close.
  • Ensure contractual obligations, customer requirements, and project objectives are clearly understood and achieved.
  • Manage customer expectations while maintaining alignment with company objectives and contractual commitments.

Scope, Cost & Schedule Management

  • Develop and manage detailed project schedules in collaboration with external and internal stakeholders and monitor project milestones and critical paths.
  • Monitor project financial performance, identify variances, and implement corrective actions when necessary.
  • Support revenue forecasting, change order management, and project reporting processes.
  • Identify, assess and escalate project risks throughout the execution lifecycle.
  • Manage scope changes, commercial impacts, and project contingencies while maintaining alignment with project objectives.
  • Understand project contracts, commercial terms, and key obligations.
  • Manage claims, and contractual correspondence in collaboration with commercial and legal teams.

Reporting & Governance

  • Prepare and deliver accurate project status reports highlighting schedule progress, budget performance, risks, opportunities, and key decisions.
  • Present project updates to senior leadership, customers, and project steering teams.
  • Ensure compliance with internal project management processes, governance requirements, and reporting standards.

Stakeholder Coordination

  • Facilitate effective communication across stakeholders via regular project meetings and documentation - tracking decisions, risks, action items, and commitments to completion.

Technical Leadership

  • Develop a working knowledge of grid-scale and commercial energy storage systems, balance-of-plant infrastructure, electrical systems, and site delivery requirements.
  • Collaborate closely with subject matter experts to resolve technical challenges and support customer discussions.

Continuous Improvement

  • Capture lessons learned and contribute to the ongoing enhancement of project delivery processes, tools, and best practices.
  • Promote a culture of accountability, collaboration, safety, and operational excellence.

Qualifications & Experience

Required

  • 2+ years of project management experience delivering complex technical, industrial, infrastructure, energy, or construction projects with multiple stakeholders
  • Strong financial acumen with experience managing project budgets, forecasts, and reporting.
  • Excellent communication, presentation, negotiation, and customer relationship management skills.
  • Proven ability to identify risks, solve problems, and drive projects to successful completion.

Preferred

  • Bachelor's degree in Engineering, Construction Management, Business, Project Management, or a related discipline.
  • Experience delivering energy or large-scale industrial projects ideally in the energy storage industry
  • Familiarity with EPC, design-build, or technology deployment environments.
  • PMP, PRINCE2, or equivalent project management certification.

$90,000 - $110,000 a year

At Invinity Energy Systems, we are dedicated to providing equal employment opportunities to all individuals and practicing wage transparency to ensure fairness and equity. The salary for this position ranges from $90,000 to $110,000 per year and will be determined by a combination of the interview process, prior work experience, and educational background.

Invinity Energy Systems is small enough that every team member plays a critical role in our daily business, but large enough to participate in landmark clean energy projects around the world. With its exposure to our most impactful emerging products, this role will be critical in us delivering on those opportunities. If you are great at what you do, willing to engage with our dedicated, collaborative culture, and motivated by taking on and delivering against some of the biggest opportunities in energy today, we'd love to hear from you.

We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.

Pay & benefits

US$90,000–110,000 /yr

About this role

Posted
25 Aug 2026
Sectors
Timezone
UTC-07:00
Experience
2+ years of project management experience

About Invinity Energy Systems

Company overview

Invinity Energy Systems plc, listed on AIM in London, with the National Wealth Fund as its largest shareholder

London, United Kingdom

2020

about 160 employees and revenue of £8.2 million in 2025

What they do

Invinity Energy Systems was created through the 2020 merger of two flow battery providers, redT energy and Avalon Battery. It is a global manufacturer of vanadium flow batteries, an alternative to lithium-ion for stationary energy storage. Its batteries are fully recyclable, do not catch fire and contain no rare earths or conflict materials such as cobalt, and the company rates them for more than 30 years of constant cycling.

Its products are Endurium for large-scale applications and Endurium Enterprise for commercial and industrial customers. Endurium, launched in December 2024, scales from 3 MW to more than 100 MW and runs for 4 to more than 18 hours without cycle limits, while Endurium Enterprise serves customers needing 1 to 20 MW. By the company’s account, its systems operate at nearly 100 sites in more than 17 countries.

Invinity describes itself as the UK’s largest manufacturer of grid-scale energy storage, with design, engineering, manufacturing and assembly at its facilities in Scotland’s Central Belt. Its Vancouver facility is a core manufacturing, engineering and operations hub, and after its expansion in June 2023 it could produce up to 200 MWh of batteries a year. The company is also expanding its supply chain and production capability in the US, the UK, Canada and China.

In the US it works through Invinity Energy Systems (US) Corporation, based in Vista, California, and plans stack production, module assembly and system integration at a partner’s California facilities, where two planned stack lines are to produce more than 1 GWh of Endurium batteries a year.

Jonathan Marren was appointed chief executive in September 2024, having previously been chief financial officer and chief development officer. Matt Harper, a co-founder of Avalon Battery, became chief commercial officer in April 2020 and added the role of President in 2024.

Projects and track record

Invinity delivered a 2 MW / 5 MWh battery of 27 VS3 flow batteries, then the UK’s largest flow battery, to Energy Superhub Oxford in Cowley, where it sits at the heart of a 50 MW hybrid lithium-ion and vanadium flow battery system. On the island of Eday in Orkney it installed a 1.8 MWh flow battery at EMEC’s hydrogen research facility, the first system worldwide to integrate tidal power, vanadium flow battery storage and hydrogen production.

In Alberta, Invinity delivered an 8.4 MWh battery, the largest of its type in Canada, for the Chappice Lake solar and storage plant, developed by Elemental Energy and part-owned by Cold Lake First Nations; its 21 MWp solar array and battery were completed in spring 2023. Near San Diego, it commissioned a 10 MWh VS3 system for the Viejas Tribe of Kumeyaay Indians, paired with a 15 MWp carport solar array. Fully commissioned in late 2025, the battery had delivered more than 1 GWh by October 2026.

In East Sussex, Invinity has delivered a 20.7 MWh system for the Copwood VFB Energy Hub, which will be Europe’s largest vanadium flow battery once operational. For the project it secured the maximum £10 million of grant funding from the UK Government’s Longer Duration Energy Storage Demonstration Competition, and construction of the site began in November 2025.

Recent developments

In May 2026 FlexBase Group selected Invinity to design a vanadium flow battery of up to 1.5 GWh for its Technology Centre Laufenburg in Switzerland, an AI data centre and technology campus; FlexBase plans to expand the battery to 2.1 GWh in later phases, and the engineering phase is expected to run through 2026 and into 2027. In August 2026 Invinity signed an EPC agreement with Equans Switzerland, which will provide the mechanical, electrical and piping works.

In June 2026 Pacific Steel Group selected a 32 MWh Invinity system, to be the largest vanadium flow battery in North America, for its Mojave Micro Mill in Kern County, California, alongside a solar array of over 40 MWp. Invinity will manufacture the batteries in the USA, with delivery expected to start in the first quarter of 2027. In November 2026 the Soboba Band of Luiseño Indians took over an Invinity battery in a solar microgrid that gives its fire station near San Jacinto, California, at least 10 hours of backup power.

In August 2026 the company’s fleet passed 10 GWh of energy dispatched to customers, with the cumulative total up 85% year on year, and by November it had passed 12 GWh. That month Invinity raised the energy capacity of each Endurium module by 50%, from 342 kWh to 516 kWh, with peak power of 125 kW. In September 2025 it entered the Indian market with its strategic partner Atri Energy Transition, offering vanadium flow batteries made in India.

Working there

In 2025 Invinity employed an average of 87 people in Canada, 66 in the UK and 9 in the USA. Its principal locations are Vancouver, Edinburgh, London and San Francisco, and its batteries are assembled at its manufacturing facility in Motherwell, Scotland.

According to its 2025 annual report, all eligible permanent employees have been granted share options, it employs no staff on zero-hours contracts and pays according to roles and living wage standards, and a significant proportion of new roles are expected to include apprenticeships and graduate schemes in manufacturing, mechanical and electrical engineering and business support. Invinity follows a comprehensive Equal Opportunities Policy.

More energy storage jobs like this

Project Manager
Invinity Energy Systems · US$90,000–110,000/yr