Detalles del empleo
The Contracts department plays a central role in turning design into successful project delivery. Working closely with commercial, design, procurement, and site teams, the department leads projects from mobilisation through to completion and handover. It is a fast-paced, collaborative environment where strong planning, leadership, and problem-solving skills are valued, and where the right person can make a visible impact on project success, client relationships, and the continued growth of the business.
Role Overview
We are seeking a proactive, commercially aware, and mechanically minded Contracts Manager to lead the delivery of decarbonisation and building upgrade projects across Ireland. This is a fantastic opportunity for an experienced project delivery professional who wants to take ownership of a diverse portfolio of mechanical-led works, develop strong client relationships, and contribute to meaningful low-carbon projects with a growing and ambitious business.
The successful candidate will work closely with our commercial project management team and in-house M&E design team to deliver a range of low-carbon and energy efficiency projects, including heating system upgrades, heat pump installations, plantroom and energy centre works, HVAC modifications, controls and BMS-related works, and wider building fabric improvement projects. With projects typically delivered in live commercial and public sector environments, this role offers real variety, autonomy, and the chance to work across the full project lifecycle from planning and coordination through to commissioning, handover, and client sign-off.
What You'll be Doing
This role is responsible for leading and supporting project delivery teams to ensure mechanical projects are completed safely, on time, within budget, and to the required quality standards. The position involves managing client relationships through regular communication, coordinating project planning and delivery, and ensuring all project scope, specifications, and documentation are agreed before works commence. Key responsibilities include overseeing procurement of materials and equipment, supporting cost planning and budget control, monitoring labour, subcontractor, and material costs, and working closely with Commercial, Procurement, and Operations teams to maintain project performance. The role also requires chairing project review meetings, managing change control and commercial reporting, forecasting resource requirements, and ensuring projects are safely delivered through to successful completion, including testing, commissioning, handover documentation, certification, and client sign-off, while contributing to continuous improvement and operational excellence across the business.
Sobre este empleo
Sobre Alternative Heat
Resumen de la empresa
Alternative Heat Limited, de propiedad privada, cuya sociedad matriz última es MCMU Holdings Limited
Banbridge, Irlanda del Norte, Reino Unido
2005
Unos 400 empleados de media y una facturación de 62,3 millones de libras en el ejercicio cerrado en marzo de 2026
A qué se dedica
Alternative Heat diseña y construye soluciones MEP (instalaciones mecánicas, eléctricas y de fontanería) prefabricadas fuera de obra, diseñadas y fabricadas internamente, para mercados del Reino Unido, Irlanda y la Europa continental. Sus sectores clave van desde los centros de datos y las grandes redes de calefacción urbana hasta los edificios residenciales en altura y el sector sanitario.
En calor renovable, ofrece sistemas prefabricados llave en mano de biomasa y bombas de calor. Es socio y distribuidor exclusivo de la gama de biomasa HERZ en el Reino Unido e Irlanda, tiene un acuerdo de suministro directo con Rhoss para bombas de calor comerciales y ofrece contratos de servicio y mantenimiento para todas sus instalaciones renovables.
Proyectos y trayectoria
Alternative Heat completó la descarbonización de la Temperate House del Real Jardín Botánico de Kew, el mayor invernadero victoriano conservado del mundo, junto con la vecina Evolution House. Como contratista principal y diseñador principal, ejecutó un programa de bombas de calor aerotérmicas e hidrotérmicas en varios centros para el Lambeth Council, y en el Royal Air Force Museum instaló un sistema de bombas de calor aerotérmicas e hidrotérmicas de dos etapas de 1.550 kW.
En biomasa, diseñó e instaló una central energética de biomasa de 2 MW para el Fife Council y suministró una central energética de biomasa de 1,5 MW para el University Hospital Ayr por encargo de NHS Ayrshire and Arran. En 2023, The Highland Council le adjudicó un contrato de operación y mantenimiento de instalaciones de biomasa, licitado por un valor estimado de 35 millones de libras, que durante 6 años cubre el servicio, el mantenimiento y el suministro de combustible de biomasa a 88 emplazamientos.
Novedades
La facturación de Alternative Heat Limited subió a 62,3 millones de libras en el ejercicio cerrado en marzo de 2026, frente a 46,3 millones de libras en el ejercicio cerrado en marzo de 2025. Según sus administradores, la empresa ha conseguido varios contratos importantes que se ejecutarán en los próximos años y ha seguido ampliando su plantilla para poder cumplirlos.
En marzo de 2025 obtuvo un contrato de cuatro años en el acuerdo marco CHIC (Communities & Housing Investment Consortium) para el suministro, la instalación, la sustitución y el mantenimiento de tecnologías bajas en carbono. En junio de 2026, su equipo Decarb Modular Solutions de Mallusk entregó la primera central energética modular fabricada en esa planta, inaugurada a finales del año anterior. En octubre de 2026 terminó sus trabajos en tres salas de calderas de biomasa prefabricadas para colegios de Wexford dentro del Schools Energy Pathfinder Programme 2024 y ganó el premio a la innovación (Innovation Award) de los Louth Business Awards 2026.
En centros de datos, anunció en diciembre de 2025 que había entregado e instalado una sala de enfriadoras de 20 MW para un gran proyecto de centro de datos. En enero de 2026 suministraba soluciones modulares fabricadas fuera de obra para dos proyectos de centros de datos de un cliente de muchos años en la región de Ámsterdam, de 19,2 MW y 28,8 MW.
Trabajar en la empresa
Alternative Heat tiene oficinas y centros en el Reino Unido, Irlanda y el resto de Europa, con vacantes en distintos puestos y ubicaciones. Además de la sede de Banbridge, cuenta con oficinas en Belfast, Dundalk, Dublín, Londres, Birmingham, Glasgow, Inverness, Fráncfort y Ámsterdam. En sus plantas de fabricación y montaje de Scarva, Gilford y Banbridge, el trabajo va desde la recepción de las tuberías y la fabricación, pasando por la soldadura, el granallado, la pintura y el montaje, hasta la expedición.
En septiembre de 2026 puso en marcha el Student Programme 2026, que acompaña a sus aprendices de nivel superior y a sus estudiantes en prácticas durante todo su tiempo en la empresa. Entre sus acreditaciones figura la de Living Wage Employer.