Scottish Power

Responsable de Construcción - Cumplimiento CDM

Únete a ScottishPower en Lowestoft como Jefe de Construcción - Cumplimiento CDM. Lidera auditorías, asegura el cumplimiento normativo y apoya la seguridad del proyecto. Disfruta 36 días de vacaciones, plan de pensiones con aportación doble y beneficios para transporte sostenible.
Scottish Power
Scottish Power
Lowestoft, Suffolk, Reino Unido Presencial Tiempo completo UTC+00:00

Scottish Power

Descripción de la Empresa

Nombre

ScottishPower Limited, una subsidiaria de propiedad total de Iberdrola

Sede

Glasgow, Escocia, Reino Unido

Fundada

1990

Tamaño

Aproximadamente 5,000 empleados (fuente: linkedin.com). Las cifras de ingresos para 2023 no se han divulgado, pero Iberdrola se ha comprometido a invertir £24 mil millones en el Reino Unido para 2028, incluyendo a través de ScottishPower (fuente: energyadvicehub.org).

Qué Hacen

ScottishPower es una empresa de energía verticalmente integrada que opera como el operador de la red de distribución para Escocia Central y Meridional, Merseyside, Gales del Norte y partes de Cheshire y Shropshire. La empresa suministra electricidad y gas a hogares y negocios en todo el Reino Unido y genera energía para la red (fuente: wikipedia.org). Su enfoque tecnológico principal incluye energía eólica, energía solar, mejoras de red, almacenamiento en baterías y hidrógeno bajo en carbono, habiendo hecho la transición a generar electricidad 100% verde al desinvertir en sus activos de carbón y gas (fuente: wikipedia.org). Las ofertas de productos de ScottishPower abarcan generación renovable de 38 parques eólicos en tierra y más de 40 sitios operativos que producen más de 3 GW de capacidad total, junto con servicios como redes inteligentes, carga de vehículos eléctricos, bombas de calor y soluciones solares para empresas (fuente: scottishpower.co.uk). La empresa se dirige a clientes residenciales del Reino Unido, negocios comerciales y comercio mayorista de energía, aprovechando su posición como parte de Iberdrola, un líder mundial en energía eólica (fuente: energybrokers.co.uk).

Proyectos y Trayectoria

ScottishPower ha completado varios proyectos notables, incluyendo el parque eólico en tierra Whitelee, que es el más grande de Europa con 539 MW, con 215 turbinas y una batería de 50 MW (fuente: wikipedia.org). La empresa también repotenció el primer parque eólico comercial de Escocia, Hagshaw Hill, que volvió a estar en línea en noviembre de 2025 para aumentar la producción y los beneficios para la comunidad (fuente: scottishpowerrenewables.com). Los proyectos importantes en curso incluyen los parques eólicos marinos East Anglia ONE y East Anglia THREE, así como el proyecto marino Wikinger en el Mar Báltico alemán (fuente: cisco.com). ScottishPower Renewables gestiona el portafolio del Reino Unido de Iberdrola, que supera los 2,000 MW de 40 parques eólicos, con planes para una mayor expansión solar y de hidrógeno (fuente: windenergyireland.com).

Desarrollos Recientes

En los últimos años, ScottishPower aseguró £1.35 mil millones para siete mejoras de red, incluyendo cables submarinos y subestaciones, para mejorar el transporte de la energía eólica escocesa hacia el sur (fuente: energyadvicehub.org). Iberdrola anunció una inversión significativa de £24 mil millones en el Reino Unido para 2028, enfocándose en energías renovables y resiliencia de la red (fuente: energyadvicehub.org). Además, ScottishPower Renewables está lista para invertir casi £3 mil millones en proyectos de energía eólica y solar en alta mar y en tierra desde 2023 hasta 2025 (fuente: cisco.com). En el sector del hidrógeno, Iberdrola lanzó una unidad en septiembre de 2023, con un objetivo de 600 MW para 2025 y 5 GW para 2030, con el proyecto de Hidrógeno Verde para Escocia de ScottishPower que cuenta con un electrolizador de 10 MW (fuente: energybrokers.co.uk).

Trabajar Allí

ScottishPower ofrece una variedad de roles en desarrollo y operaciones de energías renovables, redes de energía, generación y funciones de soporte como gestión de energía y TI/seguridad (fuente: scottishpowerrenewables.com). La empresa contrata principalmente en su sede de Glasgow, con operaciones vinculadas a parques eólicos en todo el Reino Unido y sitios en alta mar en East Anglia y el Mar del Norte Meridional (fuente: windenergyireland.com). La cultura de la empresa enfatiza la innovación en energías renovables y el compromiso con la comunidad, como lo evidencian iniciativas como la fase de retroalimentación de MachairWind y asociaciones con organizaciones locales (fuente: scottishpower.co.uk). Aunque no se detallan beneficios específicos, la empresa invierte fuertemente en iniciativas verdes y apoya las transiciones hacia cero emisiones impulsadas por los empleados para los clientes comerciales (fuente: scottishpower.com).


Última actualización el feb. 23, 2026 | Informar un problema

The Construction Manager - CDM Compliance, supports the Project Construction Manager (PCM) in the discharge of Principal Contractor duties under the Construction (Design and Management) Regulations 2015 (CDM Regulations). The role is responsible for establishing, implementing and assuring CDM compliance arrangements across all construction activities and contractors, ensuring that construction works are planned, managed, monitored and coordinated in accordance with legal, project and company requirements. The position forms part of the project site leadership team and provides independent construction compliance oversight across all project packages.

What you'll be doing

  • Support the Project Construction Manager (PCM) in meeting Principal Contractor responsibilities, ensuring compliance with CDM regulations and maintaining accurate evidence of adherence across all project activities. You will also support the implementation and ongoing management of the Construction Phase Plan.
  • Lead contractor compliance monitoring activities, carrying out CDM audits, inspections and assurance reviews across both onshore and offshore environments. The role will involve monitoring safe systems of work and driving high standards of health, safety and regulatory compliance.
  • Provide specialist CDM guidance to project and contractor teams, maintaining compliance reporting, KPIs and governance records. You will also support Site Works Committees and governance forums, contributing to continuous improvement and effective project delivery.

What you'll bring

The successful candidate will be an experienced construction professional with a strong understanding of CDM Regulations, Principal Contractor duties and the management of construction activities within complex, multi-contractor environments. Experience within offshore wind, energy, marine or major infrastructure projects would be highly advantageous.

The role requires sound knowledge of construction management systems, contractor management, safe systems of work, permitting arrangements, RAMS and construction risk management. Candidates should have experience leading compliance audits, inspections and assurance activities, with the ability to identify risks, challenge non-compliant behaviours and drive effective corrective actions.

Strong communication, stakeholder management and influencing skills are essential, together with the ability to operate effectively within a project leadership environment. The successful candidate will be a credible construction leader capable of balancing operational delivery requirements with legal, safety and governance obligations. Experience operating within a Principal Contractor organisation during the execution phase of major construction projects is preferred.

What's in it for you

As well as a competitive salary which is reviewed annually, you can also enjoy a number of other benefits. With our pension scheme, we'll double match your contribution up to a company contribution of 10%.

At ScottishPower, we believe it's the little things we do in life that make a big difference. From helping you look after your family's wellbeing, save for your future and take personal steps for climate action - our benefits are designed to help you do just that - so that you have everything you need to take care of your world - today and tomorrow. That's why our benefits include:

  • 36 days annual leave
  • Holiday Purchase - perfect your work/life balance with extra annual leave
  • Share Schemes
  • Payroll Giving and Charity Matched Funding
  • Technology Vouchers - save more and spread the cost of your technology purchases
  • Electric Vehicle Schemes - to help you transition to green/clean driving
  • Cycle to Work scheme and Public Transport Season Ticket Loans
  • Healthcare benefit options including: Dental Insurance, Private Medical Insurance, Health Cash Plan and annual Health Assessments
  • Life Assurance (4x salary)
  • Access to Savesmart financial wellbeing support
  • Plus shopping, leisure, restaurant and gym discounts, and unique employee deals on travel insurance and more

Why ScottishPower

ScottishPower is part of the Iberdrola Group, one of the world's largest integrated utility companies and a world leader in wind energy. With a commitment to generate all of our energy from renewable resources and a drive to create the energy infrastructure of the future, we're at the forefront of the journey to Net Zero and investing over £6m every working day to make this happen. With diverse opportunities across our businesses and a commitment to invest in our own internal talent, ScottishPower can offer people real career opportunities that meet personal and professional goals, in a global organisation.

Inclusion, diversity, and a social purpose are at the heart of everything we do. Together with our values, they bring us together into a stronger, more sustainable business with direct links to the communities we serve. It takes all kinds of people to build a large-scale business like ours, so whatever your background, you'll fit right in.

ScottishPower is committed to providing reasonable support or adjustments in our recruiting processes for candidates with disabilities, long term conditions, mental health conditions, or who are neurodivergent or require pregnancy-related support. If you need support, please reach out to [email protected].

Please note that any applicant who is not a citizen of the country of the vacancy will be subject to compliance with the applicable immigration requirements to legally work in that country. If/when required, the Company will support the employee with the necessary Immigration requirements.

Aplicar ahora

¿El empleo expiró?

Indica a Scottish Power que encontraste este empleo en Rejobs. Nos ayuda a crecer y a que más personas trabajen en energías renovables.

Sobre el rol

20 agosto 2026

21 agosto 2026

Tiempo completo

Presencial

Empresa

Energía eólica

Scottish Power

scottishpower.com

  •  Lowestoft, Suffolk, Reino Unido

Experienced construction professional

UTC+00:00