Functieomschrijving
We are at the beginning of a global energy transformation of a scale not seen in generations. A future low-cost, low-carbon electric grid, serving a world that electrifies everything, is within our reach.
The last remaining gap is breaking the link between electricity supply and demand. The lowest-cost, most sustainable sources of energy today come from intermittent renewable generation; but our homes, businesses and industries need electricity at the flick of a switch.
That gap can be closed by energy storage: Devices that store electricity when it is plentiful, then provide power back to the grid when it is needed. Solutions, including ones using lithium-ion batteries, are being deployed in massive numbers to start filling this gap. But so far, none of those solutions have proven the ability to deliver power any time, anywhere, over decades of service: The level of reliability we've come to expect, and that the future grid will need.
This is the biggest challenge in energy today. Invinity is at the forefront of finding a solution. And we need you to help us deliver it.
Developed, manufactured and delivered by our teams in Canada and the UK, Invinity's vanadium flow batteries (or "VFBs") can be installed anywhere and consistently deliver electricity as needed over a service life exceeding 30 years. Moreover, Invinity's VFBs are highly recyclable, don't rely on rare or conflict minerals, and won't catch fire.
Invinity is a global VFB leader, with over 190 megawatt-hours of its batteries operational or in construction for over 82 projects across 15 countries - more than any other emerging energy storage provider. We've deployed the largest flow battery systems in the U.S., Canada, Australia, and the UK. Along the way we've earned financial support from the UK Infrastructure Bank, the U.S. Department of Energy, and some of the world's leading institutional investors.
The Operations Change Analyst coordinates, analyzes, and supports the execution of operational, manufacturing, supplier, service, and engineering changes across Invinity Energy Systems. This role ensures that changes are correctly classified, accurately reflected in operational systems, implemented efficiently, and verified with minimal disruption to production, service, quality, cost, or delivery commitments. The role works cross-functionally with Engineering, Operations, Quality, Supply Chain, Manufacturing Engineering, Supplier Development / Supplier Quality, and external partners to maintain execution discipline and clear visibility across the change lifecycle. This role reports to Supplier Development / Strategic Sourcing.
Reporting and ownership
Reporting and ownership: This role reports into Supplier Development / Strategic Sourcing and acts as the operational change-control coordinator for approved engineering, manufacturing, supplier, and service changes. The role is accountable for maintaining change visibility, coordinating execution readiness, and ensuring that operational systems, supplier information, cost data, and validation evidence remain aligned to approved change decisions.
Key Responsibilities
Change Classification & Impact Analysis
- Classify and manage types of changes including documentation changes, non‑revision changes, and manufacturing change orders (MCOs).
- Analyze operational, inventory, cost, timing, and risk impacts of changes.
- Perform inventory analysis to identify exposure, disposition actions, and planning impacts.
ERP, Item Master & Cost Data Management
- Maintain Item Master and Cost Master information aligned to approved changes.
- Ensure accuracy of part attributes, lifecycle states, costing, and effectivity in Operations.
- Prepare BOM exports and documentation for Manufacturing Engineering, Supplier Development and other Operations team members for use at CMs, and suppliers.
Validation & Quality Coordination
- Coordinate validation activities such as FAI, PPAP, capability studies, test reports, qualification builds, and process validation evidence.
- Track and document completion of validation activities.
- Follow up on Change Implementation activities
Manufacturing & Process Documentation
- Ensure manufacturing and quality documents are indexed as required by Engineering changes including PFMEAs, Control Plans, Process Flow Diagrams, Work Instructions, and Inspection Plans.
Implementation, Verification & Service Support
- Coordinate implementation plans for service‑related changes.
- Perform and document basic verification of implemented changes.
- Support production and service teams during change cut‑in and early execution.
Reporting & Visibility
- Provide operations‑focused reporting on change status, progress, risks, and completion.
Additional Responsibilities
- Act as a Jira project expert and support for Operations including administration support for Ostro.
- Support supplier scorecard preparation and maintenance.
- Assist with supplier funnel activities, sanctions screening, and vendor onboarding.
- Support PDP documentation and organization of phase‑gate records.
Qualifications
Education
- Technical Diploma or Degree in Engineering, Manufacturing, Supply Chain, Operations, or related discipline.
Experience
- Experience in operations, change management, manufacturing, supply chain, or ERP‑driven roles.
- Experience with manufacturing or technical environments preferred.
Key Competencies
- Strong analytical and organizational skills.
- Attention to detail and high documentation discipline.
- Clear communicator across technical and operational teams.
- Ability to manage multiple priorities and deadlines.
Success Measures
- On‑time implementation of approved changes with minimal disruption.
- Accurate ERP Item Master, Cost Master, and BOM data.
- Minimal inventory obsolescence attributable to change execution.
- Timely completion of validation activities.
- Up‑to‑date manufacturing and quality documentation.
- Clear and reliable change status reporting.
$90,000 - $110,000 a year
At Invinity Energy Systems, we are dedicated to providing equal employment opportunities to all individuals and practicing wage transparency to ensure fairness and equity. The salary for this position ranges from $90,000 to $110,000 per year and will be determined by a combination of the interview process, prior work experience, and educational background.
Invinity Energy Systems is small enough that every team member plays a critical role in our daily business, but large enough to participate in landmark clean energy projects around the world. With its exposure to our most impactful emerging products, this role will be critical in us delivering on those opportunities. If you are great at what you do, willing to engage with our dedicated, collaborative culture, and motivated by taking on and delivering against some of the biggest opportunities in energy today, we'd love to hear from you.
We may use artificial intelligence (AI) tools to support parts of the hiring process, such as reviewing applications, analyzing resumes, or assessing responses and identifying potential inconsistencies or verification signals in application materials based on available information. These tools assist our recruitment team but do not replace human judgment. Final hiring decisions are ultimately made by humans. If you would like more information about how your data is processed, please contact us.
Salaris en voordelen
Over deze vacature
Over Invinity Energy Systems
Bedrijfsprofiel
Invinity Energy Systems plc, genoteerd aan de AIM in Londen, met het National Wealth Fund als grootste aandeelhouder
Londen, Verenigd Koninkrijk
2020
ongeveer 160 medewerkers en een omzet van £ 8,2 miljoen in 2025
Wat ze doen
Invinity Energy Systems ontstond in 2020 uit de fusie van twee leveranciers van flowbatterijen, redT energy en Avalon Battery. Het bedrijf is een wereldwijde fabrikant van vanadium-flowbatterijen, een alternatief voor lithium-ion voor stationaire energieopslag. De batterijen zijn volledig recyclebaar, vatten geen vlam en bevatten geen zeldzame aardmetalen of conflictmineralen zoals kobalt, en het bedrijf ontwerpt ze voor meer dan 30 jaar continu cycleren.
De producten zijn Endurium voor grootschalige toepassingen en Endurium Enterprise voor zakelijke en industriële klanten. Endurium, gelanceerd in december 2024, schaalt van 3 MW tot meer dan 100 MW en levert 4 tot meer dan 18 uur zonder cycluslimiet, terwijl Endurium Enterprise klanten bedient die 1 tot 20 MW nodig hebben. Volgens het bedrijf draaien de systemen op bijna 100 locaties in meer dan 17 landen.
Invinity noemt zichzelf de grootste Britse fabrikant van energieopslag op netschaal, met ontwerp, engineering, productie en assemblage in zijn vestigingen in de Schotse Central Belt. De fabriek in Vancouver is een centrale hub voor productie, engineering en operations en kon na de uitbreiding in juni 2023 tot 200 MWh aan batterijen per jaar produceren. Het bedrijf breidt ook zijn toeleveringsketen en zijn productiecapaciteit in de VS, het Verenigd Koninkrijk, Canada en China uit.
In de VS werkt het via Invinity Energy Systems (US) Corporation, gevestigd in Vista, Californië, en plant het stackproductie, moduleassemblage en systeemintegratie in de Californische faciliteiten van een partner, waar twee geplande stacklijnen meer dan 1 GWh aan Endurium-batterijen per jaar moeten produceren.
Jonathan Marren werd in september 2024 benoemd tot CEO, nadat hij eerder CFO en Chief Development Officer was. Matt Harper, medeoprichter van Avalon Battery, werd in april 2020 Chief Commercial Officer en nam daar in 2024 de rol van President bij.
Projecten en ervaring
Invinity leverde een batterij van 2 MW / 5 MWh, opgebouwd uit 27 VS3-flowbatterijen, aan Energy Superhub Oxford in Cowley, destijds de grootste flowbatterij van het Verenigd Koninkrijk, als hart van een hybride systeem van lithium-ion- en vanadium-flowbatterijen van in totaal 50 MW. Op het eiland Eday in Orkney installeerde het een flowbatterij van 1,8 MWh bij de waterstofonderzoeksfaciliteit van EMEC, het eerste systeem ter wereld dat getijdenenergie, opslag in vanadium-flowbatterijen en waterstofproductie combineert.
In Alberta leverde Invinity een batterij van 8,4 MWh, de grootste in zijn soort in Canada, voor de zonne- en opslagcentrale Chappice Lake, ontwikkeld door Elemental Energy en deels in handen van de Cold Lake First Nations; het zonnepark van 21 MWp en de batterij waren in het voorjaar van 2023 klaar. Bij San Diego nam het een VS3-systeem van 10 MWh voor de Viejas Tribe of Kumeyaay Indians in gebruik, gekoppeld aan een solar carport van 15 MWp. De batterij, eind 2025 volledig in bedrijf genomen, had tegen oktober 2026 meer dan 1 GWh geleverd.
In East Sussex heeft Invinity een systeem van 20,7 MWh voor de Copwood VFB Energy Hub geleverd, dat na ingebruikname de grootste vanadium-flowbatterij van Europa wordt. Voor het project kreeg het de maximale subsidie van £ 10 miljoen uit de Longer Duration Energy Storage Demonstration Competition van de Britse overheid, en de bouw van de locatie begon in november 2025.
Recente ontwikkelingen
In mei 2026 koos FlexBase Group Invinity om een vanadium-flowbatterij van maximaal 1,5 GWh te ontwerpen voor zijn Technology Centre Laufenburg in Zwitserland, een technologiecampus met een AI-datacenter; FlexBase wil de batterij in latere fases uitbreiden tot 2,1 GWh, en de engineeringfase loopt naar verwachting in 2026 en tot in 2027. In augustus 2026 tekende Invinity een EPC-overeenkomst met Equans Switzerland, dat de mechanische, elektrische en leidingwerkzaamheden uitvoert.
In juni 2026 koos Pacific Steel Group een Invinity-systeem van 32 MWh, dat de grootste vanadium-flowbatterij van Noord-Amerika wordt, voor zijn staalfabriek Mojave Micro Mill in Kern County, Californië, naast een zonnepark van meer dan 40 MWp. Invinity produceert de batterijen in de VS; de levering begint naar verwachting in het eerste kwartaal van 2027. In november 2026 nam de Soboba Band of Luiseño Indians een Invinity-batterij over in een solar microgrid dat hun brandweerkazerne bij San Jacinto, Californië, minstens 10 uur noodstroom geeft.
In augustus 2026 had de vloot van het bedrijf meer dan 10 GWh aan energie aan klanten geleverd, cumulatief 85% meer dan een jaar eerder, en in november was dat al meer dan 12 GWh. Diezelfde maand verhoogde Invinity de energiecapaciteit van elke Endurium-module met 50%, van 342 kWh naar 516 kWh, bij een piekvermogen van 125 kW. In september 2025 betrad het de Indiase markt met strategisch partner Atri Energy Transition, met in India gemaakte vanadium-flowbatterijen.
Werken bij het bedrijf
In 2025 had Invinity gemiddeld 87 mensen in dienst in Canada, 66 in het Verenigd Koninkrijk en 9 in de VS. De belangrijkste vestigingen zijn Vancouver, Edinburgh, Londen en San Francisco, en in Motherwell, Schotland, worden de batterijen geassembleerd in een productiefaciliteit.
Volgens het jaarverslag 2025 hebben alle in aanmerking komende vaste medewerkers aandelenopties gekregen, werkt het bedrijf niet met nulurencontracten en betaalt het naar functie en volgens leefbaarloonnormen, en zal naar verwachting een aanzienlijk deel van de nieuwe functies leer- en traineeprogramma's omvatten in productie, werktuigbouwkunde, elektrotechniek en ondersteunende functies. Invinity volgt een uitgebreid beleid voor gelijke kansen.