Functieomschrijving
Do you want to work with high-caliber professionals in a dynamic and growing company? Are you entrepreneurial, hard-working, and collegial? Join us at SB Energy, a leading infrastructure company backed by SoftBank Group and Ares Infrastructure, pairing cutting-edge innovation with best-in-class execution. Our mission is to deliver reliable and secure data center and power infrastructure to strengthen America's future.
Founded in 2019, SB Energy is a SoftBank Group company headquartered in Redwood City, California. In 2026, SoftBank Group and OpenAI announced a $1 billion investment to support SB Energy as their leading development and execution partner for data center campuses, while Ares Infrastructure continues its long-standing support of the company's growth. SB Energy develops, builds, owns, and operates some of the largest and most technically advanced energy and data center infrastructure projects in the United States. Since its founding, the company has rapidly grown into a top-tier integrated platform with more than 3 gigawatts (GW) in operation and a multi-GW pipeline of energy and data center infrastructure nationwide.
SB Energy also leverages a strong culture of innovation to identify and integrate new technologies into its projects, including its AI-based digital platform, delivering energy infrastructure that is local, reliable, and matched to load. We are building the energy and infrastructure future-today.
Come join us in accelerating the energy and infrastructure transition!
Basic Function
Leadership of the datacenter construction team is committed to offering every team member an opportunity to engage your core skills and knowledge, while helping each person develop new and valuable skills throughout the duration of the project.
The Mechanical Lead is responsible for managing and coordinating all mechanical systems across data center construction projects. This role ensures that mechanical infrastructure is designed, constructed, tested and delivered to meet performance requirements, redundancy targets, and long-term operational reliability.
This individual works cross-functionally with internal teams, external design partners, and construction stakeholders to translate design intent into successful project execution.
Responsibilities
- Manage the mechanical scope of work across all project phases including concept design, basis of design, detailed design, construction, and closeout.
- Serve as the primary interface between internal teams and external mechanical engineering consultants
- Coordinate with mechanical engineers and consultants on: cooling plant strategies, chilled water and/or refrigerant -based systems, CRAH/CRAC units and in-row cooling, pumping, piping, and heat rejection systems.
- Review design deliverables for compliance with Owner standards, codes, constructability, and lifecycle considerations.
- Serve as the Owner's representative for all mechanical systems during construction.
- Review and manage mechanical submittals, RFIs, change orders, and field clarifications.
- Monitor contractor performance related to safety, quality, schedule, and cost.
- Participate in site walks, inspections, and quality audits.
- Validate mechanical pay applications and change order pricing.
- Coordinate mechanical scope with electrical, structural, and commissioning teams to ensure seamless system integration
- Support commissioning activities including test procedures, system validation, and turnover documentation
- Support detailed project schedules with emphasis on mechanical milestones and long-lead equipment procurement.
- Assist with mechanical cost estimating, budget management, and forecasting.
- Identify technical, constructability, or procurement risks impacting mechanical scope and develop mitigation strategies.
- Provide mentorship and technical guidance to project engineers.
Qualifications/Requirements
- Bachelor's degree in related field.
- 5-10+ years of experience in mechanical engineering, project engineering, or construction management
- Strong knowledge of data center cooling systems and thermal management, hydronic systems, piping, pumping, HVAC controls and sequences of operations, and reliability best practices.
- Experience reviewing and coordinating with external engineering firms
- Experience delivering large-scale, mission-critical, industrial or data center projects.
- Strong communication and cross-functional collaboration skills
Location
Site-based role in Borden County, TX (Near Lubbock)
Base Pay
$115,000-$165,000
The pay range mentioned above is a guideline. We tailor each offer based on your unique skills, experience, location, and market benchmarks-while ensuring internal parity across our teams. In addition to competitive base pay, total compensation may include a discretionary annual bonus and a market leading comprehensive health and wellness benefits package. Final details will be discussed during the later stages of the hiring process.
Our Health & Wellness Benefits
At SB Energy, we invest in our people and their families with benefits designed for flexibility, support, and peace of mind. Full-time employees enjoy:
- 100% Company-Paid Medical, Dental & Vision (for employees and dependents)
- 401(k) with Company Match
- Generous Paid Time Off + 11 Paid Holidays
- 12 Weeks Paid Parental Leave
- Life, AD&D & Long-Term Disability Coverage
- Flexible Spending Accounts (FSA) for Medical, Dependent Care, Transit & Parking (with company contributions)
- Mental, Physical & Social Wellness Support (with company contributions)
- Flexible Work Arrangements & Hybrid Office Setup Benefits
- Monthly Reimbursement for Phone, Internet & Data
- Optional Legal & Pet Insurance Plans
- Device Purchase Support
At SB Energy, the success of our projects is driven by a desire to see our projects benefit as many people as possible. We work to serve local communities through volunteering, fundraising, and much more. For example, we're proud to support access and opportunity in engineering and clean energy through impactful mentorship programs and workforce training. When you join SB Energy, you can become a part of these efforts, collaborating with team members who share a vision of building a better future now!
SB Energy is built on a foundation of collaboration and inclusion. We are proud to be an equal opportunity employer. All qualified applicants will receive consideration for employment without regard to race, color, religion, creed, gender, national origin, age, disability, veteran status, marital status, pregnancy, sex, gender expression or identity, sexual orientation, citizenship, or any other legally protected class.
To learn more about us, visit www.sbenergy.com.
Salaris en voordelen
Over deze vacature
Over SB Energy
Bedrijfsoverzicht
SB Energy, een dochteronderneming van SoftBank Group Corp.
HoofdkantoorSan Francisco, CA, Verenigde Staten
Opgericht2019
GrootteOngeveer 50-200 medewerkers (bron: solarplaza.com). Geen openbare omzetcijfers gerapporteerd voor 2023 of later.
Wat Ze Doen
SB Energy is een in de VS gevestigde ontwikkelaar van hernieuwbare energie die fungeert als het primaire platform voor SoftBank Group Corp. om zonne-energie, energieopslag en gerelateerde klimaat-infrastructuur in Noord-Amerika te implementeren (bron: sbenergy.com). Het bedrijf richt zich op grootschalige zonne-fotovoltaïsche (PV) projecten, batterij-energieopslagsystemen (BESS) en net-geïntegreerde oplossingen, die essentieel zijn voor het leveren van flexibele hernieuwbare energieproductie (bron: sbenergy.com). De aanbiedingen van SB Energy omvatten greenfield-ontwikkeling, projectacquisitie en de exploitatie van zonneparken en opslagfaciliteiten, met een opmerkelijke raamovereenkomst met ESS Inc. om tegen 2026 2 gigawatt-uur (GWh) aan langdurige ijzeren flowbatterijen te implementeren (bron: sbenergy.com). Het bedrijf richt zich op de Amerikaanse nutssector, datacenters en klanten met een hoge vraag naar schone energie, en heeft sinds zijn oprichting meer dan $10 miljard aan totale projectfinanciering opgehaald, waaronder meer dan $4 miljard aan belastingequity en schulden (bron: sbenergy.com). Het concurrentievoordeel van SB Energy ligt in de snelle uitvoering, waarbij het bijna 2 gigawatt (GW) zonne-energie binnen twee jaar na de oprichting online heeft gebracht, gebruikmakend van SoftBank's AI- en technologie-ecosysteem naast de infrastructuurexpertise van Ares (bron: sbenergy.com).
Projecten & Track Record
SB Energy heeft operationele status bereikt voor bijna 2 GW aan zonnecapaciteit binnen slechts twee jaar na de oprichting in 2019, hoewel specifieke projectnamen en individuele capaciteiten niet zijn gedetailleerd in beschikbare records (bron: sbenergy.com). Het bedrijf is momenteel betrokken bij grote projecten, waaronder de implementatie van 2 GWh aan ESS langdurige opslag op meerdere locaties tot 2026, met de eerste levering gepland voor Californië (bron: sbenergy.com). De klantenbasis van SB Energy omvat partnerschappen met ESS Inc. voor opslagtechnologie en toonaangevende financiële instellingen die meer dan $4 miljard aan financiering voor zijn projecten hebben verstrekt (bron: sbenergy.com). Het bedrijf heeft ook een significante aanwezigheid in Japan, waar zijn activiteiten ongeveer 128.180 huishoudens van stroom hebben voorzien via 34 zonneparken, goed voor meer dan 408,5 MW per oktober 2017 (bron: solarplaza.com). De Amerikaanse activiteiten van SB Energy zijn voornamelijk gevestigd in Californië, met plannen voor verdere uitbreiding in Noord-Amerika, waarmee het zich onderscheidt van SoftBank's afgestoten internationale takken (bron: climatebase.org).
Recente Ontwikkelingen
In de afgelopen twee jaar heeft SB Energy een belangrijke strategische equity-investering van maximaal $600 miljoen veiliggesteld, geleid door Ares Management, gericht op het versnellen van zijn Amerikaanse hernieuwbare energieplatform en het opschalen van digitale infrastructuur (bron: sbenergy.com). Het bedrijf heeft ook zijn overeenkomst met ESS Inc. afgerond voor de implementatie van 2 GWh aan langdurige opslag tegen 2026, wat een belangrijke mijlpaal markeert in hybride energieoplossingen (bron: sbenergy.com). Hoewel er geen grote overnames of nieuwe financieringsrondes zijn gerapporteerd voor de Amerikaanse entiteit buiten de Ares-deal, omvatten SoftBank's bredere desinvesteringen de verkoop van de controle over zijn Japanse SB Energy aan Toyota Tsusho in februari 2023 (bron: wikipedia.org). Bovendien heeft het bedrijf geprobeerd zijn 80% belang in de Indiase eenheid te verkopen, die een portfolio van 7,7 GW heeft, hoewel deze deal later werd afgebroken (bron: pe-insights.com). SB Energy is ook erkend als een Great Place to Work, wat de positieve werkcultuur benadrukt (bron: greatplacetowork.com).
Werken Bij
SB Energy biedt een verscheidenheid aan functies in verschillende afdelingen, waaronder ontwikkeling en oorsprong, netintegratie, operationele uitmuntendheid, financiën, kapitaalmarkten en juridische/compliance (bron: sbenergy.com). Het bedrijf werft voornamelijk voor posities op zijn hoofdkantoor in de San Francisco Bay Area en projectlocaties, met name voor zijn opslagprojecten in Californië, in lijn met zijn op de VS gerichte groeistrategie (bron: sbenergy.com). De cultuur van SB Energy benadrukt een eigenaarsmentaliteit, teamleren en groei, en verwelkomt diverse perspectieven en ideeën terwijl het zijn missie met enthousiasme nastreeft (bron: sbenergy.com). Het bedrijf is gecertificeerd als een Great Place to Work sinds de oprichting in 2019, wat wijst op een toewijding aan positieve werknemerservaringen (bron: greatplacetowork.com). Specifieke voordelenpakketten zijn niet publiekelijk gedocumenteerd in beschikbare bronnen.
Je LinkedIn-connecties
Bekijk je contacten bij SB Energy op LinkedIn en gebruik je netwerk bij het solliciteren.
Bekijk je connecties