Descrição da função
Overview
Grid & HV Project Manager Bucharest
Why this role matters
The position will be responsible for all the commercial and technical deliverables from project structuring through to technical handover on the Interconnection Works (MV Switchgear, HV substations and OHLs) for a dedicated Scatec project, or portfolio of linked projects. The position will build a strong relationship with EETC teams to move project Gerid Connection Agreements forward efficiently.
Lead the interfacing with EETC and other consultants on matters related to the interconnection of the renewable energy and process projects to the grid.
Lead the team in the drafting and review of relevant documents to ensure the technical requirement of the projects and Grid Connection Contracts are complied with.
The position will transition to lead the tendering, selection and execution of turnkey EPC substation deliveries on behalf of the Scatec project execution team. Throughout execution the position will be responsible for ensuring EETC compliant substations are delivered on time, connected to grid securing the necessary approvals from EETC.
What you'll be doing
Support to Structuring Phase of projects
- Lead the contracting and delivery of substation EPC packages including any early engineering and approvals processes.
- Monitoring and facilitating the review of the Contractors detailed design, ensuring compliance with Scatec functional requirements, site and permit and licensing conditions, local codes, EETC specifications and industry best practice
- Define and ensure that the project programme is reasonable and accurately considers the detailed Design Timeline, key equipment procurement and allowance for commissioning, testing and local Grid Connection requirements. Ensure that the grid connection and substation delivery timelines meet the overall renewable energy plant commissioning timeline.
- Manage and interface with contractors and equipment suppliers to establish, negotiate and align all technical aspects / approvals of the project.
- Manage the complete Utility interface process on behalf of Scatec from approval of detailed design, through construction, and completion under the Grid Connection Agreement / EPA
- Establish timelines and schedules based on the project schedule and contracts to ensure successful interconnection, commissioning, and grid code compliance.
- Assist the PM to establish and mitigate technical and commercial risks through an effective and updated Risk management system.
- Conduct site assessments accurately and timeously based on the information provided
- Support in evaluating the technical information and provide input to site selection and early phase project development and concept design amongst others
- Support in completing design packages related to the grid connections
- Lead in securing proper grid connection contracts and cascading back-to-back requirements to execution phase subcontracts - namely Substation EPC Contracting.
- Interface with EETC and other stakeholders to establish the project parameters and technical requirements
Support to projects in delivery/execution
- As the project moves into execution, the role is a continuation and development on the above:
- Manage and assess design change requests to be approved by the Lead Engineer and Senior Project Manager
- Manage, clarify and agree interfaces towards the grid and the grid operator
- Management of Governmental/Public/Grid Operator Stakeholders with approval process related to technical and commercial documentation and permits, licenses, authorizations, concessions needed during the execution of the HV and TX scope until commercial operations
- Lead project meetings with contractors and utilities.
- Be on site / visit site on a regular basis to ensure that construction is being implemented as per the design, utility requirements and in line with relevant technical standards and desired quality.
- Manage EPC Contractors in the delivery of griud connections and substations, with integration to RE plants.
- Build a small and efficient team to supervise the delivery and construction of substations under EPC Contracts.
- Provide early warning to the Senior PM on any issues in the project that may influence connection dates or the quality of the final product
- Contribute to drafting the relevant project reports (Bi-weekly, monthly etc.).
- Establish the plant commissioning and utility compliance plans and procedures.
- Plan and manage the Grid Code Compliance tests on site.
- Support in project close out phase by preparing and gathering technical documents as needed to achieve TTO on time.
- Assist in establishing and evaluating quality expectations and documentation during construction.
- Represent Scatec in the Operating Committee and EETC activities w.r.t. deliverables for Grid Code compliance and COD.
- Ensure lessons learned are transferred between different project sites.
- Ensure designs are implemented based on the at least the following documents:
- Detailed Engineering Drawings and Specifications
- Supplier Equipment Manuals
- Lead contract management of subcontractors with the Scatec procurement team.
- Assist in testing and commissioning activities towards Commercial Operation Date
Lead the project close out phase towards taking over of subsrtations and energisation.What you'll bring:
- Degree in Electrical / Electronical or Electromechanical Engineering
- 7+ year of Project Engineering experience - Minimum 5 years' experience in construction projects with Sub Stations and Transmission Lines
- Previous experience on handling communication with local utility and other relevant authorities and stakeholders
- An excellent knowledge of MS Office
- Based in Country and able to travel to site frequently.
- Fluent in both English and Romanian
- Driver's License
- An excellent knowledge of MS Office Ideal:
- Project Management Certificate
- Commissioning and tests of High Voltage Networks and Sub-Stations
- Masters Degree in Engineering
As a general note, the position is not expected to be an expert in the detailed design of Grid Connections, or in Line design, but is expected to be well versed and understand core elements of the design philosophy of the plant.
Similarly, not expected to be a legal expert but should have a clear experience and understanding of how Contracts are executed.
What you'll gain
- Professional growth through ownership, exposure, and meaningful contribution from day one
- Hands-on experience in a role where the challenge is energising, fast-moving, meaningful, and built on learning through doing.
- Broader commercial understanding through close collaboration with cross-functional teams
- Stronger financial, performance, and decision-support skills in a real-world context
If you are motivated by analysis with purpose, commercial insight, and real operational impact, this could be a strong next step in your career.
What we offer
At Scatec, you will be part of a company with a clear and ambitious purpose, working on renewable energy solutions that make a lasting difference. You will gain responsibility early, learn from experienced colleagues, and build your capabilities in a business that offers global exposure, strong development opportunities, and meaningful work in the energy transition.
Scatec is an equal opportunity employer. All qualified applicants will receive consideration for employment based on merit, competence, and business needs.
We review applications on an ongoing basis.
Shall understand EETC grid connection approval, permitting, commissioning and contracting processes.
Sobre esta vaga
Sobre Scatec
Visão Geral da Empresa
Scatec ASA, uma produtora de energia norueguesa de capital aberto e desenvolvedora de projetos listada na Euronext Oslo
SedeOslo, Noruega
Fundação2007
DimensãoAproximadamente 750 colaboradores globalmente (fonte: pitchbook.com). Receita de NOK 4,37 bilhões em 2024 (fonte: stockanalysis.com).
O Que Fazem
A Scatec ASA é especializada no desenvolvimento, construção, propriedade e operação de ativos de energia em grande escala, com foco principal em sistemas solares fotovoltaicos (PV) de grande porte e soluções de armazenamento de energia em baterias. Ao longo do tempo, a empresa ampliou seu portfólio tecnológico para incluir hidrelétricas e projetos selecionados de hidrogênio verde, integrando eletrólise para apoiar iniciativas power-to-X (fonte: scatec.com). Seu modelo de negócios combina ativos operacionais que geram EBITDA com um robusto pipeline de projetos em construção ou em backlog, abrangendo múltiplos continentes, incluindo Europa, África, América Latina e Ásia (fonte: scatec.com). A Scatec atende a uma base diversificada de clientes composta por governos, concessionárias estatais, compradores industriais e parceiros de financiamento de projetos, frequentemente assegurando contratos de compra de energia (PPAs) de longo prazo para garantir a viabilidade econômica dos projetos (fonte: live.euronext.com). Sua abordagem integrada como desenvolvedora e operadora, com um pipeline global de múltiplos gigawatts e uma combinação de ativos geradores de fluxo de caixa operacionais e projetos em fase de construção, os diferencia no setor de energia renovável (fonte: scatec.com).
Projetos e Histórico
O portfólio da Scatec inclui alguns dos maiores projetos híbridos de energia solar e armazenamento do mundo, como a instalação de Kenhardt na África do Sul, que combina 540 MW de solar PV com 225 MW/1.140 MWh de armazenamento em baterias, representando um marco significativo em ativos integrados de energia renovável (fonte: scatec.com). Somente na África do Sul, a empresa opera 730 MW de ativos solares e de armazenamento com 49% de participação econômica (fonte: scatec.com). No Brasil, a Scatec opera 693 MW de capacidade solar com 33% de participação econômica e iniciou a construção do projeto solar Urucuia de 142 MW, respaldado por um PPA de 10 anos assinado com a Statkraft Energia do Brasil (fonte: live.euronext.com). Nas Filipinas, o portfólio inclui 673 MW de ativos hidrelétricos e de armazenamento com 50% de participação econômica, com projetos avançados de armazenamento em baterias como Binga e Magat, cada um avaliado em 56 MW/56 MWh (fonte: scatec.com). Em Botswana, a Scatec iniciou operações comerciais de uma usina solar em março de 2025 e detém o ativo solar Mmadinare Fase 1 em seu portfólio operacional (fonte: live.euronext.com). A empresa também garantiu um contrato para 288 MW de solar PV e um projeto de armazenamento em baterias na África do Sul por meio de licitações governamentais no final de 2024 e meados de 2025, respectivamente (fonte: live.euronext.com). No Egito, a Scatec assinou um PPA histórico de 25 anos para um projeto solar de 1,1 GW mais 100 MW/200 MWh de armazenamento em baterias e está avançando na iniciativa Egypt Green Hydrogen, que inclui 260 MW de capacidade solar e eólica junto com um eletrólito de 100 MW, com acordos de compra de amônia já firmados (fonte: zawya.com). Na Tunísia, a empresa iniciou a construção dos projetos solares Tozeur e Sidi Bouzid, detendo 51% do investimento de US$ 88 milhões, apoiado por um PPA de 25 anos (fonte: zawya.com). Esse diversificado backlog geográfico reforça o crescimento estratégico da Scatec em múltiplos continentes (fonte: scatec.com).
Desenvolvimentos Recentes
Ao longo de 2024 e 2025, a Scatec anunciou consistentemente novos contratos de compra de energia, inícios de projetos e marcos de operação comercial em mercados-chave como Brasil, África do Sul, Tunísia, Botswana e Egito (fonte: live.euronext.com). Destaques notáveis incluem o PPA de 142 MW no Brasil assinado em abril de 2024, o prêmio solar de 288 MW na África do Sul em dezembro de 2024 e o PPA de 120 MW na Tunísia em março de 2025 (fonte: live.euronext.com). Em março de 2025, a Scatec iniciou operações comerciais de uma usina solar em Botswana e garantiu um PPA solar mais armazenamento com a Egypt Aluminium, ampliando ainda mais sua presença na África (fonte: live.euronext.com). A empresa também venceu um projeto de armazenamento em baterias na África do Sul em maio de 2025 e iniciou a construção do projeto solar mais BESS no Egito no mesmo mês (fonte: live.euronext.com). Além disso, a Scatec garantiu uma subvenção de EUR 30 milhões do PtX Development Fund em outubro de 2024 para apoiar o projeto Egypt Green Hydrogen, que avançou para a decisão final de investimento em 2025 com um acordo de compra de amônia com a Fertiglobe (fonte: mees.com). O relatório anual de 2024 e as apresentações para investidores de 2025 destacam uma base crescente de ativos operacionais, geração mais forte de EBITDA e foco estratégico em tecnologias solares, de armazenamento e hidrogênio (fonte: scatec.com).
Trabalhar na Empresa
A Scatec oferece oportunidades de carreira em uma ampla gama de funções, incluindo desenvolvimento de projetos, engenharia, gestão de construção, operações e manutenção, trading e acesso a mercados, finanças, jurídico, ESG e relatórios, compras e suporte corporativo, refletindo a complexidade de seu modelo integrado de negócios em energia renovável (fonte: scatec.com). A empresa mantém presença global com escritórios e locais de projetos em Oslo, África do Sul, Brasil, Filipinas, Egito, Tunísia e Botswana, oferecendo oportunidades geográficas diversas para profissionais (fonte: scatec.com). A Scatec enfatiza a diversidade na liderança, com 32% dos cargos de liderança ocupados por mulheres no quarto trimestre de 2025, e prioriza a segurança, reportando uma taxa de frequência de incidentes com afastamento de 0,6 por milhão de horas trabalhadas, indicativo de uma forte cultura de segurança e sistemas formais de gestão (fonte: marketscreener.com). A estrutura internacional de porte médio da empresa apoia cargos tanto para profissionais experientes do setor energético quanto para equipes corporativas, promovendo um ambiente de trabalho dinâmico e inclusivo (fonte: pitchbook.com).
As suas ligações no LinkedIn
Veja os seus contactos na Scatec no LinkedIn e utilize a sua rede ao candidatar-se.
Ver as suas ligações