Descrição da função
Engineering Project Manager
£55,000 - £68,750 per year (DOE) plus an excellent benefits package and career progression/development opportunities.
Location: Cambuslang Office
Permanent / Full Time
Role
This role is responsible for coordinating the end-to-end delivery of engineering survey activities required to support Scottish Power Transmission projects. This includes defining survey requirements with engineering teams, obtaining contractor quotations, coordinating site access and safety requirements, managing survey delivery and ensuring the resulting information is suitable for the discipline engineering team.
Responsible for developing and coordinating the delivery of field survey activities that support detailed engineering designs for transmission networks (132kV and above) in Civil/Plant/P&C/OHL/Cables and other equipment. This will include providing the necessary basic and detailed engineering specifications technical support, advice, site liaison and input throughout the lifecycle of the project.
The role will act as primary interface between project teams, contractors and stakeholders to ensure field survey outputs are delivered safely, efficiently and in accordant with SPT requirements.
Lead the contractor performance management meetings for key supply partners - driving continuous improvement and contractor performance against KPIs.
Lead the internal site survey scheduling meeting with internal stakeholders.
What you'll be doing
Survey planning and coordination
-
Gather survey requirements from engineering/project teams.
-
Develop survey scopes and programmes.
-
Establish and maintain a 6-month lookahead.
Site delivery
-
Coordinate access, outages and site interfaces.
-
Ensure RAMS, access arrangements and safety requirements are established.
-
Monitor contractor delivery.
Commercial/procurement
-
Obtain quotations/tenders from framework suppliers.
-
Evaluate submissions.
-
Support purchase orders, cost management and change control.
Technical/quality
-
Ensure survey deliverables satisfy the engineering team's requirements.
-
Coordinate resolution of technical queries and incomplete information.
Supplier management
-
Manage relationships with approximately 10 framework suppliers.
-
Monitor safety, quality, cost, programme and service KPIs.
-
Lead supplier performance reviews and continuous improvement.
-
Produce departmental forecasts of survey demand across the engineering department.
In practice, you will work with our engineering teams to understand the site information needed, package those requirements into survey scopes, engage our framework survey suppliers, arrange the necessary site access and safety controls, coordinate delivery and ensure survey outputs are provided to the engineering teams on time and to the required standard.
You will be responsible for contractor performance management - leading regular performance review meetings with supplier delivery managers. You will own the department survey forecasting tools and provide regular stakeholder updates.
What you'll bring
Experience in managing external contractors and suppliers.
Experience in the planning, management and delivery of field survey activities.
Experience in performance management of contractors against safety, quality, cost and programme targets.
Good commercial understanding of engineering projects, cost control, budget management, pre and post tender best practices.
Proven experience in a responsible position and knowledge in one or more of the following areas from 33kV to 400kV:
Civil design
Main Plant design
Protection & Control design
OHL and cables design
Switchgear/Transformers/Transmission and distribution system design
Good inter-personal and communication skills and the ability to form effective working relationships with other individuals, departments and businesses.
Knowledge of health & safety requirements and compliance
Degree in Engineering discipline or equivalent experience.
Working towards membership of a professional institution.
Minimum Criteria
-
Engineering degree or equivalent experience
-
Site Experience in Site Construction works
Although not Mandatory, flexibility around the following would be preferred
- Requirement to undertake short trips away from home as required
- Flexibility in working hours to meet the needs of the job
What's in it for you
As well as a competitive salary which is reviewed annually, you can also enjoy a number of other benefits. With our pension scheme, we'll double match your contribution up to a company contribution of 10%.
At ScottishPower, we believe it's the little things we do in life that make a big difference. From helping you look after your family's wellbeing, save for your future and take personal steps for climate action - our benefits are designed to help you do just that - so that you have everything you need to take care of your world - today and tomorrow.
That's why our benefits include:
- 36 days annual leave
- Holiday Purchase - perfect your work/life balance with extra annual leave
- Share Schemes
- Payroll Giving and Charity Matched Funding
- Technology Vouchers - save more and spread the cost of your technology purchases
- Electric Vehicle Schemes - to help you transition to green/clean driving
- Cycle to Work scheme and Public Transport Season Ticket Loans
- Healthcare benefit options including: Dental Insurance, Private Medical Insurance, Health Cash Plan and annual Health Assessments
- Life Assurance (4x salary)
- Access to Savesmart financial wellbeing support
- Plus shopping, leisure, restaurant and gym discounts, and unique employee deals on travel insurance and more
We are committed to providing reasonable support or adjustments in our recruiting processes for candidates with disabilities, long term conditions, mental health conditions, or who are neurodivergent or require pregnancy-related support.
Mobility
Please note that any applicant who is not a citizen of the country of the vacancy will be subject to compliance with the applicable immigration requirements to legally work in that country. If/when required, the Company will support the employee with the necessary Immigration requirements.
Salário e benefícios
Sobre esta vaga
Sobre Scottish Power
Visão geral da empresa
Scottish Power Limited, subsidiária detida integralmente pela Iberdrola
cerca de 9.800 trabalhadores (2025); receitas de 6.516 milhões de libras em 2025
O que faz
A ScottishPower é a holding de um grupo que produz, transporta e distribui eletricidade e fornece eletricidade e gás, sobretudo no Reino Unido, através de três divisões: Energy Networks, Renewable production e Customer business. Foi a primeira empresa de energia integrada do Reino Unido a produzir 100 % da sua eletricidade a partir de fontes renováveis. A sua holding operacional, a Scottish Power UK plc, foi registada a 1 de abril de 1989 como South of Scotland Electricity plc e adotou o nome Scottish Power plc a 1 de agosto de 1989.
A Energy Networks gere quatro empresas reguladas de transporte e distribuição de eletricidade, cujos cabos, linhas elétricas e subestações servem cerca de 5,9 milhões de clientes ligados no Central Belt e no sul da Escócia, Cheshire, Merseyside, North Shropshire, norte do País de Gales, Cumbria e Lancashire. A SP Transmission é proprietária da rede de transporte, e as outras três empresas, entre elas a Electricity North West, são operadoras de redes de distribuição. Assim, a ScottishPower é o segundo maior operador de redes de distribuição do Reino Unido e leva eletricidade a cerca de 12 milhões de pessoas através de mais de 170.000 quilómetros de rede.
A Customer business fornecia gás e eletricidade a 4,2 milhões de clientes no final de 2025. Instala também bombas de calor, painéis solares, armazenamento em baterias e carregamento de veículos elétricos, com tarifários especiais para bombas de calor e carregamento de veículos elétricos e o primeiro plano nacional de manutenção anual de bombas de calor do Reino Unido.
Projetos e historial
A Renewable production desenvolve, constrói e explora centrais renováveis, sobretudo de energia eólica marítima e terrestre. Explora mais de 40 locais em terra, a par dos parques eólicos marítimos East Anglia One e West of Duddon Sands, num total de 3 GW de capacidade em operação. O East Anglia One pertence em 60/40 à ScottishPower e à Bilbao Offshore Holding Limited, e o West of Duddon Sands é explorado em conjunto com a Orsted Schroders Greencoat.
Em terra, o parque eólico renovado de Hagshaw Hill (80 MW) entrou em operação comercial a 31 de outubro de 2025: 14 novas turbinas substituíram as 26 originais, e o local tem agora cinco vezes a sua capacidade de produção original. A bateria de Harestanes (50 MW) entrou em operação comercial a 15 de setembro de 2025, e o parque eólico Kilgallioch Extension (51 MW) em março de 2026, com mais nove turbinas.
No mar, o East Anglia Three, de 1,4 GW, está a ser construído a 69 quilómetros da costa de Suffolk com 95 turbinas da Siemens Gamesa e é o primeiro projeto de eólica offshore do Reino Unido com pás de 115 metros. A primeira turbina foi instalada em abril de 2026, e o projeto de 4 mil milhões de libras é explorado em 50/50 com a Masdar desde que uma participação de 50 % foi vendida à Masdar em julho de 2025. A sua estação conversora marítima, a primeira da ScottishPower, é a maior alguma vez construída no grupo Iberdrola. O East Anglia Two está em fase de construção, que decorre de 2026 a 2028.
A carteira de projetos no Reino Unido até 2038 inclui cerca de 3 GW de eólica marítima na zona de East Anglia, a carteira ScotWind de 5 GW com o projeto flutuante MarramWind (3 GW) e o projeto de fundações fixas MachairWind (2 GW), e cerca de 5 GW de potenciais projetos de eólica terrestre, solar e baterias. Na rede, o Eastern Green Link 1, desenvolvido com a National Grid Electricity Transmission, vai ligar Torness, em East Lothian, a Hawthorn Pit, no condado de Durham, e a Siemens Energy é a concorrente preferida para as duas estações conversoras HVDC do Eastern Green Link 4.
Desenvolvimentos recentes
A Iberdrola apresentou em setembro de 2025 um plano estratégico de 58 mil milhões de euros com o Reino Unido como principal destino de investimento, e a ScottishPower está a investir 24 mil milhões de libras em cinco anos até 2028. Em dezembro de 2025, a determinação final da Ofgem aprovou os planos de investimento da ScottishPower de 12 mil milhões de libras na rede de transporte para o período 2026-2031. Em maio de 2025, o National Wealth Fund comprometeu 600 milhões de libras com a modernização da rede, no âmbito de um pacote de financiamento de 1,35 mil milhões de libras liderado pelo Bank of America que apoia sete projetos prioritários de transporte.
Em março de 2025, a Competition and Markets Authority autorizou a aquisição de uma participação de 88 % na Electricity North West, e cerca de 2.550 dos seus trabalhadores juntaram-se à ScottishPower ao longo de 2025. Em novembro de 2025, uma transação com a Shell deu à ScottishPower Renewables a propriedade total do projeto MarramWind.
Trabalhar na empresa
A ScottishPower recebeu mais de 1.000 novos trabalhadores desde que anunciou, em novembro de 2024, o crescimento do quadro de pessoal para 2025. Em setembro de 2025 entrou um número recorde de 338 diplomados e formandos, em funções que vão da engenharia à cibersegurança e à gestão de projetos, de Glasgow a Merseyside, ao norte do País de Gales e a Londres. Em 2025, a Energy Networks abriu um novo escritório em Edimburgo para as suas equipas de transporte de eletricidade, incluindo as que constroem ligações submarinas ao largo das costas leste e oeste da Escócia, e o grupo foi acreditado como 2025 Top Employer pelo Top Employers Institute.
Muitas funções permitem trabalho híbrido. As licenças familiares incluem 26 semanas com salário completo na licença de maternidade e adoção e 8 semanas com salário completo na licença de paternidade, e o programa «Your ScottishPower Benefits» permite escolher benefícios como o Share Incentive Plan, o programa Cycle to Work ou a compra de dias de férias adicionais.