Stillingsbeskrivelse
This position is responsible for leading the planning, design, and coordination of safe, efficient drilling and workover operations. It is a lifecycle well engineering role supporting drilling activities across the Concept Select, Define, and Delivery stages of Ormat's Well Delivery Process, with occasional support for workover, well logging, and well testing operations.
Responsibilities include ownership of engineering design and operational program development and execution; coordination of regulatory approvals; management of well costs and budgets; and continuous improvement of well engineering standards, policies, and procedures. The role is accountable for managing technical and operational risks, supporting real-time execution, and ensuring alignment across cross-functional teams. Provide drilling engineering expertise to support Ormat Indonesia and its joint venture operations. Contribute technical input and advisory support to cross-functional teams, including Business Development (BD), KTPB, and other departments, for the evaluation of new business opportunities, technical due diligence, project assessments, and external stakeholder engagements.
Responsibilities
- Lead collaboration across project teams including subsurface, drilling operations, procurement, and permitting to ensure aligned well delivery.
- Prepare and own detailed well programs, engineering designs, and execution strategies.
- Perform and validate engineering analysis (hydraulics, torque & drag, casing design, cementing, etc.) ensuring technical integrity.
- Identify, quantify, and manage well risks; develop contingency plans and decision frameworks for critical operations.
- Establish goals, schedules, and performance targets for drilling activities and ensure delivery against plan.
- Provide real-time engineering support during drilling operations, including optimization and structured problem-solving.
- Own drilling budgets, cost forecasting, and expenditure control; approve invoices and manage financial performance.
- Lead post-well reviews, identify performance gaps, and implement lessons learned into future designs and standards.
- Develop, maintain, and improve drilling standards, best practices, and engineering guidelines.
- Act as contract holder for multiple service lines; define scopes of work, KPIs, and drive vendor performance.
- Evaluate and implement new drilling technologies and techniques to improve efficiency and outcomes.
- Ensure full compliance with regulatory, environmental, and safety requirements; support permitting strategy as needed.
- Leverage and improve digital tools and systems (e.g., RimBase, Corva, Landmark, dashboards) to enhance planning, execution, and reporting.
- Mentor junior engineers and contribute to development of team capability and culture.
- Communicate complex technical concepts, risks, and recommendations clearly to management and stakeholders.
- Develop technical scopes of work, specifications, and tender documents for drilling services contracts and drilling-related procurements. Provide technical support throughout the procurement cycle, including bid evaluations, technical clarifications, vendor assessments, and contract award recommendations in coordination with the Procurement team.
- Provide drilling engineering expertise to support Ormat Indonesia and its joint venture operations.
- Technical input and advisory support to cross-functional teams, including Business Development (BD), KTPB, and other departments, for the evaluation of new business opportunities, technical due diligence, project assessments, and external stakeholder engagements.
- Collaborate with the Well Delivery team to provide drilling engineering support through real-time operations monitoring, drilling parameter trend analysis, engineering validation, and implementation of continuous improvement initiatives to enhance drilling performance, efficiency, and operational reliability.
Requirements
- Bachelor's degree in Engineering required.
- 8-15 years of relevant drilling engineering experience, with demonstrated ownership of well planning and execution.
- 2-3 years of Geothermal drilling experience.
- Experience supporting full well lifecycle activities across planning, design, and execution phases (Concept Select, Define, Delivery).
- Strong understanding of drilling engineering fundamentals, including well design, hydraulics, torque & drag, casing, and cementing.
- Demonstrated ability to identify, assess, and manage operational and technical risks.
- Proven ability to lead cross-functional coordination and deliver well programs safely, on schedule, and within budget.
- Strong project management, organizational, and problem-solving skills with a sense of ownership and urgency.
- Ability to support real-time operations and provide structured troubleshooting and decision-making during critical activities.
- Strong communication skills with the ability to clearly present technical information, risks, and recommendations to peers and management.
- Proficiency in standard business software (Microsoft Word, Excel, PowerPoint) and ability to learn and apply drilling engineering tools and systems (e.g., RimBase).
- Experience with industry drilling software (e.g., Landmark WellPlan, WellCAT) is a plus.
- Well Control certification (IWCF or IADC) preferred.
- Ability to work in a fast-paced environment with periods of high operational intensity.
- Willingness and ability to travel domestically and internationally, including occasional weekend and holiday support.
- Must possess a valid driver's license with a driving record acceptable to ORMAT's Safe Driving policy.
- Must be able to communicate effectively in English to safely and efficiently perform job duties.
Om stillingen
Om Ormat Technologies
Virksomhedsoversigt
Ormat Technologies, Inc., noteret på New York Stock Exchange (NYSE: ORA)
Reno, Nevada, USA
1965
Omkring 1.600 ansatte (udgangen af 2025); omsætning på 989,6 mio. dollar i 2025
Hvad de laver
Ormat er en geotermivirksomhed, der ejer, driver, designer, fremstiller og sælger geotermiske kraftværker og kraftværker til genvundet energi (REG), primært baseret på sin Ormat Energy Converter, en enhed, der omdanner varme ved lav, middel og høj temperatur til elektricitet. De kraftværker, Ormat har udviklet, fremstillet og bygget, og som selskabet ejer eller har installeret for forsyningsselskaber og udviklere verden over, udgør i alt omkring 3.600 MW bruttokapacitet. Den nuværende produktionsportefølje er på 1.853 MW: 1.358 MW geotermiske anlæg og solcelleanlæg i USA, Kenya, Guatemala, Indonesien, Honduras, Guadeloupe og Dominica samt 495 MW energilagring i USA.
Projekter og erfaring
I december 2025 satte Ormat Arrowleaf, sit første hybride anlæg med solceller og lager, i kommerciel drift med 42 MW solcellekapacitet og 35 MW/140 MWh lagring. I januar 2026 købte selskabet sit andet, Hoku-anlægget på Big Island på Hawaii, der kombinerer 30 MW solceller med et batteri på 30 MW/120 MWh, af Innergex Renewable Energy for 80,5 mio. dollar kontant. I marts 2026 gik batterilageret Shirk på 80 MW/320 MWh i Visalia i Californien i kommerciel drift.
I juli 2026 gik Ormats geotermiske kraftværk på 10 MW i Dominica i kommerciel drift, og i august 2026 besluttede selskabet at bygge energilageret Denali på 100 MW/400 MWh i Californien, som ventes færdigt ved udgangen af 2028 under en tolling-aftale på 20 år med Clean Power Alliance. I august 2026 havde Ormat elproduktionsprojekter på 202 MW under opførelse og udvikling, alle sikret med langsigtede elkøbsaftaler (PPA’er), plus energilagringsprojekter på 497 MW/1.888 MWh.
Seneste nyt
I januar 2026 underskrev Ormat en PPA på 20 år med Switch om cirka 13 MW geotermisk kapacitet til datacentre. I februar 2026 fulgte en langsigtet PPA med NV Energy om op til 150 MW ny geotermisk kapacitet til Googles aktiviteter i Nevada; projekterne ventes at komme i drift fra 2028 til 2030. Ormats vækstplan sigter mod at fordoble kapaciteten fra udgangen af 2025 og nå en årlig omsætningstakt på over 1,5 mia. dollar ved udgangen af 2030.
Ormat udvikler også enhanced geothermal systems (EGS). I januar 2026 investerede selskabet 25 mio. dollar i Sage Geosystems, og i dets to EGS-pilotprogrammer med SLB og Sage ventes boringerne at begynde i slutningen af 2026 eller i begyndelsen af 2027. Ormat vurderer, at dets EGS-arealer på omkring 170.000 acres kan bære 5 til 6 GW fremtidig EGS-udbygning.
I september 2026 udvalgte det amerikanske energiministerium Ormat til op til 35 mio. dollar i støtte sammen med SLB og University of Utah til EGS i Dixie Valley (Nevada) og hydrotermisk udbygning i Cove Fort (Utah). I juni 2026 præsenterede Ormat Ormega100, en binær enhed, der leverer 100 MW som ét samlet modul og er udviklet til de høje temperaturer i EGS.
At arbejde der
Ved udgangen af 2025 havde Ormat 797 ansatte i USA, 531 i Israel og 320 i andre lande. En stor del af topledelsen og de vigtigste produktions- og fremstillingsanlæg i produktsegmentet ligger i Israel. I november 2026 viste karrieresiden stillinger inden for reservoir engineering i Reno, job som anlægsoperatør i Fallon (Nevada) og stillinger som drifts- og vedligeholdelsesingeniør i Philadelphia.