Rejobs
Berde Renewables
Berde Renewables
3 åbne job · Opslået for 136 dage siden

Manager for tilladelser og overholdelse

Bliv Permitting and Compliance Manager hos Berde Renewables i Metro Manila. Led godkendelser og tilladelser for solprojekter med el-kooperativer. Håndter myndighedstilladelser, interessentrelationer og overholdelse for langsigtet drift. En central rolle i en voksende vedvarende energivirksomhed.

Løn
150.000–200.000 ₱/md.
Placering
Metro Manila, Filippinerne
Arbejdsplads
Fjernarbejde
Jobtype
Fuldtid
Ansøgning via e-mail til Berde Renewables

Tjek din indbakke.

På mobilen? Du kan ansøge fra en computer senere.

Stillingsbeskrivelse

Position Purpose

The Planning and Permitting Manager leads the planning, regulatory approval, and permitting workstream for solar embedded generation projects developed in partnership with electric cooperatives or other electric distribution utilities, including the EG-to-EC deal mechanism — cooperative power-supply procurement, National Electrification Administration (NEA) approval, and the Competitive Selection Process (CSP) or unsolicited-proposal route — that anchors each partnership. The role secures and maintains all national and local government permits, DOE/ERC regulatory approvals, and embedded generation partnership documentation required to develop, construct, and operate projects, while managing relationships with the National Electrification Administration (NEA), DOE,ERC, LGUs, and host electric cooperatives to ensure project development proceeds on schedule and in full regulatory compliance. Given Berde's Build-Own-Operate-Transfer (BOOT), ISQ-backed asset-ownership model, under which projects are owned and operated by the company for 20+ years, the role also carries ownership-lifecycle awareness — permitting, contracting, and compliance decisions must hold up over the full operating life of each asset, not just through COD. Upon hire, the role assumes continuity of the company's existing live permit and compliance tracker and all open regulatory filings, with a structured transition/overlap period to be completed before 31 August 2026.

Key Responsibilities

  • Develop and manage the end-to-end permitting roadmap and timeline for each embedded generation project, from site identification through to COD.
  • Lead and own the EG-to-EC deal mechanism — structuring cooperative power-supply procurement, securing National Electrification Administration (NEA) approval, and managing the Competitive Selection Process (CSP) or unsolicited-proposal route for each partner electric cooperative or electric distribution utilities.
  • Identify permitting, regulatory, land, and stakeholder risks early and develop mitigation plans to avoid schedule delays.
  • Lead the preparation and filing of DOE applications (Renewable Energy Service/Operating Contract, Certificate of Endorsement) and ERC applications (Certificate of Compliance, PSA/Connection Agreement approval, provisional authority where applicable).
  • Coordinate with the National Electrification Administration (NEA) and electric cooperative Boards/management on embedded generation partnership approvals, board resolutions, and cooperative-level regulatory requirements.
  • Secure environmental compliance certificates (ECC/CNC) with the DENR-EMB and manage related environmental impact assessment (EIA) requirements.
  • Obtain local government permits (business permits, locational clearances, building permits, barangay clearances, tree cutting permits) and manage relationships with LGU offices in project host areas.
  • Lead land acquisition/lease documentation, right-of-way negotiations, and community/social acceptability activities in coordination with local stakeholders and the host electric cooperative or electric utilities including landuse conversion permits and coordination with National Irrigation Administration
  • Lead permitting and regulatory workstreams for solar-plus-storage (battery energy storage system, BESS) projects, including storage-specific DOE/ERC/WESM filing requirements and environmental scoping, consistent with Berde's growing hybrid pipeline
  • Monitor and assess regulatory developments (EPIRA amendments, RE Act IRR updates, ERC/DOE circulars, Distributed Energy Resource (DER), Energy Storage Systems, Distribution/Grid Code revisions) and advise management on implications for embedded generation projects.
  • Maintain a centralized permit compliance tracker and ensure timely renewal of all licenses, permits, and regulatory filings for operating projects, inheriting and continuing the existing live tracker and all open regulatory filings upon hire, with a transition/overlap period completed before 31 August 2026 so that no filing or renewal lapses.
  • Represent the company in regulatory consultations, public hearings, and technical working group meetings with DOE, ERC, NEA, and electric cooperative associations (e.g., PHILRECA).
  • Manage a small team of planning/permitting officers and external counsel/consultants supporting regulatory filings.
  • Collaborate with internal teams to ensure technical, financial and corporate information align with regulatory filing requirements
  • Prepare management reports and executive presentations summarizing permitting status, regulatory risks, critical path activities, and recommended actions.

Qualification and Education

  • Bachelor’s degree in engineering, Environmental Science, Political Science, Law, or a related field.
  • A Law degree or units in Environmental Planning is an advantage, particularly for regulatory and permitting negotiations.
  • Additional training/certification in environmental compliance, urban/regional planning, or regulatory affairs is a plus.

Experience Requirements

  • At least 7–10 years of experience in permitting, regulatory affairs, or project planning within the Philippine energy sector.
  • Direct experience working with DOE, ERC, NEA, DENR-EMB, and LGUs on power generation or embedded generation project approvals.
  • Prior experience partnering with, or working within, an electric cooperative, rural electrification-related organization, or electric distribution utilities is strongly preferred.
  • Track record of successfully securing permits and regulatory approvals within committed project timelines.
  • Experience handling community relations, land acquisition, or right-of-way negotiations in provincial/rural project sites.
  • Experience with cooperative power-supply procurement processes, including the Competitive Selection Process (CSP) or unsolicited-proposal route, is strongly preferred.

Løn og goder

150.000–200.000 ₱ /md.

Om stillingen

Opslået
14 jul. 2026
Tidszone
UTC+08:00
Erfaring
7–10 years in permitting, regulatory affairs, or project planning within the Philippine energy sector
Arbejdsgiver berderenewables.com LinkedIn Berde Renewables

Om Berde Renewables

Virksomhedsoversigt

Berde Renewables Inc.; porteføljeselskab under I Squared Capital

Mandaluyong, Filippinerne

2023

Hvad de laver

Berde Renewables, grundlagt af Morris Zhou og Patrick Zhu, udvikler, bygger og driver decentrale projekter med vedvarende energi for erhvervs- og industrikunder. Dets tre kerneforretningsområder er solenergi bag måleren til erhverv og industri, indlejret produktion til elkooperativer samt opkøb og udvikling af projekter med ren energi, med aktiviteter i Filippinerne og Thailand. I sin model med elkøbsaftaler (PPA) finansierer, bygger, ejer og driver Berde solcelleanlæggene hos kunden i aftaleperioden, hvorefter ejerskabet overgår til kunden.

Virksomheden udsprang af Maoneng Philippines, som medstifter Patrick Zhu startede i 2017; i 2023 dannede Maoneng Philippines og I Squared Capital et joint venture og etablerede Berde, der ifølge eget udsagn kun bruger sol- og eludstyr i Tier 1-klassen. Dets solplatform bag måleren dækker Luzon, Visayas og Mindanao, og i fjerde kvartal 2026 havde det mere end 120 MW underskrevne projekter i drift eller under opførelse samt yderligere 200 MW under udvikling.

Projekter og erfaring

I oktober 2023 underskrev Berde en 20-årig elkøbsaftale med Holcim Philippines om solceller på tagene af cementfabrikkerne i Bulacan og La Union med en samlet kapacitet på 5,5 MWp og en forventet produktion på omkring 7,8 GWh om året; Berde kaldte det cementindustriens første solcelleprojekt på tage i Filippinerne. I april 2025 udvidede de to virksomheder partnerskabet til Holcims anlæg i Davao City og Lugait, Misamis Oriental, så den samlede kapacitet steg til 12,79 MWp.

I september 2024 aftalte Berde med Magic Group of Companies at installere et solcelleanlæg på 729 kWp på Magic Mall San Carlos i Pangasinan. I august 2025 underskrev det en elkøbsaftale på 8,4 MWp solenergi med KCC Malls og Biotech Farms, der omfatter KCC Mall Gensan, KCC Mall Marbel, KCC Mall Zamboanga og et agroindustrielt anlæg hos Biotech Farms i South Cotabato; Berde finansierer anlæggene og står for projektering, indkøb og opførelse samt drift og vedligeholdelse. I april 2026 satte Big E Food Corporation, producent af Lemon Square, et taganlæg på 1,685 MWp i drift på sin fødevarefabrik i Bulacan, bygget under en 25-årig build-own-operate-transfer-aftale.

Seneste nyt

I oktober 2026 satte Datian Subic Shoes 3,06 MWp solceller på tagene af sine to fabrikker i Subic Bay i drift, udviklet, finansieret og drevet af Berde under en 20-årig build-own-operate-transfer-aftale. I juli 2026 indgik Berde en rammeaftale med Sungrow og dets regionale distributør Solar Hive om over tre år at indkøbe 200 MW solcelleinvertere og 500 MWh systemer til batterilagring til projekter i Filippinerne og Thailand.

I marts 2025 dannede Berde et joint venture med Power Systems and Solutions Co. Ltd. (PSS) i Thailand med det mål at udvikle, eje og drive 300 MW projekter med vedvarende energi over tre år. Ved Solar Quarter Week PH 2025 Leadership Awards blev Berde kåret som Solar Company of the Year: Developer.

At arbejde der

Berdes chef for asset operations leder afdelingerne for sundhed, sikkerhed, miljø og kvalitet, ingeniørarbejde og design, projektledelse og byggeri samt drift og vedligeholdelse, og virksomheden har også en Commercial & Development Division. Kontoret ligger i The Podium West Tower i Mandaluyong. På sin hjemmeside skriver Berde, at det altid leder efter talentfulde folk, og opfordrer kandidater til at fortælle, hvad de søger.

Flere lignende sol-job

Manager for tilladelser og overholdelse
Berde Renewables · 150.000–200.000 ₱/md.