Stillingsbeskrivelse
At Canadian Solar, our vision is to make lives better by bringing electricity powered by the sun to millions of people worldwide. As a leading manufacturer of solar panels, inverters, and energy storage solutions, we've been an industry front-runner since our founding in 2001. Our commitment to sustainability is reflected in all parts of our organization as we navigate the complexities of a booming industry.
Throughout Canadian Solar's subsidiaries, e-Storage, Recurrent Energy, MSS and CSI Solar Co., we invest in our employees' growth. Our training programs and promotional opportunities ensure we all can continue to learn. We understand the importance of work-life balance and provide various flexible work options to support our employees' well-being. Join our team to "Make the Difference" by creating a lasting positive impact on the world and the communities where we operate.
Purpose
Acts as the regional senior technical specialist for power systems and product commissioning across the UK BESS fleet. Leads product commissioning of e-STORAGE products (SolBank, string inverters, MVSkids etc) to OEM standard, leads HV/MV maintenance and safety activities across e-STORAGE and third-party fleets (i.e. SMA, Power Electronics) and develops the competency of the wider service team to support HV/MV works.
Scope Definition: Product Commissioning
This role leads product commissioning of e-STORAGE products: commissioning of e-STORAGE power conversion and MV equipment to OEM standard, including first power-on initialization parameters, product-level testing, and return-to-service. The site Commissioning (Cx) team retains overall site and project commissioning ownership, including the energisation programme, grid compliance and G99 testing, punch lists, and client handover. The Power Systems Technician works within the site Cx team's sequence: the Cx team owns the programme and the date; Power Systems owns the product Cx, safety documents, and product-level sign-off within it.
MV/HV Authorisation & Control of Work
Control of work and HV authorisation are determined by contract and project phase:
- During commissioning, the EPC (or Principal Contractor) is responsible for site control of work and HV authorisation. This role operates within the EPC's safe system of work and provides product-level expertise.
- During LTSA operations, the HV authorisation and control-of-work model is defined in each contract and varies by site (client-appointed, third-party, or CSE-held). This role provides the trained, competent personnel for appointment where CSE holds or is delegated that responsibility.
- Where a third party holds HV authorisation for a site, this role coordinates, supervises interfaces, and delivers the product-level technical work within their control regime.
Key Responsibilities
Product Commissioning (e-STORAGE products)
- Lead product commissioning of e-STORAGE products across UK LTSA sites (SolBank, string inverters, MVSkids and associated MV plant) to OEM standard and project scope.
- Own and set first power-on initialization parameters (OEM-trained personnel requirement per product manuals); incorrect settings risk equipment damage and certification non-compliance.
- Own product commissioning standards, procedures, test records, and documentation packs; ensure consistency across all UK projects.
- Provide product-level technical support to the site Cx team during energisation.
- Support the site Cx team during SAT and witness testing; provide product-level technical sign-off.
HV/MV Operations & Safety
- Competent for appointment to carry out MV/HV isolations, earthing, and safety document duties under the prevailing site safe system of work, as a mandatory precursor to intrusive PM/CM works. Site HV authorisation arrangements are defined per contract and phase (see MV/HV Authorisation & Control of Work).
- Carry out operational HV/MV switching during the service phase, including switching for planned PM outages, CM interventions, and restoration on return to service, where CSE holds control of work under the contract.
- Provide HV/MV support to the service team during PM and CM activities: isolations, earthing, switching, and safe access where service team work interfaces with HV/MV plant.
- Lead HV/MV preventative maintenance across CSE, SMA and Power Electronics MV skids, RMUs, transformers, and protection systems per OEM schedules.
- Lead corrective maintenance and fault investigation on HV/MV equipment: root cause analysis, rectification and return to service.
- Provide safety leadership and oversight for all HV/MV activities in region, including supervision of third-party HV contractors where used.
Technical Expertise & Capability Building
- Subject-matter expert across all inverter platforms (CSE string inverters, SMA, Power Electronics) for HV/MV maintenance activities; product commissioning expertise applies to e-STORAGE products.
- Assess and develop service team competency for HV/MV support roles; deliver toolbox talks, training, and authorisation recommendations.
- Feed field learnings back into standards, RAMS/SOPs, and OEM escalations.
Requirements
- Trained and competent for MV/HV activities to 33kV; capable of appointment under company or client operational rules as contracts require.
- Time-served electrical background with utility-scale BESS or solar commissioning experience.
- Working knowledge of MV switchgear, transformers, and protection systems.
- Familiarity with G99 requirements sufficient to support the site Cx team during compliance testing.
- Full UK driving licence; regional and occasional national travel.
Typisk løn for lignende job
EstimatDen midterste halvdel af lønninger annonceret på Rejobs i denne gruppe de seneste 24 måneder. Arbejdsgiveren har ikke oplyst en løn.
Om stillingen
Om Canadian Solar
Virksomhedsoversigt
Canadian Solar Inc., børsnoteret på Nasdaq siden 2006
Kitchener, Canada
2001
Omkring 12.600 fuldtidsansatte (ved udgangen af 2025); nettoomsætning på 5,6 mia. dollar i 2025
Hvad de laver
Canadian Solar fremstiller solcellemoduler, leverer løsninger til solenergi og batterilagring og udvikler sol- og lagringsprojekter i stor skala. Segmentet Manufacturing består af CS PowerTech, der fremstiller og sælger sol- og batterilagringsprodukter til det amerikanske marked, og CSI Solar, der betjener alle andre markeder. Segmentet Recurrent Energy udvikler og sælger sol- og batterilagringsprojekter, leverer driftsydelser og tjener penge på strøm fra sin portefølje af anlæg i drift. Canadian Solar ejer omkring 64 % af CSI Solar, sit vigtigste operative datterselskab i Kina.
På 25 år har Canadian Solar leveret næsten 180 GW solcellemoduler verden over. Lagringsforretningen e-STORAGE havde pr. 30. juni 2026 leveret mere end 23 GWh batterilagring og havde en kontraheret ordrebeholdning på 3,5 mia. dollar. Ved udgangen af 2025 forvaltede Recurrent Energy omkring 15 GW sol- og batterilagringsprojekter under drifts- og vedligeholdelseskontrakter.
Projekter og erfaring
Siden Canadian Solar gik ind i projektudvikling i 2010, har selskabet udviklet, bygget og nettilsluttet omkring 12,4 GWp solcelleprojekter og 6,4 GWh batterilagringsprojekter. Pr. 30. juni 2026 rummede udviklingsporteføljen omkring 22 GWp sol og 84 GWh lagring.
I Californien har Crimson Energy Storage Project på 350 MW / 1.400 MWh i Riverside County været i drift siden 2022 under to lagringskontrakter med lokale forsyningsselskaber. I Arizona har projektet Papago Storage på 300 MW / 1.200 MWh nær Tonopah været i kommerciel drift siden 2025 under en 20-årig tolling-aftale.
I Spanien gik solcelleparken Villameca på 200 MWp i Castilla y León i kommerciel drift i oktober 2026 og supplerer det nyligt indviede Rey Solar Project på 426 MWp i Andalusien. I Australien gik Carwarp Energy Park på 150 MWac nær Mildura i Victoria i kommerciel drift i august 2026 med en langsigtet elkøbsaftale med Microsoft.
Seneste nyt
Canadian Solar åbnede sit nye globale hovedkontor i Kitchener, Ontario, den 15. januar 2025. Den 1. december 2025 meddelte selskabet, at det ville genoptage det direkte tilsyn med sine amerikanske aktiviteter med en ejerandel på 75,1 % i CS PowerTech, et nyt joint venture med CSI Solar. Den 14. maj 2026 blev Colin Parkin administrerende direktør, og stifteren Shawn Qu gik fra posten som bestyrelsesformand og CEO til rollerne som arbejdende bestyrelsesformand og teknologidirektør.
I juli 2026 åbnede Canadian Solar første fase af sin HJT-solcellefabrik i Jeffersonville, Indiana, med en nominel kapacitet på 2,1 GWp, den første HJT-cellefabrik i kommerciel skala i USA. Modulfabrikken på 5 GWp i Mesquite, Texas, udvides til 10 GWp og ventes færdig i andet halvår 2026. I andet kvartal 2026 faldt leverancerne af moduler med 60 % på årsbasis til 3,1 GW, mens leverancerne af batterilagring steg med 73 % til 3,7 GWh.
I august 2026 rejste Recurrent Energy 695 mio. dollar i projektfinansiering og tax equity til sit projekt Cobalt Solar på 330 MW i Riverside County, Californien. I oktober 2026 solgte selskabet to batterilagringsprojekter i Frankrig, Baixas og Coquainvilliers på hver 100 MW / 400 MWh, til BW ESS.
At arbejde der
Antallet af fuldtidsansatte i Canadian Solar faldt fra 22.234 ved udgangen af 2023 til 12.587 ved udgangen af 2025. På det tidspunkt arbejdede 2.061 ansatte i USA, 9.187 i Asien og Stillehavsområdet inklusive Kina og 1.339 i Europa og andre regioner. Kontoret i Kitchener rummer koncernens hovedkontor, e-STORAGE og forretningsenhederne for modulsalg og service.
I Europa har Recurrent Energy kontorer i Milano, Madrid, Amsterdam, Warszawa og London. I USA matcher Canadian Solar i sin 401(k)-ordning 100 % af de første 5 % af medarbejdernes indbetalinger, og ansatte på alle niveauer kan deltage i virksomhedens kurser og uddannelsesprogrammer, fra klasseundervisning og e-læring til coaching og mentorordninger.