Stillingsbeskrivelse
Position Specific Description
This position sits within the Power Generation Division which is responsible for all of NextEra Energy's non-nuclear generation operations, exceeding 40,000 megawatts (MW) of installed capacity. This position will be based in the Western/ Rochester, NY area. The intended employee will be responsible for the operation and maintenance of solar PV collection assemblies, battery energy storage, AC/DC inverters on multiple solar power plants to achieve safe, efficient, and environmentally sound plant operations.
In this role, an employee will maintain all tools, shops, vehicles, and all work locations in a safe and efficient condition, provide inspections of watch, electrical, mechanical, and electronic trouble shooting for a solar arrays and inverters.
Inspection is performed daily for fluid system breaches, mechanical component breakage or misalignment, and electrical component failures preventing inverters from producing grid power.
A candidate would be responsible for supporting teammates in nearby states in the region, and maintaining reliability, operations and maintenance for sites assigned area
Job Overview
The Site Technician will support the Regional Manager or designee to ensure the perfect execution of the PGD processes. Site Technicians in a solar region perform duties in the following but are not limited to safety, contractor management, electrical/electronic/mechanical equipment operation, troubleshooting, and maintenance, overall site operations, asset management and regulatory compliance, reliability engineering, and inventory management.
Job Duties & Responsibilities
- Reliability engineering
- Warranty management
- Operation and basic maintenance
- Electrical and power electronics troubleshooting and repairs
- Safety and Environmental program stewardship
- Supervisory duties of NEE employees and contractors
- Mechanical troubleshooting and repairs
- Business duties and Inventory management
- Heavy equipment operation
- Regulatory compliance
- Performs other job-related duties as assigned
Required Qualifications
- High School Grad / GED
- Experience: 3+ years
- Valid Driver's License (NON CDL)
Preferred Qualifications
- Trade School Graduate
- Licensed Electrician
- Licensed Master Electrician
- Six Sigma Yellow Belt Certified
The estimated base pay for this position is $72,800.00 to $109,200.00 per year. Starting pay will be based on several factors including, but not limited to, experience, qualifications, job-related and industry knowledge and skills and education/training.
NextEra Energy offers a wide range of benefits to support our employees and their eligible family members. Click here to learn more.
Employee Group: Non Exempt
Employee Type: Full Time
Job Category: Technicians - Wind/HV/Solar
Organization: NextEra Energy Operating Services, LLC
Relocation Provided: Yes, if applicable
NextEra Energy is an Equal Opportunity Employer. Qualified applicants are considered for employment without regard to race, color, age, national origin, religion, marital status, sex, sexual orientation, gender identity, gender expression, genetics, disability, protected veteran status or any other basis prohibited by law.
NextEra Energy provides reasonable accommodation in its application and selection process for qualified individuals, including accommodations related to compliance with conditional job offer requirements, consistent with federal, state, and local laws. Supporting medical or religious documentation will be required where applicable and permitted by applicable law. To request a reasonable accommodation, please send an e-mail, providing your name, telephone number and the best time for us to reach you.
NextEra Energy will not discharge or in any other manner discriminate against employees or applicants because they have inquired about, discussed, or disclosed their own pay or the pay of another employee or applicant. However, employees who have access to the compensation information of other employees or applicants as a part of their essential job functions cannot disclose the pay of other employees or applicants to individuals who do not otherwise have access to compensation information, unless the disclosure is (a) in response to a formal complaint or charge, (b) in furtherance of an investigation, proceeding, hearing, or action, including an investigation conducted by the employer, or (c) consistent with the contractor's legal duty to furnish information.
NextEra Energy does not accept any unsolicited resumes or referrals from any third-party recruiting firms or agencies. Please see our policy for more information.
Løn og goder
Om stillingen
Om NextEra Energy
Virksomhedsoversigt
NextEra Energy, Inc., børsnoteret på New York Stock Exchange (NYSE: NEE)
Juno Beach, Florida, USA
Ca. 17.400 medarbejdere ved udgangen af 2025; driftsindtægter på 27,4 mia. dollar i 2025
Hvad de laver
NextEra Energy havde ved udgangen af 2025 ca. 80 GW nettokapacitet til produktion og lagring. Forsyningsselskabet Florida Power & Light (FPL) begyndte at levere strøm i Florida i 1925 og er det største elselskab i Florida og USA; det forsyner ca. 12 millioner mennesker via mere end 6 millioner kundekonti. FPL driver 120 solcelleparker i Florida med en kapacitet på ca. 8.826 MW, som selskabet betegner som USA’s største portefølje af solenergi i forsyningsskala.
NextEra Energy Resources (NEER) udvikler, bygger og driver produktionsanlæg med langsigtede kontrakter, blandt andet inden for vedvarende energi, kernekraft og naturgas, samt batterilagre. Ved udgangen af 2025 havde NEER ca. 37.505 MW nettoproduktionskapacitet i 44 amerikanske delstater og fire canadiske provinser.
Nettokapaciteten inden for vind var ca. 22.404 MW i 23 delstater og fire provinser og inden for sol ca. 10.504 MW i 35 delstater, og dertil kom ca. 5.177 MW batterilagring i 18 delstater og én provins. NEER og FPL driver syv kernereaktorer på fire anlæg: Turkey Point og St Lucie i Florida, Seabrook i New Hampshire og Point Beach i Wisconsin.
Projekter og erfaring
Amite Solar, et anlæg på 100 MW i Tangipahoa Parish, gik i kommerciel drift i marts 2025 som NEER’s første energianlæg i forsyningsskala i Louisiana. I november 2025 fejrede NEER driftsstarten på Appleseed Energy Center, et solcelleanlæg på 200 MW i Cass County, Indiana. I juli 2026 fejrede selskabet sammen med Consumers Energy driftsstarten på Century Oaks Energy Center, et batterilager på 200 MW i Huron County, Michigan.
Seneste nyt
I maj 2026 annoncerede NextEra Energy og Dominion Energy planer om at fusionere i en ren aktietransaktion til en værdi af ca. 66,8 mia. dollar; det samlede selskab skal drives under navnet NextEra og have to hovedkontorer, i Richmond, Virginia, og Juno Beach, Florida. Aktionærerne i begge selskaber godkendte fusionen i september 2026. Handlen afventer stadig myndighedsgodkendelser, og selskaberne forventer at gennemføre den i andet halvår af 2027.
I december 2025 annoncerede NextEra Energy og Google Cloud et partnerskab om at udvikle flere nye datacentercampusser i gigawattskala med tilhørende produktion og kapacitet; de to selskaber havde allerede ca. 3,5 GW i drift eller under kontrakt. Samme måned nåede NEER og Meta op på ca. 2,5 GW kontrakter om ren energi gennem 11 elkøbsaftaler og to lageraftaler, fordelt på 13 projekter, der efter planen tages i drift mellem 2026 og 2028.
I oktober 2025 underskrev Google og NextEra Energy en 25-årig aftale om strømmen fra kernekraftværket Duane Arnold i Iowa. NextEra Energy planlægger at genstarte værket på 615 MW i Linn County senest i første kvartal af 2029, forudsat myndighedsgodkendelser, og indgik i september 2026 en endelig låneaftale med det amerikanske energiministerium på op til 1,9 mia. dollar til genstarten. I august 2026 indgik selskabet endelige aftaler med det amerikanske handelsministerium og Japans regering om at finansiere opførelse og drift af op til 10 GW gasfyret produktion i Texas og Pennsylvania.
At arbejde der
NextEra Energys karriereside viser job inden for regnskab og økonomi, ingeniørarbejde, IT, kernekraft, eldistribution og elproduktion, til linjemontører og kabelmontører samt praktikpladser for studerende. Ved udgangen af 2025 havde FPL ca. 9.400 medarbejdere, hvoraf ca. 30 % var repræsenteret af International Brotherhood of Electrical Workers (IBEW). NEER havde ca. 7.900 medarbejdere.