Stellenbeschreibung
Overview
Grid & HV Project Manager Bucharest
Why this role matters
The position will be responsible for all the commercial and technical deliverables from project structuring through to technical handover on the Interconnection Works (MV Switchgear, HV substations and OHLs) for a dedicated Scatec project, or portfolio of linked projects. The position will build a strong relationship with EETC teams to move project Gerid Connection Agreements forward efficiently.
Lead the interfacing with EETC and other consultants on matters related to the interconnection of the renewable energy and process projects to the grid.
Lead the team in the drafting and review of relevant documents to ensure the technical requirement of the projects and Grid Connection Contracts are complied with.
The position will transition to lead the tendering, selection and execution of turnkey EPC substation deliveries on behalf of the Scatec project execution team. Throughout execution the position will be responsible for ensuring EETC compliant substations are delivered on time, connected to grid securing the necessary approvals from EETC.
What you'll be doing
Support to Structuring Phase of projects
- Lead the contracting and delivery of substation EPC packages including any early engineering and approvals processes.
- Monitoring and facilitating the review of the Contractors detailed design, ensuring compliance with Scatec functional requirements, site and permit and licensing conditions, local codes, EETC specifications and industry best practice
- Define and ensure that the project programme is reasonable and accurately considers the detailed Design Timeline, key equipment procurement and allowance for commissioning, testing and local Grid Connection requirements. Ensure that the grid connection and substation delivery timelines meet the overall renewable energy plant commissioning timeline.
- Manage and interface with contractors and equipment suppliers to establish, negotiate and align all technical aspects / approvals of the project.
- Manage the complete Utility interface process on behalf of Scatec from approval of detailed design, through construction, and completion under the Grid Connection Agreement / EPA
- Establish timelines and schedules based on the project schedule and contracts to ensure successful interconnection, commissioning, and grid code compliance.
- Assist the PM to establish and mitigate technical and commercial risks through an effective and updated Risk management system.
- Conduct site assessments accurately and timeously based on the information provided
- Support in evaluating the technical information and provide input to site selection and early phase project development and concept design amongst others
- Support in completing design packages related to the grid connections
- Lead in securing proper grid connection contracts and cascading back-to-back requirements to execution phase subcontracts - namely Substation EPC Contracting.
- Interface with EETC and other stakeholders to establish the project parameters and technical requirements
Support to projects in delivery/execution
- As the project moves into execution, the role is a continuation and development on the above:
- Manage and assess design change requests to be approved by the Lead Engineer and Senior Project Manager
- Manage, clarify and agree interfaces towards the grid and the grid operator
- Management of Governmental/Public/Grid Operator Stakeholders with approval process related to technical and commercial documentation and permits, licenses, authorizations, concessions needed during the execution of the HV and TX scope until commercial operations
- Lead project meetings with contractors and utilities.
- Be on site / visit site on a regular basis to ensure that construction is being implemented as per the design, utility requirements and in line with relevant technical standards and desired quality.
- Manage EPC Contractors in the delivery of griud connections and substations, with integration to RE plants.
- Build a small and efficient team to supervise the delivery and construction of substations under EPC Contracts.
- Provide early warning to the Senior PM on any issues in the project that may influence connection dates or the quality of the final product
- Contribute to drafting the relevant project reports (Bi-weekly, monthly etc.).
- Establish the plant commissioning and utility compliance plans and procedures.
- Plan and manage the Grid Code Compliance tests on site.
- Support in project close out phase by preparing and gathering technical documents as needed to achieve TTO on time.
- Assist in establishing and evaluating quality expectations and documentation during construction.
- Represent Scatec in the Operating Committee and EETC activities w.r.t. deliverables for Grid Code compliance and COD.
- Ensure lessons learned are transferred between different project sites.
- Ensure designs are implemented based on the at least the following documents:
- Detailed Engineering Drawings and Specifications
- Supplier Equipment Manuals
- Lead contract management of subcontractors with the Scatec procurement team.
- Assist in testing and commissioning activities towards Commercial Operation Date
Lead the project close out phase towards taking over of subsrtations and energisation.What you'll bring:
- Degree in Electrical / Electronical or Electromechanical Engineering
- 7+ year of Project Engineering experience - Minimum 5 years' experience in construction projects with Sub Stations and Transmission Lines
- Previous experience on handling communication with local utility and other relevant authorities and stakeholders
- An excellent knowledge of MS Office
- Based in Country and able to travel to site frequently.
- Fluent in both English and Romanian
- Driver's License
- An excellent knowledge of MS Office Ideal:
- Project Management Certificate
- Commissioning and tests of High Voltage Networks and Sub-Stations
- Masters Degree in Engineering
As a general note, the position is not expected to be an expert in the detailed design of Grid Connections, or in Line design, but is expected to be well versed and understand core elements of the design philosophy of the plant.
Similarly, not expected to be a legal expert but should have a clear experience and understanding of how Contracts are executed.
What you'll gain
- Professional growth through ownership, exposure, and meaningful contribution from day one
- Hands-on experience in a role where the challenge is energising, fast-moving, meaningful, and built on learning through doing.
- Broader commercial understanding through close collaboration with cross-functional teams
- Stronger financial, performance, and decision-support skills in a real-world context
If you are motivated by analysis with purpose, commercial insight, and real operational impact, this could be a strong next step in your career.
What we offer
At Scatec, you will be part of a company with a clear and ambitious purpose, working on renewable energy solutions that make a lasting difference. You will gain responsibility early, learn from experienced colleagues, and build your capabilities in a business that offers global exposure, strong development opportunities, and meaningful work in the energy transition.
Scatec is an equal opportunity employer. All qualified applicants will receive consideration for employment based on merit, competence, and business needs.
We review applications on an ongoing basis.
Shall understand EETC grid connection approval, permitting, commissioning and contracting processes.
Über diese Stelle
Über Scatec
Unternehmensüberblick
Scatec ASA, ein börsennotierter norwegischer Energieerzeuger und Projektentwickler, gelistet an der Euronext Oslo
HauptsitzOslo, Norwegen
Gegründet2007
GrößeCa. 750 Mitarbeiter weltweit (Quelle: pitchbook.com). Umsatz von NOK 4,37 Milliarden im Jahr 2024 (Quelle: stockanalysis.com).
Was sie tun
Scatec ASA ist spezialisiert auf die Entwicklung, den Bau, den Besitz und den Betrieb großflächiger Energieanlagen mit dem Schwerpunkt auf netzgebundenen Solar-Photovoltaik(PV)-Systemen und Batteriespeicherlösungen. Im Laufe der Zeit hat das Unternehmen sein Technologieportfolio erweitert und umfasst nun auch Wasserkraft und ausgewählte grüne Wasserstoffprojekte, bei denen Elektrolyseure zur Unterstützung von Power-to-X-Initiativen integriert werden (Quelle: scatec.com). Ihr Geschäftsmodell kombiniert betriebene Anlagen, die EBITDA generieren, mit einer robusten Pipeline von Projekten im Bau oder in der Vorbereitungsphase, die sich über mehrere Kontinente erstrecken, darunter Europa, Afrika, Lateinamerika und Asien (Quelle: scatec.com). Scatec bedient eine vielfältige Kundschaft, darunter Regierungen, staatliche Versorgungsunternehmen, industrielle Abnehmer und Projektfinanzierungspartner, und sichert sich häufig langfristige Stromabnahmeverträge (PPAs), die die Wirtschaftlichkeit der Projekte absichern (Quelle: live.euronext.com). Ihr integrierter Ansatz als Entwickler und Betreiber mit einer globalen Multi-Gigawatt-Pipeline sowie einer Mischung aus operativen Cashflow-Anlagen und Projekten in der Bauphase hebt sie im Bereich der erneuerbaren Energien hervor (Quelle: scatec.com).
Projekte & Erfolgsbilanz
Das Portfolio von Scatec umfasst einige der weltweit größten hybriden Solar- und Speicherprojekte, wie die Anlage in Kenhardt, Südafrika, die 540 MW Solar-PV mit 225 MW/1.140 MWh Batteriespeicher kombiniert und damit einen bedeutenden Meilenstein bei integrierten erneuerbaren Energieanlagen darstellt (Quelle: scatec.com). Allein in Südafrika betreibt das Unternehmen 730 MW Solar- und Speicheranlagen mit einem wirtschaftlichen Anteil von 49 % (Quelle: scatec.com). In Brasilien betreibt Scatec 693 MW Solarleistung mit einem wirtschaftlichen Anteil von 33 % und hat den Bau des 142 MW Urucuia-Solarprojekts begonnen, das durch einen 10-jährigen PPA mit Statkraft Energia do Brasil abgesichert ist (Quelle: live.euronext.com). Das Portfolio auf den Philippinen umfasst 673 MW Wasserkraft- und Speicheranlagen mit einem wirtschaftlichen Anteil von 50 %, darunter fortgeschrittene Batteriespeicherprojekte wie Binga und Magat, jeweils mit 56 MW/56 MWh (Quelle: scatec.com). In Botswana nahm Scatec im März 2025 den kommerziellen Betrieb einer Solaranlage auf und hält das Solaranlagenprojekt Mmadinare Phase 1 im Betriebsportfolio (Quelle: live.euronext.com). Das Unternehmen sicherte sich außerdem eine 288 MW Solar-PV-Zusage und ein Batteriespeicherprojekt in Südafrika durch staatliche Ausschreibungen Ende 2024 bzw. Mitte 2025 (Quelle: live.euronext.com). In Ägypten unterzeichnete Scatec einen wegweisenden 25-jährigen PPA für ein 1,1 GW Solar- plus 100 MW/200 MWh Batteriespeicherprojekt und treibt die Egypt Green Hydrogen-Initiative voran, die 260 MW Solar- und Windkapazität sowie einen 100 MW Elektrolyseur umfasst, mit Ammoniak-Abnahmeverträgen (Quelle: zawya.com). In Tunesien begann das Unternehmen mit dem Bau der Solarprojekte Tozeur und Sidi Bouzid, hält einen Anteil von 51 % an der 88-Millionen-Dollar-Investition, die durch einen 25-jährigen PPA unterstützt wird (Quelle: zawya.com). Dieser geografisch vielfältige Projektbestand unterstreicht Scatecs strategisches Wachstum auf mehreren Kontinenten (Quelle: scatec.com).
Aktuelle Entwicklungen
Im Verlauf von 2024 und 2025 hat Scatec kontinuierlich neue Stromabnahmeverträge, Projektstarts und Meilensteine bei der kommerziellen Inbetriebnahme in wichtigen Märkten wie Brasilien, Südafrika, Tunesien, Botswana und Ägypten bekannt gegeben (Quelle: live.euronext.com). Zu den bemerkenswerten Highlights zählen der 142 MW PPA in Brasilien im April 2024, die 288 MW Solarzusage in Südafrika im Dezember 2024 und der 120 MW PPA in Tunesien im März 2025 (Quelle: live.euronext.com). Im März 2025 nahm Scatec den kommerziellen Betrieb einer Solaranlage in Botswana auf und sicherte sich einen Solar-plus-Speicher-PPA mit Egypt Aluminium, wodurch die Präsenz in Afrika weiter ausgebaut wurde (Quelle: live.euronext.com). Das Unternehmen gewann im Mai 2025 ein Batteriespeicherprojekt in Südafrika und begann im selben Monat mit dem Bau des Solar-plus-BESS-Projekts in Ägypten (Quelle: live.euronext.com). Zudem erhielt Scatec im Oktober 2024 eine Förderung in Höhe von 30 Millionen Euro vom PtX Development Fund zur Unterstützung des Egypt Green Hydrogen-Projekts, das 2025 mit einem Ammoniak-Abnahmevertrag mit Fertiglobe die finale Investitionsentscheidung anstrebte (Quelle: mees.com). Der Jahresbericht 2024 und die Investorenpräsentationen 2025 betonen eine wachsende Basis an Betriebsanlagen, eine stärkere EBITDA-Generierung und einen strategischen Fokus auf Solar-, Speicher- und Wasserstofftechnologien (Quelle: scatec.com).
Arbeiten bei Scatec
Scatec bietet Karrieremöglichkeiten in einem breiten Spektrum von Funktionen, darunter Projektentwicklung, Engineering, Bauleitung, Betrieb und Wartung, Handel und Marktzugang, Finanzen, Recht, ESG und Berichterstattung, Beschaffung sowie Unternehmenssupport – was die Komplexität ihres integrierten Geschäftsmodells für erneuerbare Energien widerspiegelt (Quelle: scatec.com). Das Unternehmen ist global präsent mit Büros und Projektstandorten in Oslo, Südafrika, Brasilien, den Philippinen, Ägypten, Tunesien und Botswana und bietet Fachkräften vielfältige geografische Möglichkeiten (Quelle: scatec.com). Scatec legt Wert auf Führungskräftevielfalt, mit 32 % Frauenanteil in Führungspositionen im vierten Quartal 2025, und priorisiert Sicherheit mit einer Unfallrate von 0,6 verlorenen Arbeitsstunden pro Million geleisteter Arbeitsstunden, was auf eine starke Sicherheitskultur und formale Managementsysteme hinweist (Quelle: marketscreener.com). Die mittelgroße internationale Struktur des Unternehmens unterstützt sowohl erfahrene Energieexperten als auch Mitarbeiter im Unternehmensbereich und fördert ein dynamisches und inklusives Arbeitsumfeld (Quelle: pitchbook.com).
Ihre Verbindungen auf LinkedIn
Sehen Sie sich Ihre Kontakte bei Scatec auf LinkedIn an und nutzen Sie Ihr Netzwerk bei der Bewerbung.
Verbindungen anzeigen