Job description
A Day in the Life
- Leading safety and quality initiatives at a site level
- Developing, reviewing, and managing owner contracts and subcontracts
- Managing costs and scheduling labor, materials, tools, equipment, and subcontractors
- Constant communication with the owner/client about progress and conflict management
- Traveling to the jobsite (minimum 50% required travel)
What You'll Need
- Experience managing self-perform construction projects with a minimum budget of $30M
- Exceptional customer and client relation skills
- Knowledge of schedule and budget creation, control, and monitoring
- Contract and subcontract development and management experience
- Valid driver's license with an acceptable motor vehicle driving record (MVR)
What Will Set You Apart
- Financial forecasting experience (estimates to and at completion, cash, and cost flow)
- A proven record of safety program management and implementation
- Knowledge of Standard Word Instructions (SWIs), and controlling/implementing sitewide quality programs effectiveness
What's in it for You
- Competitive pay
- 100% employer paid HDHP insurance premiums for employees
- 401(k) with company match
- HSA and FSA options
- Dental and Vision insurance
- Education Assistance (Tuition Reimbursement)
- Work/Life balance
- Employee/Family focused culture
- And more!
Blattner is not able to sponsor H-1B visas or permanent residency for this or any position. We are able to consider candidates who hold valid, independent work authorization (e.g., U.S. citizenship, permanent residency, or other valid, non-expired work authorization).
$152,527.00 - $221,165.00 Individual Compensation to be determined based on the applicant's applicable experience and qualifications balanced against internal equity.
Pay & benefits
About this role
About Blattner
Company overview
Blattner Company, parent company of Blattner Energy and D.H. Blattner & Sons, owned by Quanta Services since 2021
Avon, Minnesota, United States
1907
What they do
Blattner is a tier 1 utility-scale engineering, procurement and construction (EPC) company. It works through Blattner Energy, a contractor behind some of the largest, most complex wind, solar and energy storage projects in the U.S., and D.H. Blattner & Sons, which provides utility-scale solar and energy storage EPC in California.
Founded in 1907 as a railway contractor, Blattner has focused on renewable energy construction since 1997 and has installed over 20% of America’s utility-scale solar, wind and energy storage capacity. On solar projects, its construction work covers foundations and racking, module installation, DC and AC collection systems, substations and transmission lines. In energy storage, it has 11 years of utility-scale experience and has installed more than 5,400 MWh of capacity and over 3,300 storage containers.
Projects and track record
Blattner has delivered over 450 wind, solar and energy storage projects across the U.S. and installed more than 27,000 wind turbines. On Solar Power World’s Top Solar Contractors list, it ranked No. 1 in 2020 and No. 2 in 2021 and 2022, then appeared as part of Quanta, which ranked No. 1 in 2023, No. 4 in 2024 and No. 1 in 2025.
Blattner Energy built phases 2 to 11 of the Kern County Wind Energy Center in California, at 1,547 MW the largest wind farm in the U.S. The 1,050 MW Western Spirit Wind project in New Mexico has the most wind power ever built as a single phase in North America: Blattner installed 377 GE turbines there, and more than 1,500 people worked on it at the peak of construction. With developer Recurrent Energy, it delivered Papago Storage near Tonopah, Arizona’s largest energy storage facility, in 16 months.
Recent developments
In September 2025, Blattner and Built Robotics announced a three-year agreement under which Blattner deploys dozens of Built’s AI-powered robots on solar projects across the United States, assisting its crews with pile driving, surveying, material handling, drilling and trenching. In July 2026, its parent Quanta Services took the top spot on Solar Power World’s 2026 Top Solar Contractors list after installing more than 6,000 MW of solar capacity in 2025; that year Blattner delivered more than 80% of Quanta’s solar capacity.
In October 2026, Clearway Energy Group started construction on the 650 MW Swan Energy Center, a solar facility on former strip-mined land in Bates County, Missouri, with Blattner Energy as its construction partner. Construction is expected to create up to 500 jobs at peak activity.
Working there
Field leadership roles include field and project engineers, site and project managers, trade superintendents, foremen and site safety managers. Craft roles include journeyman electricians, heavy equipment and crane operators, heavy equipment mechanics and oilers, site inventory specialists and general labourers. Corporate staff in business development, engineering, finance, human resources, and marketing and communications work from the headquarters in Avon, Minnesota, and across the U.S.
Its apprenticeship programme offers five career paths: construction craft labourers (two years), cable installers, heavy equipment operators and wind turbine installers (three years each), and substation technicians (four years). More than 500 apprentices and 125 interns joined Blattner projects in the first half of 2025.
Internships are paid: field interns work at project sites across the U.S. and have their lodging reimbursed, while corporate interns are based at the Avon headquarters. Benefits include 100% employer-paid premiums for high-deductible health plan (HDHP) insurance, a 401(k) savings plan with employer match and paid military leave for qualified employees.