Job description
- Prepare conceptual and basic engineering documentation, and issue RFQ/PO Technical Specification Documents for third-party equipment and in-house HZI products.
- Lead technical negotiations with suppliers, work with the System Procurement Manager on shortlisting and award decisions, and supervise supplier engineering progress through to FIW/FAT at their premises.
- Manage and coordinate interfaces with other disciplines and third parties (client, consortium partners), drive robust design freezes, and ensure supplier documents, engineering lists and BOQs are complete, accurate and on schedule.
- Resolve engineering issues, support claims and non-conformities, and help clarify construction and commissioning issues on site.
- Ensure contractual requirements are met and lead deviation clarification, and deputise for the Engineering Manager during longer absences, or run a small project or a large project with a few packages as Engineering Manager.
Qualifications
- A Master's or Bachelor's degree in Mechanical Engineering or a related field.
- At least 5 years of experience in a similar role on large EPC projects, with solid knowledge of WtX, RG, PtX or Carbon Capture plant products, equipment and packages.
- Experience with relevant standards and codes, and a good understanding of technical cost drivers. Construction or commissioning experience is an advantage.
- Proven collaboration, communication and presentation skills: you can lead technical discussions, explain complex issues to non-technical stakeholders, and work across teams in different locations and countries.
- Fluent written and spoken English (other languages are welcome), a problem-solving mindset with root cause analysis skills, good MS Office skills, and experience with engineering databases, document management systems or 3D tools.
- Willingness to travel to suppliers or site up to 10% of the time.
Additional Information
Employee perks, benefits
- Employment contract for an indefinite period
-
- 13th Salary
- 5% Annual bonus
- Flexible working time (core time 9-3:00)
- Home office possible 2 days a week
- Extra days of leave
- 2 Sick days per year
- Recreation allowance
- Referral program
- Travel allowance
- Multisport card
- The third pillar of the pension scheme (up to 2,5%)
- Company mobile phone or phone allowance
Support for professional and career growth, education and training
Compensation
-
Basic wage component (gross): 3000 EUR/month
This amount is our minimum offered salary. Compensation is determined based on your level, skills, experience, and qualifications.
For HR agencies: Please note that we do not accept applications coming from agencies. Thank you.
Pay & benefits
About this role
About Kanadevia Inova
Company overview
Kanadevia Inova AG, formerly Hitachi Zosen Inova, renamed in 2024; part of Japan’s Kanadevia Corporation since 2010
Zurich, Switzerland
1933
More than 3,800 employees in 17 countries; revenue of CHF 1.47 billion and order intake of CHF 2.85 billion in the 2025/26 financial year
What they do
Kanadevia Inova specialises in Waste to X and Renewable Gas, delivering turnkey systems that turn waste into valuable resources. Most of its work spans the full lifecycle of a plant: project development, financing, engineering, construction, operations, service and digital optimisation.
In September 2026 its Asset Management unit had an operating portfolio of 17 plants in the UK, the Netherlands, Germany, Italy, Sweden and the United States. The company has filed 855 patents in plant efficiency and decarbonisation.
Projects and track record
Kanadevia Inova engineered and built the Istanbul Waste-to-Energy plant, which it describes as Europe’s largest municipal solid waste-to-energy plant, able to treat 1 million tonnes of waste a year. The Dublin Waste to Energy Facility came online in 2017, with the company, under its previous name, as principal contractor for design, build and commissioning. In April 2026 Kanadevia Inova received the provisional acceptance certificate from kenova AG for its combustion and boiler system at the new KEBAG Enova Emmenspitz waste-to-energy plant in Zuchwil, Switzerland.
Recent developments
In August 2026 Kanadevia Inova and its partners Nareva and Itochu signed the concession agreement for Casablanca’s solid waste treatment and valorisation project with the Municipality of Casablanca. In May 2026 the company announced it will be lead EPC contractor for a new waste-to-energy plant for the Municipality of Rome. In April 2026 it received notice to proceed on Viridor’s Tees Valley Energy Recovery Facility, which is scheduled to begin operations in 2030.
In September 2026 the company signed a contract with Services Industriels de Genève (SIG) to renew the Cheneviers waste-to-energy facility near Geneva. In October 2025 Encyclis instructed it to build the first full-scale carbon capture project at a UK waste-to-energy facility, at Protos.
In renewable gas, Kanadevia Inova announced in March 2026 the groundbreaking of a large-scale anaerobic digestion facility in Louisville Township, Minnesota. In June 2026 it won a contract for a wet anaerobic digestion biogas plant with biomethane production in Castelvetrano, Sicily, and in September 2026 it acquired a controlling interest in the operating business of BioValue, a Dutch biomethane specialist.
In March 2026 the company took over the 38-year operations and maintenance contract for the Dublin plant from Encyclis. In October 2026 it announced the acquisition of Petrokens Engineering & Services, an engineering company in Chennai, India.
Working there
Kanadevia Inova’s careers site lists regional offices in Zurich, Bratislava, Milan and Gummersbach. The company offers leadership programmes, technical training and hands-on learning, as well as trainee and apprentice programmes where available and mentoring programmes.
Applicants typically have one to three interviews in hybrid mode, the first of them virtual. Global Mobility experts accompany new hires who relocate from abroad until their first day.