Rejobs

Renewable energy jobs at Deutsche Windtechnik

Bremen, Germany 1,001–5,000 employees Wind deutsche-windtechnik.com
Alert me to new jobs here
Deutsche Windtechnik
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
60 jobs · updated 2 days ago

Not seeing the right role? Join our talent pool

About Deutsche Windtechnik

Company overview

Deutsche Windtechnik AG; uses the short name DWT in five key international markets

Bremen, Germany

About 2,700 employees; revenue of €447 million in 2025

What they do

Deutsche Windtechnik provides service for all major wind turbine technologies, onshore and offshore. Its work ranges from turbine maintenance, large-component exchanges and control and power electronics to substation service and technical inspections by its own accredited inspection body.

Independent of the manufacturers, it services turbines from Vestas, Siemens, Nordex, Senvion, Fuhrländer, Gamesa, Enercon, General Electric and Mitsubishi and has 8,516 wind turbines under contract. In Europe, the UK, Taiwan and the USA it carries out maintenance, repairs, upgrades and inspections. In Germany it looks after 4,875 wind turbines with about 1,800 employees and 110 service stations.

Projects and track record

In 2007 Deutsche Windtechnik started out with its first maintenance contracts for Vestas and NEG Micon turbines. At the alpha ventus offshore wind farm it raised the availability of the Adwen turbines from 42% to 94%.

In the four years to the end of 2024 the company fitted about 4,000 wind turbines on land and at sea with its transponder-based system for needs-based night marking (BNK). Onshore it exchanges two to three large components a week on average, and since the company was founded its onshore teams have exchanged more than 1,500 large components.

Recent developments

Since 1 January 2026 Ronny Meyer has been CEO of Deutsche Windtechnik. Since mid-December 2025 the company has maintained 40 Adwen turbines with a combined 200 MW at the Trianel Windpark Borkum I offshore wind farm. Eneco also chose it as service partner for the Prinses Amalia wind farm, which it looks after from January 2026 until the end of its operating life.

In July 2025 Deutsche Windtechnik and its subsidiary OutSmart signed a five-year contract for the Hai Long Offshore Wind Project, one of the largest offshore wind farms in Taiwan. In March 2026 its Taiwanese unit won the contract for operation and maintenance of the offshore substation of Greater Changhua 4 and the onshore substations of Greater Changhua 2b and 4.

From 1 January 2027 Deutsche Windtechnik will look afterall 30 Siemens turbines at the Riffgat offshore wind farm for EWE, initially for two years with three one-year extension options; it had already maintained the wind farm from 2019 to the end of 2021. Also from January 2027 it takes over maintenance of all twelve turbines at the alpha ventus wind farm for Ocean Breeze Energy. Together with Trianel Windpark Borkum I, it will then serve three offshore wind farms from the island of Borkum.

In September 2026 Deutsche Windtechnik opened a central warehouse for large components in Haaren near Bad Wünnenberg (North Rhine-Westphalia). There it brings together its large-component exchange work for Europe.

Working there

Deutsche Windtechnik is hiring in turbine service, engineering, quality assurance, sales and commercial roles. Besides its Bremen headquarters it has other main sites in Germany in Osnabrück, Ostenfeld, Viöl, Büdelsdorf and Rennerod. Through a secondment programme, service technicians go from Germany to the USA straight after they are hired.

Apprenticeships cover mechatronics for onshore and offshore, office management, warehouse logistics, precision mechanics and IT with a focus on systems integration. On 1 September 2025, 33 new apprentices started, 31 of them in mechatronics.

On its German careers site Deutsche Windtechnik lists a 38.5-hour week and 30 days of leave for full-time staff, plus a 20% subsidy towards a company pension with Allianz. Service technicians train for at least one week every year at one of the company’s three training centres, to GWO or DGUV rules.

Last updated Nov 16, 2026 · Report an issue