Rejobs

Renewable energy jobs at JERA Nex bp

JERA Nex bp, a London-based joint venture of JERA and bp, develops, owns and operates offshore wind projects in 9 countries.

London, United Kingdom 501–1,000 employees Wind jnbp.com
Alert me to new jobs here
JERA Nex bp
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
4 jobs · updated 4 days ago

Not seeing the right role? Join our talent pool

About JERA Nex bp

Company overview

JERA Nex bp, a 50:50 joint venture of JERA Co. and bp

London, United Kingdom

2025

What they do

JERA Nex bp is an end-to-end developer, owner and operator of offshore wind projects, formed by JERA and bp in July 2025. Its 20 projects across 9 countries add up to a net potential generating capacity of about 13GW: around 1GW installed, around 7.5GW in development and 4.5GW from further secured leases. Its development teams cover R&D, wind farm design and engineering, permitting, system integration and aquaculture.

Parkwind, which JERA acquired in 2023, ran a Belgian wind farm portfolio and the Arcadis Ost 1 offshore wind farm in Germany. JERA Nex bp operates Nobelwind and Northwester 2 from an operations hub in Ostend and keeps a long-standing presence in Leuven.

Projects and track record

Off Ostend, Belwind (171MW, about 49km from the coast) has been operational since 2010, Nobelwind (165MW, about 47km out) since 2017 and Northwester 2 (219MW) since 2020. In the German Baltic Sea northeast of Rügen, the 257MW Arcadis Ost 1 was inaugurated in December 2023; it used a floating turbine installation method in water up to 45m deep.

In Taiwan, Formosa 2 has 47 fixed-bottom turbines and 376MW off Miaoli County. In Japan, JERA Nex bp owns the Ishikari Bay New Port Offshore Wind Farm with Green Power Investment Corporation; its 14 turbines of 8MW each total 112MW, and it was inaugurated in April 2024.

The development pipeline includes the Mona Offshore Wind Project, a proposed wind farm of up to 96 turbines and around 1.5GW in Welsh waters of the east Irish Sea, and Morven, developed with EnBW around 60km off Aberdeenshire for up to around 3GW. In Germany the company holds the rights to develop Oceanbeat East and Oceanbeat West, 4GW combined, and in Australia it is developing Spinifex, about 1GW off South West Victoria, with Alinta Energy.

Recent developments

In July 2026 JERA Nex bp completed the acquisition of Sumitomo Corporation’s stakes in Northwester 2 and Nobelwind, taking its ownership to 100% and 80.1% respectively. In January 2026 it signed a lease agreement with The Crown Estate for Mona while acquiring EnBW’s stake in the project. In November 2025 it saw the full commissioning of the Ostend Hydrogen Refuelling Station, a hydrogen bunkering facility in the Port of Ostend.

Working there

The careers page lists offices in London, Leuven, Tokyo, Sunbury, Aberdeen, Edinburgh, Dublin, Ostend, Mukran, Utrecht, Copenhagen, Berlin, Hamburg, Madrid, Melbourne and Houston. Current vacancies include hybrid roles in London, Leuven and Ostend, from health and safety (HSSE) advisers to a head of treasury.

Last updated Nov 27, 2026 · Report an issue