Rejobs

Renewable energy jobs at Quest One

Quest One of Augsburg, H-TEC SYSTEMS until 2024, makes PEM electrolysis stacks and complete electrolysers for industrial-scale green hydrogen.

Augsburg, Germany 501–1,000 employees Energy storage questone.com
Alert me to new jobs here
Quest One
Job type
Workplace
Location above applies to on-site and hybrid roles.
Posted
Reset
10 jobs · updated 6 days ago

Not seeing the right role? Join our talent pool

About Quest One

Company overview

Quest One GmbH (H-TEC SYSTEMS until 2024), owned by Everllence (formerly MAN Energy Solutions)

Augsburg, Germany

1997

What they do

Quest One makes PEM electrolysis stacks and complete electrolyzers for industrial-scale green hydrogen production. Augsburg leads platform development and electrolyzer production, Hamburg is its automated stack hub, and Houston handles engineering, service and local assembly for North America. Together the three production sites have an annual electrolysis capacity of 500 MW.

The ME450 delivers 450 kg of green hydrogen a day at 1 MW. The Modular Hydrogen Platform (MHP) is built from 10 MW electrolyzer blocks and serves projects from 10 MW to several hundred megawatts.

Quest One supports projects from technical studies and LCOH modelling in their early phases through on-site commissioning to long-term operation. Its service packages combine remote access, condition monitoring, safety maintenance and proactive support, alongside planned stack exchanges, upgrades and the recycling of used stacks.

The company began in 1997 as a research project, as H-TEC Wasserstoff-Energie-Systeme GmbH, with applications in research, development and teaching. In 2011 it refocused on larger electrolyzers as H-TEC SYSTEMS GmbH, in 2019 it moved its headquarters from Lübeck to Augsburg, and in 2021 Everllence took it over. It was renamed Quest One on 30 September 2024. It draws on Volkswagen know-how for automated stack production, and its stated goal is to avoid 1% of global greenhouse gas emissions by 2050 through its electrolyzers.

Projects and track record

On 30 September 2024 Quest One opened its Gigahub in Hamburg for the serial, automated production of electrolysis stacks. Automation cuts the production time of a stack by around 75%, to less than an hour. By 2024 the company already had several dozen systems in operation in Europe.

Gruyère Hydrogen Power in the canton of Fribourg runs two ME450 units of 1 MW each, which together reach a system efficiency of 74% and produce up to 900 kg of green hydrogen a day. Grenzland Bürgerenergie eG chose four ME450 units for its hydrogen project in Westre, Schleswig-Holstein. At the Renewable Gasfield in southern Styria, a 1 MW ME450 produces up to 450 kg of hydrogen a day.

At Hydrogen Lab Bremerhaven, a 1 MW ME450 runs on on-site wind power, and Fraunhofer IWES researchers study how wind turbines and electrolysis interact. At the Green H2-Hub Haren in Lower Saxony, two ME450 units run on power from a nearby community wind farm. In September 2024 the company agreed to supply three ME450 units to Helen Oy for a 3 MW plant in Helsinki designed to produce up to 1,350 kg of green hydrogen a day.

Recent developments

In January 2025 Quest One started building a demonstration plant for the MHP in Augsburg. It stands at the Everllence site inside the Turbocharger Performance Center and can be visited year-round. In May 2026 Quest One launched an outdoor configuration of the MHP that needs no dedicated electrolyzer building, and extended its scope to cooling systems, fresh water treatment and hydrogen purification; the platform reaches a system efficiency of up to 77%.

In June 2025 Quest One and MasTec Clean Energy & Infrastructure signed a memorandum of understanding to optimise the construction of large-scale electrolysis projects in North America. In November 2025 Quest One agreed with Ryze Power to work together on end-to-end hydrogen supply: Ryze Power operates a tube trailer station at the Gigahub, through which hydrogen from stack R&D and end-of-line testing goes to the market. In September 2026 Quest One sold an ME450 to Ljubljana, its expansion into Central Europe; with EPC partner C&G and end customer Energetika Ljubljana, it is supporting hydrogen infrastructure for public buses and a hydrogen refuelling station there.

In August 2025 Everllence appointed Michael Meister CEO and spokesperson of the management board, after he had led the company on an interim basis since February 2025. He also remains responsible for production, quality and procurement.

Working there

Quest One works from three sites: Augsburg is its headquarters and largest site, with development, engineering and electrolyzer production, Hamburg hosts the Gigahub, and Houston is its North America headquarters, where it engineers, manufactures and services projects across the region. It hires in technology, hands-on production and business functions, and offers apprenticeships for school leavers as well as internships, working-student posts and thesis projects for university students. It supports flexible ways of working, and its benefits include bike leasing, shared events and health offers.

Last updated Nov 23, 2026 · Report an issue