Stillingsbeskrivelse
Job Title: Drawing Office Civils Design Lead
Location: Cambuslang
Salary + benefits: From £63,200 to £79,000 + Upto 15 % Bonus + Medical Cover
At SP Energy Networks, we are strengthening our Drawing Office capability to support the safe, consistent and efficient delivery of Transmission Network projects. As our Drawing Office Civils Design Lead, you will report to the Drawing Office Manager and take charge of the Civils Drawing Office team. You will manage the team's people, workload, development and delivery. You will also provide technical direction for the production, coordination, checking and quality of civil and structural 3D models and drawings. Your work will help deliver the network that supports Scotland's net zero goals.
What you'll be doing
You will manage the Civils Drawing Office team and provide expert guidance across all civil and structural 3D models and drawings. This includes relevant underground cable civil works within the team's scope. You will combine line management with workload planning, staff development and quality assurance. This ensures every piece of Drawing Office information is controlled and properly assured before issue.
Your day-to-day responsibilities will include:
- Directing the Civils Drawing Office team, setting clear priorities and maintaining high standards of delivery and quality.
- Planning and allocating work across the team, balancing project demand, available resource, programme requirements and delivery risk.
- Providing technical direction so that civil and structural 3D models and drawings are well defined, coordinated, checked and assured.
- Managing direct reports, including performance, attendance, wellbeing, conduct and development, with support from the Drawing Office Manager.
- Overseeing recruitment, coaching, mentoring and structured development to build the capability of each team member and of the team as a whole.
- Promoting the use of BIM, Revit, Autodesk Forma and other digital tools, and embedding agreed standards and workflows.
- Applying engineering standards, Drawing Office procedures, health and safety requirements, quality controls and design-change arrangements consistently. You will use errors, rework and audit findings to drive practical improvement.
- Developing and reviewing Drawing Office processes, model and drawing standards and working practices to improve how we produce and deliver information.
- Coordinating interfaces with Plant, Protection and Control, Cables, Estates, Land and Planning, project teams and external design houses.
- Keeping the Drawing Office Manager, project teams and stakeholders informed on workload, priorities, technical issues, programme risk and team performance.
What you'll bring
Qualifications and requirements
- An HNC/HND, degree or equivalent qualification in Civil Engineering, Structural Engineering or a closely related discipline. Demonstrable equivalent experience in civil or structural design is also welcome.
- Demonstrable experience producing civil or structural 3D models and drawings.
- Demonstrable experience in the technical checking of these models and drawings, with the ability to oversee and assure the quality of Drawing Office outputs.
- Demonstrable experience managing and coordinating a technical Drawing Office or design-production team. Previous formal line-management experience is desirable but not essential.
- A UK driving licence and the ability to travel to project and site locations as needed.
Skills and experience
- Experience producing, coordinating and checking civil and/or structural 3D models and drawings. This may include civil layouts and details, foundations, buildings and structural elements, site infrastructure, and underground cable civil works.
- Experience in electrical substation civil and structural work is desirable.
- Experience allocating work, providing technical guidance, helping team members develop and maintaining delivery and quality standards within a design team.
- A sound knowledge of controlled model and drawing production, checking and change-management processes.
- Good knowledge of constructability, health and safety requirements, and the application of Drawing Office procedures and engineering standards.
- The ability to manage multiple priorities, assess complex information, identify interfaces and risks, and give practical direction.
- Excellent communication skills, with the ability to guide technical discussions, give clear direction and build strong working relationships with internal teams, external design organisations and the supply chain.
- Experience with 2D and 3D design and information-management tools, including AutoCAD and Revit. Experience with BIM and digital design workflows, including Autodesk Forma, Vault and ProjectWise, is desirable.
What's in it for you
As well as an attractive salary which is reviewed annually, you can also enjoy a number of other benefits. With our pension scheme, we'll double match your contribution up to a company contribution of 10%.
At ScottishPower, we believe it's the little things we do in life that make a big difference. From helping you look after your family's wellbeing, save for your future and take personal steps for climate action -- our benefits are designed to help you do just that - so that you have everything you need to take care of your world -- today and tomorrow. That's why our benefits include:
- 36 days annual leave
- Holiday Purchase - perfect your work/life balance with extra annual leave
- Equity Plans
- Payroll Giving and Charity Matched Funding
- Technology Vouchers - save more and spread the cost of your technology purchases
- Electric Vehicle Schemes - to help you transition to green/clean driving
- Cycle to Work scheme and Public Transport Season Ticket Loans
- Healthcare benefit options including: Dental Insurance, Private Medical Insurance, Health Cash Plan and annual Health Assessments
- Life Assurance (4x salary)
- Access to Savesmart financial wellbeing assistance
- Plus shopping, leisure, restaurant and gym discounts, and unique employee deals on travel insurance and more
Inclusion, diversity, and a social purpose are at the heart of everything we do. Alongside our values, they make us a stronger, more sustainable business with direct links to the communities we serve. It takes all sorts of people to build a large-scale business like ours, so whatever your background, you'll fit right in.
We are committed to providing reasonable support or adjustments in our recruiting processes for candidates with disabilities, long term conditions, mental health conditions, or who are neurodivergent or require pregnancy-related support.
Mobility
Please note that any applicant who is not a citizen of the country of the vacancy will be subject to compliance with the applicable immigration requirements to legally work in that country. If/when required, the Company will support the employee with the necessary Immigration requirements.
Løn og goder
Om stillingen
Om Scottish Power
Virksomhedsoversigt
Scottish Power Limited, et helejet datterselskab af Iberdrola
ca. 9.800 medarbejdere (2025); omsætning på 6.516 mio. £ i 2025
Hvad de laver
ScottishPower er holdingselskab for en koncern, der producerer, transmitterer og distribuerer elektricitet og leverer el og gas, primært i Storbritannien, gennem tre divisioner: Energy Networks, Renewable production og Customer business. Selskabet var det første integrerede energiselskab i Storbritannien, der producerede 100 % af sin el fra vedvarende kilder. Driftsholdingselskabet Scottish Power UK plc blev registreret den 1. april 1989 som South of Scotland Electricity plc og har heddet Scottish Power plc siden 1. august 1989.
Energy Networks driver fire regulerede virksomheder inden for eltransmission og -distribution, hvis kabler, luftledninger og transformerstationer forsyner omkring 5,9 mio. tilsluttede kunder i Central Belt og det sydlige Skotland, Cheshire, Merseyside, North Shropshire, Nordwales, Cumbria og Lancashire. SP Transmission ejer transmissionsnettet, og de tre øvrige virksomheder, heriblandt Electricity North West, er distributionsnetselskaber. Det gør ScottishPower til Storbritanniens næststørste distributionsnetselskab, der leverer el til omkring 12 mio. mennesker via et net på over 170.000 kilometer.
Customer business leverede gas og el til 4,2 mio. kunder ved udgangen af 2025. Divisionen installerer også varmepumper, solpaneler, batterilagring og opladning af elbiler, med særlige tariffer for varmepumper og elbilsopladning og Storbritanniens første landsdækkende årlige serviceaftale for varmepumper.
Projekter og erfaring
Renewable production udvikler, bygger og driver vedvarende energianlæg, primært vindkraft til havs og på land. Divisionen driver over 40 landbaserede anlæg samt havvindmølleparkerne East Anglia One og West of Duddon Sands, i alt 3 GW kapacitet i drift. East Anglia One ejes 60/40 af ScottishPower og Bilbao Offshore Holding Limited, og West of Duddon Sands drives sammen med Orsted Schroders Greencoat.
På land gik den repowerede vindmøllepark Hagshaw Hill (80 MW) i kommerciel drift den 31. oktober 2025: 14 nye møller erstattede de oprindelige 26, og anlægget har nu fem gange sin oprindelige kapacitet. Batterianlægget Harestanes (50 MW) gik i kommerciel drift den 15. september 2025 og Kilgallioch Extension Windfarm (51 MW) i marts 2026 med ni ekstra møller.
Til havs bygges East Anglia Three på 1,4 GW 69 kilometer ud for Suffolks kyst med 95 møller fra Siemens Gamesa, Storbritanniens første havvindprojekt med 115 meter lange vinger. Den første mølle blev rejst i april 2026, og projektet til 4 mia. £ har været drevet 50/50 sammen med Masdar, siden en ejerandel på 50 % blev solgt til Masdar i juli 2025. Dets offshore-konverterstation, ScottishPowers første, er den største, der nogensinde er bygget i Iberdrola-koncernen. East Anglia Two er i sin byggefase, der løber fra 2026 til 2028.
Den britiske projektportefølje frem til 2038 rummer omkring 3 GW havvind i East Anglia-zonen, ScotWind-porteføljen på 5 GW med det flydende MarramWind (3 GW) og det bundfaste MachairWind (2 GW) samt omkring 5 GW mulige projekter inden for landvind, sol og batterier. På nettet skal Eastern Green Link 1, der udvikles med National Grid Electricity Transmission, forbinde Torness i East Lothian med Hawthorn Pit i County Durham, og Siemens Energy er foretrukken tilbudsgiver på de to HVDC-konverterstationer til Eastern Green Link 4.
Seneste nyt
Iberdrola præsenterede i september 2025 en strategiplan på 58 mia. € med Storbritannien som sit vigtigste investeringsmål, og ScottishPower investerer 24 mia. £ over fem år frem til 2028. I december 2025 godkendte Ofgems endelige afgørelse ScottishPowers investeringsplaner på 12 mia. £ for transmissionsnettet i perioden 2026-2031. I maj 2025 gav National Wealth Fund tilsagn om 600 mio. £ til netudbygningen som del af en finansieringspakke på 1,35 mia. £ under ledelse af Bank of America, der støtter syv prioriterede transmissionsprojekter.
I marts 2025 godkendte Competition and Markets Authority købet af en ejerandel på 88 % i Electricity North West, og omkring 2.550 af dets medarbejdere kom til ScottishPower i løbet af 2025. I november 2025 gav en transaktion med Shell ScottishPower Renewables det fulde ejerskab af MarramWind-projektet.
At arbejde der
ScottishPower har budt velkommen til over 1.000 nyansatte, siden selskabet i november 2024 annoncerede vækst i medarbejderstaben for 2025. Et rekordantal på 338 dimittender og elever startede i september 2025 i roller inden for bl.a. ingeniørarbejde, cybersikkerhed og projektledelse, fra Glasgow over Merseyside og Nordwales til London. I 2025 åbnede Energy Networks et nyt kontor i Edinburgh til sine transmissionsteams, herunder dem, der bygger søkabelforbindelser ud for Skotlands øst- og vestkyst, og koncernen blev akkrediteret som 2025 Top Employer af Top Employers Institute.
Mange stillinger giver mulighed for hybridarbejde. Familieorloven omfatter 26 ugers fuld løn ved barsel og adoption og 8 ugers fuld løn ved fædreorlov, og programmet "Your ScottishPower Benefits" lader medarbejderne vælge goder som Share Incentive Plan, Cycle to Work-ordningen og køb af ekstra feriedage.