Stillingsbeskrivelse
Job Title Lead O&M Engineer
Location Glasgow, London or Lowestoft
Salary from £70,800, up to 20% bonus, family health cover and car allowance
Flexible Working Pattern
The Lead O&M Engineer is a critical role within O&M of the Offshore Business focussing on the delivery of O&M scope of works in the UK and overseas (USA, Germany, France...), working with Contractors, Multinational Joint Ventures and multiple departments within Offshore O&M, Offshore Operations and Global Services to ensure that SPR's/ Iberdrola long term asset value and production revenue is maximised.
Belonging to the Offshore O&M Operations Engineering Team, and reporting to the Head of Operations Engineering, the Lead O&M Engineer will be responsible for defining O&M Strategies and plans, tendering (technical), negotiating (technical) and managing multi-million offshore O&M campaigns/installations including management of contractors and associated interfaces, and ensuring quality, best practices and excellent H&SE performance are applied.
The Lead O&M Engineer is a professionally qualified engineer with significant experience within Electrical transmission equipment in Offshore O&M.
Provides technical advice & expertise at all stages of the project lifecycle e.g. supports the contract strategy by determining what needs to be purchased, & provides technical assessment to the O&M package/ site managers to ensure that delivery is to design & quality standards agreed.
The position may require frequent travel to various locations in the UK and overseas and during development, contracting and delivery of a scope of works the individual should be able to coordinate with teams working at different project locations.
What you'll be doing
You'll lead and resource the electrical transmission technical team, ensuring offshore standards, procedures and quality requirements are met. You'll assess O&M solutions and technical risks, recommend cost-effective improvements and ensure decisions are supported by documented technical and commercial assessments.
You'll coordinate with site teams, suppliers and regulators to define compliant maintenance requirements, select technically competent suppliers and manage asset handovers from construction. You'll also support asset management plans and R&D strategy, recommending interventions based on asset condition and operational performance.
You'll provide technical advice throughout the project lifecycle, contributing to bids, commercial agreements and investment proposals. Working with HSE colleagues, you'll implement electrical safety strategies, promote strong safety awareness and share lessons learnt across offshore projects.
What you'll bring
-
Degree in engineering
-
IT literate with the ability to operate MS Office systems and other IT based project management software.
-
Knowledge and experience of engineering contracts
-
Relevant experience of offshore wind
-
Significant experience in engineering/maintenance management and/or management consulting in an asset intensive industrial context. (e.g. offshore wind, DNO).
-
Specialist knowledge of reliability engineering, maintenance strategy and asset integrity management.
-
Experience of using High Voltage Electrical Safety Rules (eg.TSO/DNO or offshore specific)
-
Broad knowledge in a relevant technical area in Electrical transmission equipment plus depth in a relevant technical specialty therein.
-
Flexible to travel around UK, and Europe as required.
-
Experience in managing high skilled teams.
What's in it for you
As well as a competitive salary which is reviewed annually, you can also enjoy a number of other benefits. With our pension scheme, we'll double match your contribution up to a company contribution of 10%.
At ScottishPower, we believe it's the little things we do in life that make a big difference. From helping you look after your family's wellbeing, save for your future and take personal steps for climate action - our benefits are designed to help you do just that - so that you have everything you need to take care of your world - today and tomorrow. That's why our benefits include:
-
36 days annual leave
-
Holiday Purchase - perfect your work/life balance with extra annual leave
-
Share Schemes
-
Payroll Giving and Charity Matched Funding
-
Technology Vouchers - save more and spread the cost of your technology purchases
-
Electric Vehicle Schemes - to help you transition to green/clean driving
-
Cycle to Work scheme and Public Transport Season Ticket Loans
-
Healthcare benefit options including: Dental Insurance, Private Medical Insurance, Health Cash Plan and annual Health Assessments
-
Life Assurance (4x salary)
-
Access to Savesmart financial wellbeing support
-
Plus shopping, leisure, restaurant and gym discounts, and unique employee deals on travel insurance and more
Inclusion, diversity, and a social purpose are at the heart of everything we do. Together with our values, they bring us together into a stronger, more sustainable business with direct links to the communities we serve. It takes all kinds of people to build a large-scale business like ours, so whatever your background, you'll fit right in.
ScottishPower is committed to providing reasonable support or adjustments in our recruiting processes for candidates with disabilities, long term conditions, mental health conditions, or who are neurodivergent or require pregnancy-related support.
Mobility
Please note that any applicant who is not a citizen of the country of the vacancy will be subject to compliance with the applicable immigration requirements to legally work in that country. If/when required, the Company will support the employee with the necessary Immigration requirements.
Løn og goder
Om stillingen
Om Scottish Power
Virksomhedsoversigt
Scottish Power Limited, et helejet datterselskab af Iberdrola
ca. 9.800 medarbejdere (2025); omsætning på 6.516 mio. £ i 2025
Hvad de laver
ScottishPower er holdingselskab for en koncern, der producerer, transmitterer og distribuerer elektricitet og leverer el og gas, primært i Storbritannien, gennem tre divisioner: Energy Networks, Renewable production og Customer business. Selskabet var det første integrerede energiselskab i Storbritannien, der producerede 100 % af sin el fra vedvarende kilder. Driftsholdingselskabet Scottish Power UK plc blev registreret den 1. april 1989 som South of Scotland Electricity plc og har heddet Scottish Power plc siden 1. august 1989.
Energy Networks driver fire regulerede virksomheder inden for eltransmission og -distribution, hvis kabler, luftledninger og transformerstationer forsyner omkring 5,9 mio. tilsluttede kunder i Central Belt og det sydlige Skotland, Cheshire, Merseyside, North Shropshire, Nordwales, Cumbria og Lancashire. SP Transmission ejer transmissionsnettet, og de tre øvrige virksomheder, heriblandt Electricity North West, er distributionsnetselskaber. Det gør ScottishPower til Storbritanniens næststørste distributionsnetselskab, der leverer el til omkring 12 mio. mennesker via et net på over 170.000 kilometer.
Customer business leverede gas og el til 4,2 mio. kunder ved udgangen af 2025. Divisionen installerer også varmepumper, solpaneler, batterilagring og opladning af elbiler, med særlige tariffer for varmepumper og elbilsopladning og Storbritanniens første landsdækkende årlige serviceaftale for varmepumper.
Projekter og erfaring
Renewable production udvikler, bygger og driver vedvarende energianlæg, primært vindkraft til havs og på land. Divisionen driver over 40 landbaserede anlæg samt havvindmølleparkerne East Anglia One og West of Duddon Sands, i alt 3 GW kapacitet i drift. East Anglia One ejes 60/40 af ScottishPower og Bilbao Offshore Holding Limited, og West of Duddon Sands drives sammen med Orsted Schroders Greencoat.
På land gik den repowerede vindmøllepark Hagshaw Hill (80 MW) i kommerciel drift den 31. oktober 2025: 14 nye møller erstattede de oprindelige 26, og anlægget har nu fem gange sin oprindelige kapacitet. Batterianlægget Harestanes (50 MW) gik i kommerciel drift den 15. september 2025 og Kilgallioch Extension Windfarm (51 MW) i marts 2026 med ni ekstra møller.
Til havs bygges East Anglia Three på 1,4 GW 69 kilometer ud for Suffolks kyst med 95 møller fra Siemens Gamesa, Storbritanniens første havvindprojekt med 115 meter lange vinger. Den første mølle blev rejst i april 2026, og projektet til 4 mia. £ har været drevet 50/50 sammen med Masdar, siden en ejerandel på 50 % blev solgt til Masdar i juli 2025. Dets offshore-konverterstation, ScottishPowers første, er den største, der nogensinde er bygget i Iberdrola-koncernen. East Anglia Two er i sin byggefase, der løber fra 2026 til 2028.
Den britiske projektportefølje frem til 2038 rummer omkring 3 GW havvind i East Anglia-zonen, ScotWind-porteføljen på 5 GW med det flydende MarramWind (3 GW) og det bundfaste MachairWind (2 GW) samt omkring 5 GW mulige projekter inden for landvind, sol og batterier. På nettet skal Eastern Green Link 1, der udvikles med National Grid Electricity Transmission, forbinde Torness i East Lothian med Hawthorn Pit i County Durham, og Siemens Energy er foretrukken tilbudsgiver på de to HVDC-konverterstationer til Eastern Green Link 4.
Seneste nyt
Iberdrola præsenterede i september 2025 en strategiplan på 58 mia. € med Storbritannien som sit vigtigste investeringsmål, og ScottishPower investerer 24 mia. £ over fem år frem til 2028. I december 2025 godkendte Ofgems endelige afgørelse ScottishPowers investeringsplaner på 12 mia. £ for transmissionsnettet i perioden 2026-2031. I maj 2025 gav National Wealth Fund tilsagn om 600 mio. £ til netudbygningen som del af en finansieringspakke på 1,35 mia. £ under ledelse af Bank of America, der støtter syv prioriterede transmissionsprojekter.
I marts 2025 godkendte Competition and Markets Authority købet af en ejerandel på 88 % i Electricity North West, og omkring 2.550 af dets medarbejdere kom til ScottishPower i løbet af 2025. I november 2025 gav en transaktion med Shell ScottishPower Renewables det fulde ejerskab af MarramWind-projektet.
At arbejde der
ScottishPower har budt velkommen til over 1.000 nyansatte, siden selskabet i november 2024 annoncerede vækst i medarbejderstaben for 2025. Et rekordantal på 338 dimittender og elever startede i september 2025 i roller inden for bl.a. ingeniørarbejde, cybersikkerhed og projektledelse, fra Glasgow over Merseyside og Nordwales til London. I 2025 åbnede Energy Networks et nyt kontor i Edinburgh til sine transmissionsteams, herunder dem, der bygger søkabelforbindelser ud for Skotlands øst- og vestkyst, og koncernen blev akkrediteret som 2025 Top Employer af Top Employers Institute.
Mange stillinger giver mulighed for hybridarbejde. Familieorloven omfatter 26 ugers fuld løn ved barsel og adoption og 8 ugers fuld løn ved fædreorlov, og programmet "Your ScottishPower Benefits" lader medarbejderne vælge goder som Share Incentive Plan, Cycle to Work-ordningen og køb af ekstra feriedage.