Rejobs
Scottish Power
Scottish Power
6 åbne job · Opslået for 5 dage siden

Ledende ingeniør (systemudvikling)

Bliv ledende ingeniør (systemudvikling) hos ScottishPower i Glasgow, og vær med til at forme planlægningen af Storbritanniens transmissionsnet. Du koordinerer strategiske planer og udarbejder tekniske forslag til Ofgem i samarbejde med kolleger og branchepartnere. Du får blandt andet 36 dages årlig ferie og en pensionsordning med arbejdsgiverbidrag på op til 10 %.

Løn
63.200–79.000 £/år
Placering
Glasgow, Storbritannien
Arbejdsplads
På stedet
Jobtype
Fuldtid
Ansøgning hos iberdrola.wd3.myworkdayjobs.com

Tjek din indbakke.

På mobilen? Du kan ansøge fra en computer senere.

Stillingsbeskrivelse

Job Title: Lead Engineer (System Development)

Location: Glasgow, ScottishPower HQ

Salary + benefits: From £63,200 to £79,000 + benefits

As a Lead Engineer (System Development) in our Transmission Network team, you will represent SP Transmission (SPT) in the national system planning processes that shape Great Britain's energy future. You will shape our input to the Centralised Strategic Network Plan (CSNP) and the Strategic Spatial Energy Plan (SSEP). You will also establish the internal processes that keep SPEN fully engaged and well represented in these external processes.

Your work will help us identify, develop and assess future projects in good time, so we can deliver our role in the UK's drive to reach Net Zero by 2050. You will work with colleagues across SPEN, the National Energy System Operator (NESO), other Transmission Owners and Ofgem. You will also help develop engineering proposals for submission to Ofgem, making sure they are accurate, clear and compliant with regulation.

What you'll be doing

You will develop and implement internal policies and processes, in line with best practice, so that SPEN engages effectively with GB planning processes and meets its legal and licence requirements.

You will work closely with the Network Planning, Strategic Investment, Regulation and Major Projects teams. In partnership with these teams, you will turn the outputs of the CSNP, SSEP and related planning processes into deliverable investment plans. You will act as SPEN's point of contact for strategic engagement and coordination across these whole-system planning processes, and you will bring commercial and technical innovation into our policies and plans to maximise value while managing risk.

You will also:

  • Join industry working groups and joint projects with partners across the sector
  • Prepare, review and help deliver industry and licence documentation, including the SSEP, CSNP and Business Plans
  • Produce and coordinate detailed engineering proposals for Ofgem, with clear evidence, modelling and engineering rationale
  • Make sure every proposal meets our internal governance standards
  • Maintain thorough documentation and audit trails for regulatory submissions
  • Coordinate input from colleagues at all levels of the business, meeting licence deadlines and regulatory timescales
  • Raise awareness of SPEN's position on wider network planning among key industry groups and stakeholders
  • Put safety, quality and environmental excellence at the centre of everything you do
  • This role has no direct reports. You will achieve results through influence, working with senior colleagues across SPEN and the wider industry.

What you'll bring

You will hold a degree and have significant experience in transmission network planning, development, operation or regulatory strategy. This includes applying NETS SQSS and Grid Code requirements. You will have a firm grasp of GB network design standards and codes, and of how the transmission network operates.

You will also have:

  • Working knowledge of System Operator Transmission Owner Code (STC) processes and procedures at the NESO interface, including those that feed into the wider system planning documents
  • Expert knowledge and significant experience of the regulatory, technical and commercial frameworks that affect SPEN
  • Experience of setting and implementing strategies, policies and plans
  • Experience of regulatory submissions and/or price controls
  • Working knowledge of the electrical characteristics of power system equipment, such as transmission overhead lines, cables, and shunt and series reactive compensation
  • Working knowledge of advanced data processing and evidence-based methods, legal and licence obligations, industry codes and standards, and financial policies and procedures
  • Excellent written and verbal communication skills, with the ability to explain complex technical matters clearly to non-technical audiences
  • Experience of managing and influencing internal and external stakeholders at a senior level
  • Strong planning and organisation skills, and the flexibility to adjust priorities as business needs change
  • A track record of excellent customer service
  • Awareness of SPEN, ScottishPower and Iberdrola strategic aims, and of international developments in power system design
  • You should be willing to travel occasionally for site visits, workshops or stakeholder meetings. This is not mandatory.

What's in it for you

As well as an attractive salary which is reviewed annually, you can also enjoy a number of other benefits. With our pension scheme, we'll double match your contribution up to a company contribution of 10%.

At ScottishPower, we believe it's the little things we do in life that make a big difference. From helping you look after your family's wellbeing, save for your future and take personal steps for climate action -- our benefits are designed to help you do just that - so that you have everything you need to take care of your world -- today and tomorrow. That's why our benefits include:

  • 36 days annual leave
  • Holiday Purchase - perfect your work/life balance with extra annual leave
  • Equity Plans
  • Payroll Giving and Charity Matched Funding
  • Technology Vouchers - save more and spread the cost of your technology purchases
  • Electric Vehicle Schemes - to help you transition to green/clean driving
  • Cycle to Work scheme and Public Transport Season Ticket Loans
  • Healthcare benefit options including: Dental Insurance, Private Medical Insurance, Health Cash Plan and annual Health Assessments
  • Life Assurance (4x salary)
  • Access to Savesmart financial wellbeing assistance
  • Plus shopping, leisure, restaurant and gym discounts, and unique employee deals on travel insurance and more

Inclusion, diversity, and a social purpose are at the heart of everything we do. Alongside our values, they make us a stronger, more sustainable business with direct links to the communities we serve. It takes all kinds of people to build a large-scale business like ours, so whatever your background, you'll fit right in.

We aim to provide reasonable adjustments and assistance in our recruiting processes for candidates with disabilities, long term conditions, mental health conditions, or who are neurodivergent or require pregnancy-related help.

Mobility

Please note that any applicant who is not a citizen of the country of the vacancy will be subject to compliance with the applicable immigration requirements to legally work in that country. If/when required, the Company will support the employee with the necessary Immigration requirements.

Løn og goder

63.200–79.000 £ /år
Sundhedsforsikring Tandforsikring Livsforsikring Pensionsordning Medarbejderaktier Betalt ferie Trivsel Transporttilskud

Om stillingen

Opslået
12 nov. 2026
Tidszone
UTC+00:00
Erfaring
Significant experience in transmission network planning, development, operation or regulatory strategy
Arbejdsgiver scottishpower.com LinkedIn Scottish Power

Om Scottish Power

Virksomhedsoversigt

Scottish Power Limited, et helejet datterselskab af Iberdrola

Glasgow, Storbritannien

ca. 9.800 medarbejdere (2025); omsætning på 6.516 mio. £ i 2025

Hvad de laver

ScottishPower er holdingselskab for en koncern, der producerer, transmitterer og distribuerer elektricitet og leverer el og gas, primært i Storbritannien, gennem tre divisioner: Energy Networks, Renewable production og Customer business. Selskabet var det første integrerede energiselskab i Storbritannien, der producerede 100 % af sin el fra vedvarende kilder. Driftsholdingselskabet Scottish Power UK plc blev registreret den 1. april 1989 som South of Scotland Electricity plc og har heddet Scottish Power plc siden 1. august 1989.

Energy Networks driver fire regulerede virksomheder inden for eltransmission og -distribution, hvis kabler, luftledninger og transformerstationer forsyner omkring 5,9 mio. tilsluttede kunder i Central Belt og det sydlige Skotland, Cheshire, Merseyside, North Shropshire, Nordwales, Cumbria og Lancashire. SP Transmission ejer transmissionsnettet, og de tre øvrige virksomheder, heriblandt Electricity North West, er distributionsnetselskaber. Det gør ScottishPower til Storbritanniens næststørste distributionsnetselskab, der leverer el til omkring 12 mio. mennesker via et net på over 170.000 kilometer.

Customer business leverede gas og el til 4,2 mio. kunder ved udgangen af 2025. Divisionen installerer også varmepumper, solpaneler, batterilagring og opladning af elbiler, med særlige tariffer for varmepumper og elbilsopladning og Storbritanniens første landsdækkende årlige serviceaftale for varmepumper.

Projekter og erfaring

Renewable production udvikler, bygger og driver vedvarende energianlæg, primært vindkraft til havs og på land. Divisionen driver over 40 landbaserede anlæg samt havvindmølleparkerne East Anglia One og West of Duddon Sands, i alt 3 GW kapacitet i drift. East Anglia One ejes 60/40 af ScottishPower og Bilbao Offshore Holding Limited, og West of Duddon Sands drives sammen med Orsted Schroders Greencoat.

På land gik den repowerede vindmøllepark Hagshaw Hill (80 MW) i kommerciel drift den 31. oktober 2025: 14 nye møller erstattede de oprindelige 26, og anlægget har nu fem gange sin oprindelige kapacitet. Batterianlægget Harestanes (50 MW) gik i kommerciel drift den 15. september 2025 og Kilgallioch Extension Windfarm (51 MW) i marts 2026 med ni ekstra møller.

Til havs bygges East Anglia Three på 1,4 GW 69 kilometer ud for Suffolks kyst med 95 møller fra Siemens Gamesa, Storbritanniens første havvindprojekt med 115 meter lange vinger. Den første mølle blev rejst i april 2026, og projektet til 4 mia. £ har været drevet 50/50 sammen med Masdar, siden en ejerandel på 50 % blev solgt til Masdar i juli 2025. Dets offshore-konverterstation, ScottishPowers første, er den største, der nogensinde er bygget i Iberdrola-koncernen. East Anglia Two er i sin byggefase, der løber fra 2026 til 2028.

Den britiske projektportefølje frem til 2038 rummer omkring 3 GW havvind i East Anglia-zonen, ScotWind-porteføljen på 5 GW med det flydende MarramWind (3 GW) og det bundfaste MachairWind (2 GW) samt omkring 5 GW mulige projekter inden for landvind, sol og batterier. På nettet skal Eastern Green Link 1, der udvikles med National Grid Electricity Transmission, forbinde Torness i East Lothian med Hawthorn Pit i County Durham, og Siemens Energy er foretrukken tilbudsgiver på de to HVDC-konverterstationer til Eastern Green Link 4.

Seneste nyt

Iberdrola præsenterede i september 2025 en strategiplan på 58 mia. € med Storbritannien som sit vigtigste investeringsmål, og ScottishPower investerer 24 mia. £ over fem år frem til 2028. I december 2025 godkendte Ofgems endelige afgørelse ScottishPowers investeringsplaner på 12 mia. £ for transmissionsnettet i perioden 2026-2031. I maj 2025 gav National Wealth Fund tilsagn om 600 mio. £ til netudbygningen som del af en finansieringspakke på 1,35 mia. £ under ledelse af Bank of America, der støtter syv prioriterede transmissionsprojekter.

I marts 2025 godkendte Competition and Markets Authority købet af en ejerandel på 88 % i Electricity North West, og omkring 2.550 af dets medarbejdere kom til ScottishPower i løbet af 2025. I november 2025 gav en transaktion med Shell ScottishPower Renewables det fulde ejerskab af MarramWind-projektet.

At arbejde der

ScottishPower har budt velkommen til over 1.000 nyansatte, siden selskabet i november 2024 annoncerede vækst i medarbejderstaben for 2025. Et rekordantal på 338 dimittender og elever startede i september 2025 i roller inden for bl.a. ingeniørarbejde, cybersikkerhed og projektledelse, fra Glasgow over Merseyside og Nordwales til London. I 2025 åbnede Energy Networks et nyt kontor i Edinburgh til sine transmissionsteams, herunder dem, der bygger søkabelforbindelser ud for Skotlands øst- og vestkyst, og koncernen blev akkrediteret som 2025 Top Employer af Top Employers Institute.

Mange stillinger giver mulighed for hybridarbejde. Familieorloven omfatter 26 ugers fuld løn ved barsel og adoption og 8 ugers fuld løn ved fædreorlov, og programmet "Your ScottishPower Benefits" lader medarbejderne vælge goder som Share Incentive Plan, Cycle to Work-ordningen og køb af ekstra feriedage.

Flere lignende elnet og forsyning-job

Ledende ingeniør (systemudvikling)
Scottish Power · 63.200–79.000 £/år